Labor crew workspace analysis for prefabricated assemblies’ installation: A 4D-BIM-based approach
暂无分享,去创建一个
[1] Bonsang Koo,et al. An empirical study of MEP workspace modeling approaches for 4D model-based time-space conflict analyses: Case study on the international linear collider project , 2013 .
[2] Jonghoon Kim,et al. Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models , 2008 .
[3] Ann T. W. Yu,et al. Comparison of low‐waste building technologies adopted in public and private housing projects in Hong Kong , 2003 .
[4] David K. H. Chua,et al. Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design , 2010 .
[5] Vineet R. Kamat,et al. Grid Cell-based Algorithm for Workspace Overlapping Analysis Considering Multiple Allocations of Construction Resources , 2014 .
[6] Charles M. Eastman,et al. Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning , 2015 .
[7] Stephan Ott,et al. Surveying and digital workflow in energy performance retrofit projects using prefabricated elements , 2011 .
[8] E. Gambao,et al. Extending automation of building construction — Survey on potential sensor technologies and robotic applications , 2013 .
[9] Chih-Chen Chang,et al. A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning , 2015 .
[10] Martin Fischer,et al. Automated Generation of Work Spaces Required by Construction Activities , 2002 .
[11] Xing Su,et al. Life Cycle Approach to Construction Workspace Modeling and Planning , 2014 .
[12] Danijel Rebolj,et al. Integrating resource production and construction using BIM , 2010 .
[13] L. Madrazo,et al. Connecting building component catalogues with BIM models using semantic technologies: an application for precast concrete components , 2015 .
[14] Vacharapoom Benjaoran,et al. Enhancing visualization of 4D CAD model compared to conventional methods , 2009 .
[15] Daniel Forgues,et al. Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research , 2015 .
[16] Nawari O. Nawari. BIM Standard in Off-Site Construction , 2012 .
[17] Sy-Jye Guo,et al. Identification and Resolution of Work Space Conflicts in Building Construction , 2002 .
[18] Hyeon-Seung Kim,et al. Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces , 2014 .
[19] Heng Li,et al. Proactive training system for safe and efficient precast installation , 2015 .
[20] Peter E.D. Love,et al. Real time progress management: Re-engineering processes for cloud-based BIM in construction , 2015 .
[21] David K. H. Chua,et al. Automated construction sequencing and scheduling from functional requirements , 2013 .
[22] Zaki Mallasi,et al. Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation , 2006 .
[23] Nashwan Dawood,et al. Construction workspace management within an Industry Foundation Class-Compliant 4D tool , 2015 .
[24] Hyunsoo Kim,et al. Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects , 2014 .
[25] Burcu Akinci,et al. Automated generation of workspace requirements of mobile crane operations to support conflict detection , 2007 .
[26] Timo Hartmann,et al. 4D CAD models to support the coordination of construction activities between contractors , 2015 .
[27] Christopher Nigel Preece,et al. Adoption of Building Information Modelling technology (BIM): Perspectives from Malaysian engineering consulting services firms , 2015 .
[28] Bo Xu,et al. A BIM-based approach for automated tower crane layout planning , 2015 .
[29] Mani Golparvar-Fard,et al. Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs , 2015 .
[30] Hyunjoo Kim,et al. Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology , 2013 .
[31] Amin Hammad,et al. Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects , 2015 .
[32] Heng Li,et al. A 4D automatic simulation tool for construction resource planning: A case study , 2015 .
[33] Alan R. Hevner,et al. Design Science in Information Systems Research , 2004, MIS Q..
[34] Nashwan Dawood,et al. Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies , 2006, Comput. Aided Civ. Infrastructure Eng..
[35] Per Anker Jensen,et al. Building information modelling in Denmark and Iceland , 2013 .
[36] J. Aken. Management Research Based on the Paradigm of the Design Sciences: The Quest for Field-Tested and Grounded Technological Rules , 2004 .
[37] Timo Hartmann,et al. Aligning building information model tools and construction management methods , 2012 .