A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects

Project managers are the ones who struggle to complete the project with the shortest possible time, the least amount of costs and, the highest quality. The primary objective in the planning stage o...

[1]  Hong Zhang,et al.  Fuzzy-multi-objective particle swarm optimization for time―cost―quality tradeoff in construction , 2010 .

[2]  Yaonan Wang,et al.  Environmental/economic power dispatch problem using multi-objective differential evolution algorithm , 2010 .

[3]  Mehdi Tavakolan,et al.  Developing an optimization financing cost-scheduling trade-off model in construction project , 2019, International Journal of Construction Management.

[4]  Abdelouahab Moussaoui,et al.  A guided population archive whale optimization algorithm for solving multiobjective optimization problems , 2020, Expert Syst. Appl..

[5]  Khaled A El-Rayes,et al.  Automated trade‐off between time and cost in planning repetitive construction projects , 2009 .

[6]  Kuo-Shun Sun,et al.  System development for non-unit based repetitive project scheduling , 2005 .

[7]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[8]  Su-Ling Fan,et al.  GA optimization model for repetitive projects with soft logic , 2012 .

[9]  Shu-Shun Liu,et al.  Optimizing linear project scheduling with multi-skilled crews , 2012 .

[10]  Xin Zou,et al.  Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic , 2016 .

[11]  Kris G. Mattila,et al.  Comparison of Linear Scheduling Model and Repetitive Scheduling Method , 2003 .

[12]  Khaled A El-Rayes,et al.  Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost , 2018 .

[13]  Millie Pant,et al.  An efficient Differential Evolution based algorithm for solving multi-objective optimization problems , 2011, Eur. J. Oper. Res..

[14]  Nalina Suresh,et al.  Project management with time, cost, and quality considerations , 1996 .

[15]  Khaled A El-Rayes,et al.  Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .

[16]  Gholamreza Heravi,et al.  Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects , 2019, KSCE Journal of Civil Engineering.

[17]  Reza Akbari,et al.  A multi-objective artificial bee colony algorithm , 2012, Swarm Evol. Comput..

[18]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .

[19]  Kamal Sharma,et al.  Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects , 2020, International Journal of Construction Management.

[20]  Francisco Moreno,et al.  A Fixed Start Scheduling Approach for Repetitive Construction Projects , 2020 .

[21]  Duc-Long Luong,et al.  MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM , 2019, JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT.

[22]  Khalied Hyari,et al.  Optimal Planning and Scheduling for Repetitive Construction Projects , 2006 .

[23]  Zhen He,et al.  Multiobjective feature selection for key quality characteristic identification in production processes using a nondominated-sorting-based whale optimization algorithm , 2020, Comput. Ind. Eng..

[24]  Fatma A. Agrama Multi-objective genetic optimization for scheduling a multi-storey building , 2014 .

[25]  I-Tung Yang,et al.  Repetitive Scheduling Method: Requirements, Modeling, and Implementation , 2016 .

[26]  Do Ba Khang,et al.  Time, cost and quality trade-off in project management: a case study , 1999 .

[27]  Marco Laumanns,et al.  Performance assessment of multiobjective optimizers: an analysis and review , 2003, IEEE Trans. Evol. Comput..

[28]  Piotr Jaśkowski,et al.  New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects , 2020 .

[29]  I-Tung Yang,et al.  Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .

[30]  Seyed Mohammad Mirjalili,et al.  A hyper-heuristic for improving the initial population of whale optimization algorithm , 2019, Knowl. Based Syst..

[31]  Hamidreza Maghsoudlou,et al.  A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem , 2016, Comput. Chem. Eng..

[32]  Tarek Hegazy,et al.  COST OPTIMIZATION IN PROJECTS WITH REPETITIVE NONSERIAL ACTIVITIES , 2001 .

[33]  Xinhua He,et al.  An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation , 2014, TheScientificWorldJournal.

[34]  Chun-Yen Huang,et al.  Resource-constrained scheduling for continuous repetitive projects with time-based production units , 2009 .

[35]  Lingfeng Wang,et al.  Reserve-constrained multiarea environmental/economic dispatch based on particle swarm optimization with local search , 2009, Eng. Appl. Artif. Intell..

[36]  Kuo-Shun Sun,et al.  Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects , 2004 .

[37]  Yaonan Wang,et al.  Multi-objective self-adaptive differential evolution with elitist archive and crowding entropy-based diversity measure , 2010, Soft Comput..

[38]  A. Samer Ezeldin,et al.  Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects , 2009 .

[39]  Fuad E. Alsaadi,et al.  A competitive mechanism integrated multi-objective whale optimization algorithm with differential evolution , 2021, Neurocomputing.

[40]  Amir Abbas Najafi,et al.  A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations , 2014, Comput. Oper. Res..

[41]  Lihui Zhang,et al.  A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic , 2020 .

[42]  Anjul Tomar,et al.  Generation, visualization, and evaluation schedule of repetitive construction projects using GIS , 2019 .

[43]  Ario Ohsato,et al.  A genetic algorithm-based method for scheduling repetitive construction projects , 2009 .

[44]  Yancang Li,et al.  Modified Whale Optimization Algorithm Based on Tent Chaotic Mapping and Its Application in Structural Optimization , 2020, KSCE Journal of Civil Engineering.

[45]  Ahmed Senouci,et al.  Multiobjective optimization model for scheduling of construction projects under extreme weather , 2016 .

[46]  Qian Zhang,et al.  Work continuity constraints in repetitive project scheduling considering soft logic , 2020 .

[47]  Andrew Lewis,et al.  The Whale Optimization Algorithm , 2016, Adv. Eng. Softw..

[48]  Nima Hamta,et al.  Presenting a goal programming model in the time-cost-quality trade-off , 2018 .

[49]  Jingjing Du,et al.  Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization , 2014 .

[50]  Lothar Thiele,et al.  Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..

[51]  Haruna Chiroma,et al.  Whale optimization algorithm: a systematic review of contemporary applications, modifications and developments , 2020, Neural Computing and Applications.