Thermal modelling and evaluation of borehole heat transfer.

The use of ground source heat pump systems to provide heating and cooling in buildings has increased greatly in the last decade or so. These systems have a high potential for energy efficiency, which has environmental and economic advantages. Moreover, the energy efficiency of the ground source heat pump systems can be further enhanced by optimizing the performance of the system. However, a key obstacle to the performance optimization of ground source heat pump systems is the scarcity of mathematical models that can rapidly, yet accurately, simulate the dynamic thermal response of the borehole system. This study aims to develop analytical models and methods that can simulate the thermal response of a borehole system in time scales from minutes to years. An analytical solution to model the short-time response of the borehole system is presented. The solution studies the heat transfer problem in the Laplace domain and provides an exact solution to the radial heat transfer problem in the borehole. A finite-length line-source solution to determine the long-term response of the borehole system is also presented. The line-source solution can be used for modelling both single and multiple borehole systems. The analytical and finitelength line-source solutions were combined to obtain step-response functions for various configurations of borehole systems. The step-response functions are valid from short (hours) to long (years) periods. A load aggregation method is also presented to speed up the simulations of the borehole systems. All the proposed models and methods can be easily implemented in any building energy simulation software to optimize the overall performance of ground source heat pump systems. The study also analyzes various aspects of the thermal response testing and evaluation of borehole systems. A ground source heat pump test facility with nine boreholes was used for the experimental investigations. Several thermal response tests were conducted for issues that include random variations between tests, sensitivity of system design to uncertainties in test results, convective heat transport in boreholes, and recovery times after a test. The evaluations of multiinjection rate tests on groundwater-filled boreholes were also extensively studied. Recommendations regarding each of these issues are suggested to improve the testing and evaluation procedure of borehole systems.

[1]  Gopal Bandyopadhyay,et al.  Analytical and semi-analytical solutions for short-time transient response of ground heat exchangers , 2008 .

[2]  Johan Claesson Radial heat flow for a pipe in a borehole in ground using Laplace solutions. Report on mathematical background , 2011 .

[3]  O. J. Zobel,et al.  Heat conduction with engineering, geological, and other applications , 1955 .

[4]  Li Shao,et al.  Simulation of a domestic ground source heat pump system using a three-dimensional numerical borehole heat exchanger model , 2011 .

[5]  Michaël Kummert,et al.  Development and application of test cases for comparing vertical ground heat exchanger models , 2007 .

[6]  J. Blackwell A Transient-Flow Method for Determination of Thermal Constants of Insulating Materials in Bulk Part I—Theory , 1954 .

[7]  Jeffrey D. Spitler,et al.  Development of an in-situ system and analysis procedure for measuring ground thermal properties , 2000 .

[8]  Louis Lamarche,et al.  A fast algorithm for the hourly simulations of ground-source heat pumps using arbitrary response factors , 2009 .

[9]  J. Spitler,et al.  Reference data sets for vertical borehole ground heat exchanger models and thermal response test ana , 2011 .

[10]  Richard A. Beier Equivalent Time for Interrupted Tests on Borehole Heat Exchangers , 2008 .

[11]  Vice President,et al.  AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS INC. , 2007 .

[12]  H. J. L. Witte GEOTHERMAL RESPONSE TESTS USING CONTROLLED MULTI-POWER LEVEL HEATING AND COOLING PULSES (MPL-HCP): QUANTIFYING GROUND WATER EFFECTS ON HEAT TRANSPORT AROUND A BOREHOLE HEAT EXCHANGER , 2006 .

[13]  R. Al-Khoury,et al.  Efficient finite element formulation for geothermal heating systems. Part I: steady state , 2005 .

[14]  Irene A. Stegun,et al.  Handbook of Mathematical Functions. , 1966 .

[15]  Philippe Pasquier,et al.  Fast fluid and ground temperature computation for geothermal ground-loop heat exchanger systems , 2008 .

[16]  Louis Lamarche,et al.  A fast algorithm for the simulation of GCHP systems , 2007 .

[17]  Z. Fang,et al.  Heat transfer analysis of boreholes in vertical ground heat exchangers , 2003 .

[18]  J. Beck,et al.  Determining effective soil formation thermal properties from field data using a parameter estimation technique , 1998 .

[19]  Jason Earl Gentry Simulation and validation of hybrid ground source and water-loop heat pump systems , 2007 .

[20]  J. Spitler,et al.  Modeling of Vertical Ground Loop Heat Exchangers with Variable Convective Resistance and Thermal Mass of the Fluid , 2006 .

[21]  Louis Lamarche,et al.  A new contribution to the finite line-source model for geothermal boreholes , 2007 .

[22]  Saqib Javed,et al.  Multi-injection rate thermal response test with forced convection in a groundwater-filled borehole in hard rock , 2012 .

[23]  John W. Lund,et al.  Direct utilization of geothermal energy. , 2010 .

[24]  Harald Stehfest,et al.  Remark on algorithm 368: Numerical inversion of Laplace transforms , 1970, CACM.

[25]  J. A. Shonder,et al.  A New Method to Determine the Thermal Properties of Soil Formations from In Situ Field Tests , 2000 .

[26]  Lu Xing,et al.  Residential Ground Source Heat Pump Systems Utilizing Foundation Heat Exchangers , 2010 .

[27]  D. O’Neal,et al.  An Analytical Solution to Transient Heat Conduction in a Composite Region With a Cylindrical Heat Source , 1995 .

[28]  P. Mogensen Fluid to duct wall heat transfer in duct system heat storages , 1983 .

[29]  Xiaobing Liu,et al.  Development and Experimental Validation of Simulation of Hydronic Snow Melting Systems for Bridges , 2005 .

[30]  Saqib Javed,et al.  Design of ground source heat pump systems. Thermal modelling and evaluation of boreholes. , 2010 .

[31]  Groenholland Bv GEOTHERMAL RESPONSE TESTS USING CONTROLLED MULTI-POWER LEVEL HEATING AND COOLING PULSES (MPL-HCP): QUANTIFYING GROUND WATER EFFECTS ON HEAT TRANSPORT AROUND A BOREHOLE HEAT EXCHANGER , 2006 .

[32]  Per Fahlén,et al.  Development and Planned Operation of a Ground Source Heat Pump Test Facility , 2010 .

[33]  Per Eskilson Thermal analysis of heat extraction boreholes , 1987 .

[34]  Anna-Maria Gustafsson,et al.  Multi-injection rate thermal response test in groundwater filled borehole heat exchanger , 2010 .

[35]  R. Al-Khoury,et al.  Efficient finite element formulation for geothermal heating systems. Part II: transient , 2006 .

[36]  S. Gehlin Thermal response test : method development and evaluation , 2002 .

[37]  Jeffrey D. Spitler,et al.  A short time step response factor model for vertical ground loop heat exchangers , 1999 .

[38]  Richard Labib,et al.  A Multiple Load Aggregation Algorithm for Annual Hourly Simulations of GCHP Systems , 2004 .

[39]  J. C. Jaeger,et al.  Conduction of Heat in Solids , 1952 .

[40]  L. Lamarche,et al.  New solutions for the short-time analysis of geothermal vertical boreholes , 2007 .

[41]  Norman K. Muraya,et al.  Numerical Modeling of the Transient Thermal Interference of Vertical U-Tube Haet Exchangers , 1994 .

[42]  John W. Lund,et al.  Direct utilization of geothermal energy 2010 worldwide review , 2011 .

[43]  José Acuña,et al.  Improvements of U-pipe Borehole Heat Exchangers , 2010 .