High-Turnaround and Flexibility in Design and Construction of Mass Housing

There is a tremendous housing shortage in the world that can only be overcome by innovative designs and enlightened production management. This paper presents a method for fast erection of apartment housing units that have architectural flexibility, manufacturing flexibility, and erection flexibility. The paper describes innovative jointing methods for large panel erection and presents characteristics of an appropriate structural system to correspond to the mechanical jointing and quick erection needs. Erection speeds using this method are about ten times as fast as conventional methods. Details of erection requirements and equipment are given.

[1]  Glenn Ballard,et al.  Implementing Lean Construction: Understanding and Action , 1998 .

[2]  Carlos T. Formoso,et al.  Design and Production Interface in Lean Production: A Performance Improvement Criteria Proposition , 1998 .

[3]  Joseph Edward Shigley,et al.  Mechanical engineering design , 1972 .

[4]  Amarjit Singh,et al.  Holistic enhancement of the production analysis of bituminous paving operations , 1998 .

[5]  Derk Th. Welling,et al.  Co-Ordinating the Supply Chain - Diffussing Lean Production in Construction , 1996 .

[6]  Sílvio Burrattino Melhado Designing for lean construction , 1998 .

[7]  Thomas F. Burgess,et al.  Making the Leap to Agility , 1994 .

[8]  Joseph J. Talavage,et al.  Methodology for Design of Efficient Flexible Construction Systems , 1991 .

[9]  D. Shepherd,et al.  Advanced manufacturing technology , 2000 .

[10]  Paulo Andery,et al.  Looking for What Could Be Wrong: An Approach to Lean Thinking , 1998 .

[11]  R. Delbridge Life on the line in contemporary manufacturing , 1998 .

[12]  J. Barlow From Craft Production to Mass Customisation? Customer-Focused Approaches to Housebuilding , 1998 .

[13]  Carlos Torres Formoso,et al.  Evaluating Building Systems Based on Productions Process Management and Lean Constructions Concepts , 1998 .

[14]  Miroslaw J. Skibniewski,et al.  Development of flexible production systems for strip mining , 1991 .

[15]  Christopher A. Voss,et al.  Managing Advanced Manufacturing Technology , 1986 .

[16]  Means,et al.  Building construction cost data , 1943 .

[17]  A. Rashad Abdel-Khalik,et al.  The Blackwell encyclopedic dictionary of operations management , 1997 .