Digital Kanban for Earthwork Site Management

In the manufacturing industry the use of information systems based on modern communication techniques, such as Material Requirements Planning (MRP), Enterprise Resource Planning (ERP) or Customer Relationship Management (CRM) Systems, is standard and has long been deployed with success. But these systems depend on consistency in the production systems, which a construction site is unlikely to offer. Furthermore the construction process is highly fragmented and in comparison to the stationary industry very complex. Due to the dynamics of the processes on earthwork construction sites, new flexible logistic concepts are needed. This paper will present “digital Kanban”; a method to dynamically allocate the best possible match of excavators and transport vehicles at earthwork construction sites. With regard to the principles of jidoka, “intelligence” is transferred to a control centre in order to detect abnormal conditions, enabling it to respond rapidly. Excavators are pulling empty dumpers and dozers are pulling loaded dumpers. In case more than one excavator is requesting a dumper, the current performance of the excavators and their allocated dumpers at the present as well as the distance to be travelled will be analysed. The digital Kanban cards are created at the last responsible moment: If a dumper just unloaded or is fully loaded, it requests a Kanban card and only then the Kanban card will be generated. To quantify the optimization potential, results of stochastic simulations based on the Monte-Carlo method will be introduced.

[1]  Martin Bichler,et al.  Design science in information systems research , 2006, Wirtschaftsinf..

[2]  L. Liu,et al.  A Theoretical Framework of an Integrated Logistics System for UK Construction Industry , 2007, 2007 IEEE International Conference on Automation and Logistics.

[3]  Douglas D. Gransberg Optimizing haul unit size and number based on loading facility characteristics , 1996 .

[4]  Yakov Shafranovich,et al.  Common Format and MIME Type for Comma-Separated Values (CSV) Files , 2005, RFC.

[5]  Cliff Schexnayder,et al.  Effect of truck payload weight on production , 1999 .

[6]  Chimay J. Anumba,et al.  Mobile ICT support for construction process improvement , 2006 .

[7]  Yerach Doytsher,et al.  Automated Productivity Measurement Model of Two-dimensional Earthmoving-equipment Operations , 2012 .

[8]  T. A. Bray,et al.  A Convenient Method for Generating Normal Variables , 1964 .

[9]  N. Dawood,et al.  CONSTRUCTION PLANNING PROCESS IMPROVEMENT USING INFORMATION TECHNOLOGY TOOLS , 2002 .

[10]  Jörg Leukel,et al.  Individualization of Goods and Services: Towards a Logistics Knowledge Infrastructure for Agile Supply Chains , 2011, AAAI Spring Symposium: AI for Business Agility.

[11]  Ronie Navon,et al.  Automated project performance control of construction projects , 2005 .

[12]  Henry C. Lucas,et al.  Analyzing Enterprise Resource Planning System Implementation Success Factors in the Engineering–Construction Industry , 2008 .

[13]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .

[14]  I. D. Hill,et al.  Generating good pseudo-random numbers , 2006, Comput. Stat. Data Anal..

[15]  Bhargav Dave,et al.  Improving information flow within the production management system with web services , 2010 .

[16]  Vijay K. Vaishnavi,et al.  Design Science Research Methods and Patterns: Innovating Information and Communication Technology , 2007 .

[17]  Jyh-Bin Yang,et al.  Selection of an ERP system for a construction firm in Taiwan: A case study , 2007 .

[18]  Fritz Gehbauer,et al.  Digital allocation of production factors in earth work construction , 2012 .

[19]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[20]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[21]  Nashwan Dawood,et al.  Construction planning process improvement using information technology , 2000 .

[22]  Alan M. Lytle,et al.  Report of the NIST Workshop on Data Exchange Standards at the Construction Job Site , 2003 .

[23]  Saad H.S. Al-Jibouri,et al.  Planning linear construction projects: automated method for the generation of earthwork activities , 2002 .

[24]  Gerhard Girmscheid,et al.  Leistungsermittlungshandbuch für Baumaschinen und Bauprozesse , 2010 .

[25]  Daniel W. Halpin,et al.  Enterprise Resource Planning for Construction Business Management , 2003 .

[26]  Omer Tatari,et al.  Current state of construction enterprise information systems: survey research , 2007 .

[27]  Jimmie Hinze,et al.  Construction Planning and Scheduling , 1997 .

[28]  Stephen Barthorpe,et al.  A survey of the potential for enterprise resource planning (ERP) in improving the effectiveness of construction management in the UK construction industry , 2004, Int. J. Comput. Appl. Technol..

[29]  Ghassan Aouad,et al.  A Vision for Construction IT 2005-2010: Two Case Studies. , 2002 .

[30]  Cynthia Rettig The Trouble With Enterprise Software , 2007 .

[31]  Rafael Sacks,et al.  Building Project Model Support for Automated Labor Monitoring , 2003 .

[32]  François Peyret,et al.  Open System for Road Information Support , 2001 .

[33]  Syed M. Ahmed,et al.  Implementation of Enterprise Resource Planning (ERP) Systems in the Construction Industry , 2003 .

[34]  Ronie Navon,et al.  A concept proving prototype of automated earthmoving control , 2004 .

[35]  E. Brynjolfsson,et al.  Computing Productivity: Firm-Level Evidence , 2003, Review of Economics and Statistics.

[36]  Miroslaw J. Skibniewski,et al.  Developing ERP Systems Success Model for the Construction Industry , 2009 .

[37]  Ian Davidson,et al.  Simulation of Automated Data Collection in Buildings , 1995 .

[38]  Algan Tezel,et al.  Design science research in lean construction : process and outcomes , 2012 .

[39]  Bob McCulloch Automating Field Data Collection in Construction Organizations , 1997 .

[40]  Vít Mejda Implementation of enterprise resource planning , 2013 .

[41]  Daniel Castro-Lacouture,et al.  Performance Evaluation of Construction Enterprise Resource Planning Systems , 2008 .

[42]  Vijay K. Vaishnavi,et al.  Theory Development in Design Science Research: Anatomy of a Research Project , 2008 .