An innovative approach for gateroad layout in highly gassy longwall top coal caving
暂无分享,去创建一个
[1] Adrian Moodie,et al. Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine , 2011 .
[2] H. Yavuz,et al. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines , 2004 .
[3] Bahtiyar Ünver,et al. Modelling of strata movement with a special reference to caving mechanism in thick seam coal mining , 2006 .
[4] Xie Pin-zhou. Study on Failure Regularity and Reasonable Dimension of District Sublevel Small Coal Pillar , 2007 .
[5] D. J. Reddish,et al. The relation between in situ and laboratory rock properties used in numerical modelling , 1997 .
[6] Ashok Jaiswal,et al. Numerical simulation of coal pillar strength , 2009 .
[7] Bai Jian,et al. Control mechanism and support technique about gateway driven along goaf in fully mechanized top coal caving face , 2000 .
[8] Bahtiyar Ünver,et al. 3D numerical modeling of longwall mining with top-coal caving , 2005 .
[9] Y. M. Cheng,et al. Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face , 2010 .