A method for man hour optimisation and workforce allocation problem with discrete and non-numerical constraints in large-scale one-of-a-kind production

In one-of-a-kind production (OKP), how to coordinate workforce allocations to obtain reasonable man-hour has the practical significance. However, plenty of variables and complicated operation relationships are involved, which implies the man-hour optimisation in OKP belongs to a constrained mixed discrete optimisation problem. In this article, to deal with the man-hour optimisation in large-scale OKP which often refers to complex production, e.g. shipbuilding, we introduce a top-down refinement method to specialise the product design and production decomposition in OKP, which also indicates the operation relationships of the interim product production processes. Consequently, we suggest three basic task structures which are with wide adaptability in OKP industry: tandem structure, parallel structure and double-level-nested parallel structure. Meanwhile, for the double-level-nested parallel structure, a method based on matrix real-coded genetic algorithm and dynamic programming is presented to solve the man-hour optimisation and labour force allocation problem. Through the case studies, including an industrial implementation in the shipbuilding interim product (i.e. a hull block) production, our optimisation method demonstrates significant potential to improve the production efficiency.

[1]  Deyi Xue,et al.  Identification of the optimal product configuration and parameters based on individual customer requirements on performance and costs in one-of-a-kind production , 2008 .

[2]  Y. L. Tu,et al.  A reconfigurable platform in support of one-of-a-kind product development , 2005 .

[3]  Ole Madsen,et al.  Cybernetic Modelling and Control in Integrated Production Systems - A project Overview , 1993 .

[4]  Dejan Slobodan Aleksić,et al.  A case study on the object-oriented framework for modeling product families with the dominant variation of the topology in the one-of-a-kind production , 2011, The International Journal of Advanced Manufacturing Technology.

[5]  Wenyu Yang,et al.  Computer-aided process planning in virutal one-of-a-kind production , 2000 .

[6]  Deyi Xue,et al.  Operator allocation planning for reconfigurable production line in one-of-a-kind production , 2011 .

[7]  Deyi Xue,et al.  Rapid identification of the optimal product configuration and its parameters based on customer-centric product modeling for one-of-a-kind production , 2010, Comput. Ind..

[8]  B. R. Nault,et al.  Dynamic Price Quotation in a Responsive Supply Chain for One-Of-A-Kind Production , 2011 .

[9]  Hermann Lödding,et al.  State-Oriented Productivity Analysis in One-of-a-Kind-Production , 2013, APMS.

[10]  Deyi Xue,et al.  Adaptive Production Scheduling and Control in One-Of-A-Kind Production , 2012 .

[11]  Zhibin Jiang,et al.  Colored Petri Nets with changeable structures (CPN-CS) and their applications in modeling one-of-a-kind production (OKP) systems , 2001 .

[12]  B. K. Choi,et al.  Dispatching rules for dynamic scheduling of one-of-a-kind production , 2006, Int. J. Comput. Integr. Manuf..

[13]  Yiliu Tu,et al.  Production planning and control in a virtual one-of-a-kind production company , 1997 .

[14]  Xun Xu,et al.  Recent development of knowledge-based systems, methods and tools for One-of-a-Kind Production , 2011, Knowl. Based Syst..

[15]  Jiang Zu-hua The Intelligent Man-Hour Estimate Technique of Assembly for Shipbuilding , 2005 .

[16]  Deyi Xue,et al.  Optimal resource allocation for hybrid flow shop in one-of-a-kind production , 2010, Int. J. Comput. Integr. Manuf..

[17]  Zhibin Jiang,et al.  Automatic Modelling of One-of-a-Kind Production Systems by Temporised Object-Oriented Petri Nets with Changeable Structure (TOPNs–CS) , 2003 .

[18]  Ray Y. Zhong,et al.  A radio frequency identification-enabled real-time manufacturing execution system for one-of-a-kind production manufacturing: a case study in mould industry , 2012, Int. J. Comput. Integr. Manuf..

[19]  Xiao Liu,et al.  Capacitated production planning with outsourcing in an OKP company , 2008 .