Scheduling and control of start-up process for time-constrained single-arm cluster tools with parallel chambers
暂无分享,去创建一个
NaiQi Wu | Kaizhou Gao | FaJun Yang | Yan Qiao | Yuting Zhu | Rong Su | Ian Ware Simon
[1] MengChu Zhou,et al. Scheduling and Control of Startup Process for Single-Arm Cluster Tools With Residency Time Constraints , 2017, IEEE Transactions on Control Systems Technology.
[2] MengChu Zhou,et al. Petri Net-Based Scheduling of Single-Arm Cluster Tools With Reentrant Atomic Layer Deposition Processes , 2011, IEEE Transactions on Automation Science and Engineering.
[3] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[4] Babak Hamidzadeh,et al. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints , 2001, IEEE Trans. Robotics Autom..
[5] Jun-Ho Lee,et al. Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets , 2015, IEEE Transactions on Automation Science and Engineering.
[6] Jun-Ho Lee,et al. Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm , 2015, IEEE Transactions on Automation Science and Engineering.
[7] MengChu Zhou,et al. Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[8] MengChu Zhou,et al. Process vs resource‐oriented Petri net modeling of automated manufacturing systems , 2010 .
[9] Jun-Ho Lee,et al. Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.
[10] MengChu Zhou,et al. Optimal One-Wafer Cyclic Scheduling of Time-Constrained Hybrid Multicluster Tools via Petri Nets , 2017, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[11] Tatsushi Nishi,et al. Petri Net Decomposition Approach to Deadlock-Free and Non-Cyclic Scheduling of Dual-Armed Cluster Tools , 2015, IEEE Transactions on Automation Science and Engineering.
[12] Jun-Ho Lee,et al. Makespan Analysis of Lot Switching Period in Cluster Tools , 2016, IEEE Transactions on Semiconductor Manufacturing.
[13] MengChu Zhou,et al. Petri Net-Based Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Wafer Fabrication , 2014, IEEE Transactions on Semiconductor Manufacturing.
[14] MengChu Zhou,et al. Petri Net-Based Polynomially Complex Approach to Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Semiconductor Manufacturing , 2014, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[15] MengChu Zhou,et al. Maximally permissive distributed control of large scale automated manufacturing systems modeled with Petri nets , 2013, 2013 IEEE International Conference on Automation Science and Engineering (CASE).
[16] S. C. Wood,et al. Systems of multiple cluster tools: configuration, reliability, and performance , 2003 .
[17] Rong Su,et al. Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets , 2018, IEEE/CAA Journal of Automatica Sinica.
[18] MengChu Zhou,et al. Response Policies to Process Module Failure in Single-Arm Cluster Tools Subject to Wafer Residency Time Constraints , 2015, IEEE Transactions on Automation Science and Engineering.
[19] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[20] Tae-Eog Lee,et al. An extended event graph with negative places and tokens for time window constraints , 2005, IEEE Transactions on Automation Science and Engineering.
[21] MengChu Zhou,et al. A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.
[22] MengChu Zhou,et al. Optimal one-wafer cyclic scheduling analysis of hybrid multi-cluster tools with one-space buffering module , 2014, 2014 IEEE International Conference on Robotics and Automation (ICRA).
[23] H. Neil Geismar,et al. Increasing throughput for robotic cells with parallel Machines and multiple robots , 2004, IEEE Transactions on Automation Science and Engineering.
[24] MengChu Zhou,et al. Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing , 2015, IEEE Transactions on Semiconductor Manufacturing.