A Trainable Heuristic Procedure for the Assembly Line Balancing Problem
暂无分享,去创建一个
[1] D. R. Fulkerson,et al. Maximal Flow Through a Network , 1956 .
[2] F. R. Furth. A message from rear admiral , 1954 .
[3] Ralph E. Gomory,et al. An algorithm for integer solutions to linear programs , 1958 .
[4] George Braxton Bennett. An assembly line balancing system based on an experience-gathering heuristic procedure and a branch and bound algorithm , 1970 .
[5] E. Balas. An Additive Algorithm for Solving Linear Programs with Zero-One Variables , 1965 .
[6] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[7] R. Gomory. AN ALGORITHM FOR THE MIXED INTEGER PROBLEM , 1960 .
[8] F. Glover. AN ALL-INTEGER INTEGER PROGRAMMING ALGORITHM , 1963 .
[9] Fred McLanahan Tonge,et al. A heuristic program for assembly line balancing , 1961 .
[10] J. William Gavett,et al. Three Heuristic Rules for Sequencing Jobs to a Single Production Facility , 1965 .
[11] A. L. Arcus,et al. COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .