Coping with the build-to-forecast environment

[1]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[2]  B. Kingsman,et al.  Production planning systems and their applicability to make-to-order companies , 1989 .

[3]  Phillip J. Lederer,et al.  Choosing Manufacturing Production Control And Cost Accounting Systems , 1989 .

[4]  J. L. Bower,et al.  Fast-Cycle Capability for Competitive Power , 1988 .

[5]  Samuel E. Bodily,et al.  A Simulation of Techniques for Forecasting Shipments Using Firm Orders-to-Date , 1988 .

[6]  G. Stalk Time-The Next Source of Competitive Advantage , 1988 .

[7]  Izak Benbasat,et al.  The Case Research Strategy in Studies of Information Systems , 1987, MIS Q..

[8]  Jeffrey D. Camm,et al.  Resource allocation in the crew assembly process , 1987 .

[9]  K. R. Baker,et al.  The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .

[10]  R. R. Jesse On the retention of finished goods inventory when reorder-occurrence is uncertain , 1986 .

[11]  Ersell Powell Robinson Product variety, production strategy, and distribution strategy , 1985 .

[12]  Thomas R. Gulledge,et al.  A dynamic cost function for an airframe production program , 1983 .

[13]  R. Dierdonck,et al.  Designing production planning and control systems , 1980 .

[14]  R. Duane Ireland,et al.  Quantitative versus Qualitative: Environmental Assessment in Organizational Studies. , 1979 .

[15]  Jeffrey Miller Hedging the master schedule , 1979 .

[16]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[17]  W. Popp Simple And Combined Inventory Policies, Production to Stock or to Order? , 1965 .

[18]  Tom R. Burns,et al.  The Management of Innovation. , 1963 .