A mixed integer programming model to evaluate integrating strategies in the forest value chain — a case study in the Chilean forest industry

When a company is integrated vertically, it can manage and plan its overall value chain in one direct and integrated approach. However in many cases, companies follow a decoupled approach where forests and production plants optimize separately their processes in a supply-driven strategy. In Chile, the two largest forest companies are vertically integrated (i.e., they own forest and mills that produce logs, lumber, plywood, pulp, paper, and bioenergy, etc.). Historically, they have coordinated their value chains using a make-to-stock strategy, for which the forest is the main driver of the value chain activities. In this paper, we propose an integrated planning approach to show the impacts of a demand-driven integration of the value chain in the forest industry. To compare this strategy with the decoupled strategy, we propose a mixed integer programming (MIP) model for the integrated strategy. To illustrate our proposal, we use forest and production information from a Chilean forest company. The decoupled ...

[1]  Andres Weintraub,et al.  The Supply Chain in the Forest Industry: Models and Linkages , 2002 .

[2]  Philip M. Kaminsky,et al.  Designing and managing the supply chain : concepts, strategies, and case studies , 2007 .

[3]  D. Simchi-Levi,et al.  The Logic of Logistics: Theory, Algorithms, and Applications for Logistics and Supply Chain Management , 1999 .

[4]  Oscar García A Forestry-Oriented Linear Programming Interpreter , 1984 .

[5]  Mikael Rönnqvist,et al.  Using Operational Research for Supply Chain Planning in the Forest Products Industry , 2008, INFOR Inf. Syst. Oper. Res..

[6]  Mikael Rönnqvist,et al.  Optimization in forestry , 2003, Math. Program..

[7]  Joseph Geunes,et al.  Coordinating the Distribution Chain: New Models for New Challenges , 2002 .

[8]  E. Fridell,et al.  The mechanism for NOx storage , 2000 .

[9]  Philippe Chevalier,et al.  A system for the design of short term harvesting strategy , 1999, Eur. J. Oper. Res..

[10]  Mikael Rönnqvist,et al.  Integrated harvest and logistic planning including road upgrading , 2014 .

[11]  Andres Weintraub,et al.  New Issues in Forest Land Management from an Operations Research Perspective , 1996 .

[12]  J. Borges,et al.  Combining random and systematic search heuristic procedures for solving spatially constrained forest management scheduling models , 2002 .

[13]  Brian Kent,et al.  Natural resource and management planning using large-scale linear programs: the USDA forest service experience with FORPLAN , 1991 .

[14]  Kenneth P. Davis Forest management: regulation and valuation , 1966 .

[15]  Monique Guignard-Spielberg,et al.  A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation , 2003, Oper. Res..

[16]  Hamish Marshall,et al.  Log Merchandizing Model Used in Mechanical Harvesting , 2007 .

[17]  Tom E. Yoon,et al.  A DECADE OF SCM LITERATURE: PAST, PRESENT AND FUTURE IMPLICATIONS , 2008 .

[18]  Andrés Weintraub,et al.  Use of OR Systems in the Chilean Forest Industries , 1999, Interfaces.

[19]  E. Gunn Models for Strategic Forest Management , 2007 .

[20]  Richard L. Church,et al.  Forest management models and combinatorial algorithms: analysis of state of the art , 2000, Ann. Oper. Res..

[21]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[22]  Carlos Romero,et al.  Operations Research Models and the Management of Agricultural and Forestry Resources: A Review and Comparison , 2006, Interfaces.

[23]  Glen Murphy,et al.  The impact of environmental constraints on short term harvesting: Use of planning tools and mathematical models , 2000, Ann. Oper. Res..

[24]  M. Rönnqvist,et al.  RoadOpt: A decision support system for road upgrading in forestry , 2006 .