Sustainable Inventory Management

The Economic Order Quantity (EOQ) model, proposed by Harris in 1913, is one of the most studied models for the inventory management. The model aims at identifying the optimal lot size minimizing the total inventory costs, typically only holding and ordering costs. Many researchers extended this model trying to adapt it to real-life situation by providing new mathematical models. The increasing attention paid to sustainable manufacturing led, in the last years, to include the external costs of logistics in the EOQ model. Starting from a literature review on the inventory management models, this chapter defines the new Sustainable Order Quantity (SOQ) model. In the model, the loss factor parameter quantifies the loss in energy per unitary load transported and unitary distance covered, univocally identifying the various transport means. The optimal order quantity is derived minimizing a logistic cost function that considers both economic and social-environmental costs. The model allows determining at the same time the reorder level, the safety stock as well as the optimal transport means.

[1]  Giorgio Mossa,et al.  A loss factor based approach for sustainable logistics , 2012 .

[2]  M. Wahab,et al.  EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact , 2011 .

[3]  D. Battini,et al.  A sustainable EOQ model: Theoretical formulation and applications , 2014 .

[4]  Metin Turkay,et al.  EOQ Revisited with Sustainability Considerations , 2013 .

[5]  Yangfan Zhou,et al.  Research on Railway Freight Market Share Based on the Whole Process of Transport , 2014 .

[6]  Mark S. Daskin,et al.  Carbon Footprint and the Management of Supply Chains: Insights From Simple Models , 2013, IEEE Transactions on Automation Science and Engineering.

[7]  P. M. Ghare A model for an exponentially decaying inventory , 1963 .

[8]  M. Janić Modelling the full costs of an intermodal and road freight transport network , 2007 .

[9]  S. T. A. Niaki,et al.  An investigation of vendor-managed inventory application in supply chain: the EOQ model with shortage , 2010 .

[10]  Xin Zhang,et al.  Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .

[11]  Giorgio Mossa,et al.  SUPPLY LEAD TIME UNCERTAINTY IN A SUSTAINABLE ORDER QUANTITY INVENTORY MODEL , 2013 .

[12]  Dennis Postlethwaite,et al.  Development of Life Cycle Assessment (LCA) , 1994, Environmental science and pollution research international.

[13]  Poul Alstrøm,et al.  Numerical computation of inventory policies, based on the EOQ/σx value for order-point systems , 2001 .

[14]  Giorgio Mossa,et al.  Sustainable Order Quantity of Repairable Spare Parts , 2012 .

[15]  Yasin Ust,et al.  An approach for analysing transportation costs and a case study , 2009, Eur. J. Oper. Res..

[16]  Bjørn Egil Asbjørnslett,et al.  Assessment of profit, cost and emissions by varying speed as a function of sea conditions and freight market , 2013 .

[17]  Alexandre Dolgui,et al.  Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm , 2009, Eur. J. Oper. Res..

[18]  Michael Godfrey,et al.  Incorporating transportation costs into inventory replenishment decisions , 2002 .

[19]  Franklin Farell Roadmap to a Single European Transport Area: Towards a competitive and resource efficient transport system , 2014 .

[20]  M. Hariga,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[21]  T. Cheng,et al.  Managing carbon footprints in inventory management , 2011 .

[22]  Yves Dallery,et al.  Including sustainability criteria into inventory models , 2012, Eur. J. Oper. Res..

[23]  Giorgio Mossa,et al.  A sustainable EOQ model for repairable spare parts under uncertain demand , 2015 .

[24]  Giorgio Mossa,et al.  Internalisation strategies of external costs of transport for a sustainable logistics , 2016 .

[25]  Mohammed A. Darwish,et al.  Joint determination of order quantity and reorder point of continuous review model under quantity and freight rate discounts , 2008, Comput. Oper. Res..

[26]  William J. Baumol,et al.  An Inventory Theoretic Model of Freight Transport Demand , 1970 .

[27]  Y. Gerchak,et al.  Continuous Review Inventory Models Where Random Lead Time Depends on Lot Size and Reserved Capacity , 2000 .

[28]  Hung-Chang Liao,et al.  An inventory model with deteriorating items under inflation when a delay in payment is permissible , 2000 .

[29]  Maurice Bonney,et al.  An economic order quantity (EOQ) for items with imperfect quality and inspection errors , 2011 .

[30]  Giorgio Mossa,et al.  A Sustainable Order Quantity Model under Uncertain Product Demand , 2013, MIM.

[31]  S. Aggarwal,et al.  Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .

[32]  Mohamed Ben-Daya,et al.  Some stochastic inventory models with deterministic variable lead time , 1999, Eur. J. Oper. Res..

[33]  Matthew J. Liberatore,et al.  Technical Note - The EOQ Model under Stochastic Lead Time , 1979, Oper. Res..

[34]  Yu-Cheng Hsiao,et al.  Optimal reorder point inventory models with variable lead time and backorder discount considerations , 2004, Eur. J. Oper. Res..

[35]  Alessandro Persona,et al.  External cost effects and freight modal choice: research and application , 2011 .

[36]  George C. Philip,et al.  An EOQ Model for Items with Weibull Distribution Deterioration , 1973 .

[37]  Ping Wang,et al.  Recursive Behavior of Safety Stock Reduction: The Effect of Lead-Time Uncertainty , 2006, Decis. Sci..

[38]  Richard J. Tersine,et al.  Economic Inventory/Transport Lot, Sizing with Quantity and Freight Rate Discounts , 1991 .

[39]  T. H. Burwell,et al.  Economic lot size model for price-dependent demand under quantity and freight discounts , 1997 .

[40]  L.-C. Lin,et al.  An EOQ model for deteriorating items with price- and stock-dependent selling rates under inflation and time value of money , 2006, Int. J. Syst. Sci..

[41]  Metin Çakanyildirim,et al.  Random lead times and expedited orders in (Q, r) inventory systems , 1999, Eur. J. Oper. Res..

[42]  Robert W. Grubbström,et al.  The EOQ with backlogging derived without derivatives , 1999 .

[43]  J. C. Hayya,et al.  The cost of lead-time variability: The case of the exponential distribution , 2005 .

[44]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[45]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[46]  J. Buzacott Economic Order Quantities with Inflation , 1975 .

[47]  M. Jaber,et al.  Environmentally responsible inventory models: Non-classical models for a non-classical era , 2011 .

[48]  M. Darwish,et al.  Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..

[49]  Ira Horowitz,et al.  EOQ and inflation uncertainty , 2000 .

[50]  Kyung S. Park,et al.  Inventory model with partial backorders , 1982 .