Defining Robust Recovery Solutions for Preserving Service Quality during Rail/Metro Systems Failure
暂无分享,去创建一个
[1] Andrea D'Ariano. Innovative Decision Support System for Railway Traffic Control , 2009, IEEE Intelligent Transportation Systems Magazine.
[2] Fulvio Simonelli,et al. Effectiveness of Origin-Destination Matrix Correction Procedure Using Traffic Counts , 2008 .
[3] A. Hegyi,et al. Model Predictive Control Approach for Recovery from Delays in Railway Systems , 2002 .
[4] Dennis Huisman,et al. Delay Management with Rerouting of Passengers , 2012, Transp. Sci..
[5] Luis Cadarso,et al. Improving robustness of rolling stock circulations in rapid transit networks , 2014, Comput. Oper. Res..
[6] Oded Cats,et al. Railway disruption timetable: Short-turnings in case of complete blockage , 2016, 2016 IEEE International Conference on Intelligent Rail Transportation (ICIRT).
[7] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[8] Antonio Placido,et al. A neighbourhood search algorithm for determining optimal intervention strategies in the case of metro system failures , 2017 .
[9] Rob M.P. Goverde,et al. Punctuality of railway operations and timetable stability analysis , 2005 .
[10] Yong Qin,et al. Train Timetable Optimizing and Rescheduling Based on Improved Particle Swarm Algorithm , 2010 .
[11] Ernesto Cipriani,et al. Two-Step Approach for Correction of Seed Matrix in Dynamic Demand Estimation , 2014 .
[12] Francesco Corman,et al. Disruption Handling in Large Railway Networks , 2010 .
[13] Mariano Gallo,et al. Application of Metaheuristics to Large-Scale Transportation Problems , 2013, LSSC.
[14] Mark Wardman,et al. Public transport values of time , 2004 .
[15] Francesco Corman,et al. Assessment of Advanced Dispatching Measures for Recovering Disrupted Railway Traffic Situations , 2012 .
[16] Dario Pacciarelli,et al. A tabu search algorithm for rerouting trains during rail operations , 2007 .
[17] Norio Tomii,et al. A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers , 2013, J. Rail Transp. Plan. Manag..
[18] Norio Tomii,et al. An optimal delay management algorithm from passengers' viewpoints considering the whole railway network , 2011, J. Rail Transp. Plan. Manag..
[19] Taketoshi Kunimatsu,et al. Train timetable evaluation from the viewpoint of passengers by microsimulation of train operation and passenger flow , 2012 .
[20] Nirajan Shiwakoti,et al. If you fail to plan you plan to fail: a survey of passenger rail disruption recovery practices , 2013 .
[21] Francesco Corman,et al. Impact of a stochastic and dynamic setting on the stability of railway dispatching solutions , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).
[22] Pasi Lautala,et al. Hybrid simulation approach for improving railway capacity and train schedules , 2015, J. Rail Transp. Plan. Manag..
[23] Gilbert Laporte,et al. Single-line rail rapid transit timetabling under dynamic passenger demand , 2014 .
[24] Francesco Corman,et al. Rescheduling models for railway traffic management in large-scale networks , 2013, Public Transport.
[25] Luis Cadarso,et al. Robust rolling stock in rapid transit networks , 2011, Comput. Oper. Res..
[26] Felix Schmid,et al. Delay management and energy consumption minimisation on a single-track railway , 2016 .
[27] Lucas P. Veelenturf,et al. A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions , 2014, Transp. Sci..
[28] Antonio Placido,et al. The definition of a model framework for managing rail systems in the case of breakdowns , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).
[29] Antonio Placido. The definition of a model framework for the planning and the management phases of the rail system in any kind of service condition. , 2015 .
[30] Marin Marinov,et al. A mesoscopic simulation modelling methodology for analyzing and evaluating freight train operations in a rail network , 2011, Simul. Model. Pract. Theory.
[31] Ulrich Weidmann,et al. Increasing Schedule Reliability on the S-Bahn in Zurich, Switzerland , 2006 .
[32] Matteo Fischetti,et al. Robustness in Train Timetabling. , 2009 .
[33] Antonio Placido,et al. Benefits of a Combined Micro-macro Approach for Managing Rail Systems in Case of Disruptions , 2014 .
[34] Raffaele Pesenti,et al. Automatic generation of railway timetables based on a mesoscopic infrastructure model , 2014, J. Rail Transp. Plan. Manag..
[35] Dario Pacciarelli,et al. Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..
[36] M Kettner,et al. A MODEL FOR TRANSPORTATION PLANNING AND RAILWAY NETWORK EVALUATION , 2002 .
[37] Andrew Nash,et al. Railroad simulation using OpenTrack , 2004 .
[38] Jan-Dirk Schmöcker,et al. Metro service delay recovery : Comparison of strategies and constraints across systems , 2005 .
[39] Dario Pacciarelli,et al. Bi-objective conflict detection and resolution in railway traffic management , 2012 .
[40] M Kettner,et al. Integrating microscopic and macroscopic models for railway network evaluation , 2003 .
[41] Karin Baier,et al. Transportation Systems Analysis Models And Applications , 2016 .
[42] Dario Pacciarelli,et al. Optimal multi-class rescheduling of railway traffic , 2011, J. Rail Transp. Plan. Manag..
[43] P. Deuflhard,et al. Large Scale Scientific Computing , 1987 .
[44] Anita Schöbel,et al. Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.