Compressing construction durations: lessons learned from Hong Kong building projects

Abstract This paper explores explanations for possible causative patterns and suggestions for strategies to compress the construction durations of various types of building projects, on the basis of the lessons learned from recent Hong Kong-based surveys and research findings. A review of the literature from different countries is first provided — on the factors affecting construction durations, reasons for project delays and existing statistical models for duration forecasts. This is followed by the presentation of a regression-based model — developed from Hong Kong public housing construction project data — for predicting the durations of the primary work packages in the building process and the overall completion period. Finally, the principal survey results of three parallel investigations which sought out the critical contributors to faster construction in Hong Kong within each of three different building sub-sectors — public housing, public non-residential buildings and private sector buildings — are presented and discussed. Both similarities and differences are noted among the many perceived important contributory factors and factor categories, across the various types of industry practitioners, i.e. clients, consultants and contractors. Based on the factors identified as significant from the above recent research findings, specific technological and managerial strategies for reducing construction periods (increasing construction speed) in particular building sub-sectors are formulated in order to improve the construction time performance of local building projects. The research methodology developed for the reported investigations can well be extended to similar studies in other sub-sectors in Hong Kong, as well as in other countries for international comparisons — so as to expand our existing body of knowledge of the critical success factors in compressing the building construction process.

[1]  Andrew D.F. Price,et al.  Relationship between value and duration for construction projects , 1991 .

[2]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[3]  Leonhard E. Bernold,et al.  Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement , 1994 .

[4]  Mohan M. Kumaraswamy,et al.  Modelling and predicting construction durations in Hong Kong public housing , 1999 .

[5]  Wai-ming Chan,et al.  Modelling construction durations for public housing projects in Hong Kong , 1998 .

[6]  Raymond N. Nkado Construction time information system for the building industry , 1992 .

[7]  Derek H.T. Walker,et al.  An investigation into construction time performance , 1995 .

[8]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[9]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[10]  Mohan M. Kumaraswamy,et al.  A study of the factors affecting construction durations in Hong Kong , 1995 .

[11]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[12]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[13]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[14]  Farzad Khosrowshahi,et al.  Estimation of project total cost and duration for housing projects in the U.K. , 1996 .

[15]  A. Shash Factors considered in tendering decisions by top UK contractors , 1993 .

[16]  Vernon Ireland,et al.  The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .

[17]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[18]  Mohan M. Kumaraswamy,et al.  Determinants of construction duration , 1995 .

[19]  Mohan M. Kumaraswamy,et al.  Contributors to construction delays , 1998 .

[20]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[21]  Andrew Baldwin,et al.  A methodology for assessing construction project delays , 1998 .

[22]  Raymond Nkado Construction time-influencing factors: the contractor's perspective , 1995 .