A pilot-plant study was performed using a soil washing pilot plant originally designed by the Environmental Protection Agency (EPA) to demonstrate scale-up and potential full-scale remediation. This pilot plant named VORCE (Volume Reduction/Chemical Extraction) was modified to meet the specific requirements for treatment of the Formerly Utilized Sites Remedial Action Program (FUSRAP) and a Department of Energy site soils. After a series of tests on clean soils to develop operating parameters and system performance, the machine was used to treat soils, one contaminated with Thorium-232 and the other with Cesium-137. All indicate that soil washing is very promising for volume reduction treatment. In addition, cost data was generated and is given herein.