An interactive, optimization-based decision support system for scheduling part-time, computer lab attendants

The labor tour scheduling problem has attracted much recent research, focusing on the development and evaluation of optimal and heuristic methods to minimize labor costs while satisfying demand for labor. Researchers typically assume that a sufficient labor pool is available. However, service organizations such as fast-food restaurants, grocery stores, and video rental stores, as well as not-for-profit organizations using volunteer workers, typically use a large number of part-time employees with limited availabilities for work. This study presents an interactive decision support system that addresses the conflicting objectives of efficient labor scheduling and accommodating employee needs. The system uses a linear programming model to provide sets of optimal shifts from which employees can construct acceptable weekly schedules; the manager may override the schedule if necessary. The decision support system is used to schedule student computer lab attendants at a major university in an efficient and equitable manner.

[1]  Gary M. Thompson Shift Scheduling in Services When Employees Have Limited Availability: An L. P. Approach , 1990 .

[2]  Stephen E. Bechtold IMPLICIT OPTIMAL AND HEURISTIC LABOR STAFFING IN A MULTIOBJECTIVE, MULTILOCATION ENVIRONMENT* , 1988 .

[3]  Stephen E. Bechtold,et al.  Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .

[4]  Lori S. Franz Data Driven Modeling: An Application in Scheduling , 1989 .

[5]  Cheng Li,et al.  An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost , 1991 .

[6]  William L. Berry,et al.  Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis , 1976 .

[7]  Larry W. Jacobs,et al.  A simulated annealing approach to the cyclic staff-scheduling problem , 1993 .

[8]  Stephen E. Bechtold,et al.  A METHODOLOGY FOR LABOR SCHEDULING IN A SERVICE OPERATING SYSTEM , 1987 .

[9]  C. B. Tilanus Failures and successes of quantitative methods in management , 1983 .

[10]  L. W. Jacobs,et al.  Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment , 1993 .

[11]  Kenneth R. Baker,et al.  Workforce Allocation in Cyclical Scheduling Problems: A Survey , 1976 .

[12]  Donald F. Rossin,et al.  Sufficient working subsets for the tour scheduling problem , 1991 .

[13]  Michael J. Showalter,et al.  Simple Approaches to Shift, Days-Off and Tour Scheduling Problems , 1983 .

[14]  Stephen E. Bechtold,et al.  A Comparative Evaluation of Labor Tour Scheduling Methods , 1991 .

[15]  F. Robert Jacobs,et al.  Tour Scheduling and Task Assignment of a Heterogeneous Work Force: A Heuristic Approach , 1991 .

[16]  Vincent A. Mabert,et al.  An Evaluation of a Full‐/Part‐time Tour Scheduling Methodology , 1988 .

[17]  George B. Dantzig,et al.  Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..

[18]  Aj Vakharia,et al.  Efficient Scheduling of Part-Time Employees , 1992 .