Defining Robust Recovery Solutions for Preserving Service Quality during Rail/Metro Systems Failure

This paper proposes a sensitivity analysis for evaluating the effectiveness of recovery solutions in the case of disturbed rail operations. Indeed, when failures or breakdowns occur during daily service, new strategies have to be implemented so as to react appropriately and re-establish ordinary conditions as rapidly as possible. In this context, the use of rail simulation is vital: for each intervention strategy, it provides the evaluation of interactions and performance analysis prior to actually implementing the corrective action. However, in most cases, simulation tasks are deterministic and fail to allow for the stochastic distribution of train performance and delays. Hence, the strategies adopted might not be robust enough to ensure effectiveness of the intervention. We therefore propose an off-line procedure for disruption management based on a microscopic and stochastic rail simulation which considers both service operation and travel demand. An application in the case of a real metro line in Naples (Italy) shows the benefits of the proposed approach in terms of service quality.

[1]  Andrea D'Ariano Innovative Decision Support System for Railway Traffic Control , 2009, IEEE Intelligent Transportation Systems Magazine.

[2]  Fulvio Simonelli,et al.  Effectiveness of Origin-Destination Matrix Correction Procedure Using Traffic Counts , 2008 .

[3]  A. Hegyi,et al.  Model Predictive Control Approach for Recovery from Delays in Railway Systems , 2002 .

[4]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[5]  Luis Cadarso,et al.  Improving robustness of rolling stock circulations in rapid transit networks , 2014, Comput. Oper. Res..

[6]  Oded Cats,et al.  Railway disruption timetable: Short-turnings in case of complete blockage , 2016, 2016 IEEE International Conference on Intelligent Rail Transportation (ICIRT).

[7]  Lucas P. Veelenturf,et al.  An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .

[8]  Antonio Placido,et al.  A neighbourhood search algorithm for determining optimal intervention strategies in the case of metro system failures , 2017 .

[9]  Rob M.P. Goverde,et al.  Punctuality of railway operations and timetable stability analysis , 2005 .

[10]  Yong Qin,et al.  Train Timetable Optimizing and Rescheduling Based on Improved Particle Swarm Algorithm , 2010 .

[11]  Ernesto Cipriani,et al.  Two-Step Approach for Correction of Seed Matrix in Dynamic Demand Estimation , 2014 .

[12]  Francesco Corman,et al.  Disruption Handling in Large Railway Networks , 2010 .

[13]  Mariano Gallo,et al.  Application of Metaheuristics to Large-Scale Transportation Problems , 2013, LSSC.

[14]  Mark Wardman,et al.  Public transport values of time , 2004 .

[15]  Francesco Corman,et al.  Assessment of Advanced Dispatching Measures for Recovering Disrupted Railway Traffic Situations , 2012 .

[16]  Dario Pacciarelli,et al.  A tabu search algorithm for rerouting trains during rail operations , 2007 .

[17]  Norio Tomii,et al.  A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers , 2013, J. Rail Transp. Plan. Manag..

[18]  Norio Tomii,et al.  An optimal delay management algorithm from passengers' viewpoints considering the whole railway network , 2011, J. Rail Transp. Plan. Manag..

[19]  Taketoshi Kunimatsu,et al.  Train timetable evaluation from the viewpoint of passengers by microsimulation of train operation and passenger flow , 2012 .

[20]  Nirajan Shiwakoti,et al.  If you fail to plan you plan to fail: a survey of passenger rail disruption recovery practices , 2013 .

[21]  Francesco Corman,et al.  Impact of a stochastic and dynamic setting on the stability of railway dispatching solutions , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).

[22]  Pasi Lautala,et al.  Hybrid simulation approach for improving railway capacity and train schedules , 2015, J. Rail Transp. Plan. Manag..

[23]  Gilbert Laporte,et al.  Single-line rail rapid transit timetabling under dynamic passenger demand , 2014 .

[24]  Francesco Corman,et al.  Rescheduling models for railway traffic management in large-scale networks , 2013, Public Transport.

[25]  Luis Cadarso,et al.  Robust rolling stock in rapid transit networks , 2011, Comput. Oper. Res..

[26]  Felix Schmid,et al.  Delay management and energy consumption minimisation on a single-track railway , 2016 .

[27]  Lucas P. Veelenturf,et al.  A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions , 2014, Transp. Sci..

[28]  Antonio Placido,et al.  The definition of a model framework for managing rail systems in the case of breakdowns , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).

[29]  Antonio Placido The definition of a model framework for the planning and the management phases of the rail system in any kind of service condition. , 2015 .

[30]  Marin Marinov,et al.  A mesoscopic simulation modelling methodology for analyzing and evaluating freight train operations in a rail network , 2011, Simul. Model. Pract. Theory.

[31]  Ulrich Weidmann,et al.  Increasing Schedule Reliability on the S-Bahn in Zurich, Switzerland , 2006 .

[32]  Matteo Fischetti,et al.  Robustness in Train Timetabling. , 2009 .

[33]  Antonio Placido,et al.  Benefits of a Combined Micro-macro Approach for Managing Rail Systems in Case of Disruptions , 2014 .

[34]  Raffaele Pesenti,et al.  Automatic generation of railway timetables based on a mesoscopic infrastructure model , 2014, J. Rail Transp. Plan. Manag..

[35]  Dario Pacciarelli,et al.  Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..

[36]  M Kettner,et al.  A MODEL FOR TRANSPORTATION PLANNING AND RAILWAY NETWORK EVALUATION , 2002 .

[37]  Andrew Nash,et al.  Railroad simulation using OpenTrack , 2004 .

[38]  Jan-Dirk Schmöcker,et al.  Metro service delay recovery : Comparison of strategies and constraints across systems , 2005 .

[39]  Dario Pacciarelli,et al.  Bi-objective conflict detection and resolution in railway traffic management , 2012 .

[40]  M Kettner,et al.  Integrating microscopic and macroscopic models for railway network evaluation , 2003 .

[41]  Karin Baier,et al.  Transportation Systems Analysis Models And Applications , 2016 .

[42]  Dario Pacciarelli,et al.  Optimal multi-class rescheduling of railway traffic , 2011, J. Rail Transp. Plan. Manag..

[43]  P. Deuflhard,et al.  Large Scale Scientific Computing , 1987 .

[44]  Anita Schöbel,et al.  Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.