The Zanzibar blackout : A case study on consequences from an electricity power crisis

AbstractAvailability of electricity in developing countries is by no doubt a tool for development.However, the development cannot be sustainable if necessary back-up facilities are not in place.This is argued and demonstrated in this paper, using the last 10 years of development in Zanzibar as a case. In Zanzibar, the demand for electricity has grown fast and the amount of billed electricity increased with more than 50 % from year 2003 to year 2007. The highest increase can be seen in the medium sized industries sector, where the tourism sector consisted of a large proportion.With increased dependency of electricity, the fundament for a more vulnerable society is also created. This is illustrated by the economic and social depression that hit Zanzibar during the breakdowns of the power system that occurred for one month in 2008 and for almost three months in 2009-2010. As there where no public back-up generation facility in Zanzibar, this resulted in a total electrical blackout and the citizens had to rely on private electricity generation. In the paper some examples of the consequences are given.

[1]  Shaobo Zhong,et al.  Challenges and Opportunities in Emergency Management of Electric Power System Blackout , 2010, 2010 International Conference on E-Product E-Service and E-Entertainment.

[2]  G. Bortoni,et al.  Analyses and lessons to be learned from September 28th, 2003 black-out in Italy: a regulatory assessment , 2005 .

[3]  H. Kadete,et al.  Rural electrification in Tanzania. Past experiences - new approaches , 1992 .

[4]  P. Pentayya,et al.  Experience of blackouts and restoration practices in western region of India , 2004, IEEE Power Engineering Society General Meeting, 2004..

[5]  Elisabeth Ilskog,et al.  Delivery mechanisms for rural electrification , 2004 .

[6]  Thomas B Johansson,et al.  Energy for sustainable development in China , 2004 .

[7]  Ricard Sol'e,et al.  Analysis of major failures in Europe’s power grid , 2009, 0906.1109.

[8]  J. Kimani,et al.  Status of power sector reform in Africa: impact on the poor , 2002 .

[9]  G. Brundtland,et al.  Our common future , 1987 .

[10]  Tanzania. Ofisi ya Taifa ya Takwimu,et al.  Household budget survey , 2002 .

[11]  A. Allderdice,et al.  Renewable Energy for Microenterprise , 2000 .

[12]  Jevgenijs Steinbuks,et al.  When do firms generate? Evidence on in-house electricity supply in Africa , 2010 .

[13]  Elisabeth Ilskog And then they lived Sustainable ever after? : Part 1, Experiences from rural electrification in Tanzania, Zambia and Kenya , 2005 .

[14]  Massoud Amin North America's Electricity Infrastructure: Are We Ready for More Perfect Storms? , 2003, IEEE Secur. Priv..

[15]  Adeola Adenikinju,et al.  Analysis of the cost of infrastructure failures in a developing economy: The case of the electricity sector in Nigeria , 2005 .

[16]  G. R. Brundtland Our Common Future World Commission on Environment and Development , 1987 .

[17]  J. Kironde Dar es Salaam, Tanzania , 2019, The Statesman’s Yearbook Companion.