Improving team integration in Malaysian IBS construction projects : a partnering approach

Due to the combination of problems and issues that arose using traditional construction methods, such as fragmentation, time delay, wastages, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called Industrialised Building System (IBS). Although IBS was introduced over 40 years ago, with well-documented benefits and strong support from the Government, the pace of implementation and usage of IBS is still slow and below Government targets. Investigation by some researchers identified that one of the main barriers of IBS implementation in the Malaysian construction industry is related to poor integration and communication among stakeholders involved during the design stage. A number of reports challenged the construction industry to create a fully integrated process capable of delivering predictable results to clients through processes and team integration. Responding to the challenge, this research hopes to answer this problem and help towards the betterment of the IBS Malaysian construction industry using a partnering approach. The partnering approach is being advocated by many literatures as the solution to the many problems in the construction industry. Therefore, this paper will review the need of integrated team practice, define the concepts of partnering within scope of construction project, is followed by a discussion of the application of partnering in Malaysian IBS projects. It based on the thorough review of the relevant literature within the scope of partnering and Industrialised Building System (IBS). In the end, this paper suggests for the enhancement is needed in term of the level of integration and communication within the construction team and processes for the future research.

[1]  E. Sundstrom,et al.  Work teams: Applications and effectiveness. , 1990 .

[2]  Sai On Cheung,et al.  Trust in construction partnering: views from parties of the partnering dance , 2004 .

[3]  Salihudin Hassim,et al.  The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia , 2009 .

[4]  Heiner Evanschitzky,et al.  The relative strength of affective commitment in securing loyalty in service relationships , 2006 .

[5]  Ekambaram Palaneeswaran,et al.  Curing congenital construction industry disorders through relationally integrated supply chains , 2003 .

[6]  Florence Crespin-Mazet,et al.  Co-development as a marketing strategy in the construction industry , 2007 .

[7]  Albert P.C. Chan,et al.  Partnering in Construction: Critical Study of Problems for Implementation , 2003 .

[8]  Andrew N. Baldwin,et al.  Improving building design through integrated planning and control , 2002 .

[9]  Sai On Cheung,et al.  Towards an organizational culture framework in construction , 2011 .

[10]  D. Proverbs,et al.  Factors influencing the culture of a construction project organisation: An empirical investigation , 2009 .

[11]  Bambang Trigunarsyah Case Studies on Implementation of Constructability Improvement by Construction Project Owners in Indonesia , 2006 .

[12]  Ad Straub,et al.  Performance‐based maintenance partnering: a promising concept , 2007 .

[13]  George Ofori,et al.  Chinese culture and successful implementation of partnering in Singapore's construction industry , 2001 .

[14]  Larry G. Crowley,et al.  Conceptual Model of Partnering , 1995 .

[15]  Lauri Koskela,et al.  Roles of supply chain management in construction , 1999 .

[16]  Peter E.D. Love,et al.  Concurrent engineering : a strategy for procuring construction projects , 1998 .

[17]  Nuzul Azam Haron,et al.  Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four-storey School Buildings in Malaysia , 2005 .

[18]  Peter E.D. Love,et al.  Concurrent Engineering in the Construction Industry , 1997 .

[19]  John Bowron Re-engineering the project procurement process through concurrent engineering , 2002 .

[20]  J. Bröchner Innovation in Construction , 2010 .

[21]  George Jergeas,et al.  Benefits of Constructability on Construction Projects , 2001 .

[22]  Mohamad I. Mohamad The application of concurrent engineering philosophy to the construction industry , 1999 .

[23]  Chimay J. Anumba,et al.  A Software Architecture for Concurrent Lifecycle Design and Construction , 1996 .

[24]  H. Bisschoff,et al.  Partnering on information management projects in South Africa , 2008, PICMET '08 - 2008 Portland International Conference on Management of Engineering & Technology.

[25]  M. Bresnen,et al.  Partnering in construction: a critical review of issues, problems and dilemmas , 2000 .

[26]  A. Sohal,et al.  International Journal of Quality and Reliability Management , 1999 .

[27]  Per Erik Eriksson,et al.  The influence of partnering and procurement on subcontractor involvement and innovation , 2007 .

[28]  R. Mcintyre,et al.  A Conceptual Framework for Teamwork Measurement , 1997 .

[29]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[30]  Roger Beach,et al.  An evaluation of partnership development in the construction industry , 2005 .

[31]  Richard Haigh,et al.  Achieving excellence in construction , 2005 .

[32]  Philip R. Harris,et al.  Managing effectively through teams , 1996 .

[33]  Daniel Forgues,et al.  The influence of a collaborative procurement approach using integrated design in construction on project team performance , 2009 .

[34]  Chimay J. Anumba,et al.  Organisational structures to support concurrent engineering in construction , 2002, Ind. Manag. Data Syst..

[35]  Stephen Fisher,et al.  Team or group? Managers’ perceptions of the differences , 1997 .

[36]  J. Katzenbach,et al.  The Wisdom of Teams , 2010 .

[37]  Peter E.D. Love,et al.  A seamless supply chain management model for construction , 2004 .

[38]  Glenn M. Parker,et al.  Team Players and Teamwork: The New Competitive Business Strategy , 1990 .

[39]  G. Ofori Greening the construction supply chain in Singapore , 2000 .

[40]  Pui Chung Lim Implementation strategy for industrialised building system , 2006 .

[41]  A. Dainty,et al.  New perspectives on construction supply chain integration , 2001 .

[42]  Jeffrey S. Russell,et al.  Comparative Analysis of Three Constructability Approaches , 1994 .

[43]  Peter E.D. Love,et al.  Influence of Organisational Learning Practices on Reducing Rework in Projects. , 2002 .

[44]  M. Swainston,et al.  Early contractor involvement , 2006 .

[45]  Sai On Cheung,et al.  A study of construction mediator tactics—Part II: The contingent use of tactics , 2007 .

[46]  G. Howell,et al.  Integrated Project Delivery An Example Of Relational Contracting , 2005 .

[47]  Angela Lee,et al.  A critical literature review on the concept of team integration in Industrialised Building System (IBS) project , 2011 .

[48]  Vian Ahmed,et al.  Effective partnering in construction: A critical literature review , 2010 .

[49]  Charles R. Glagola,et al.  Partnering on Defense Contracts , 2002 .

[50]  S. G. Cohen,et al.  What Makes Teams Work: Group Effectiveness Research from the Shop Floor to the Executive Suite , 1997 .

[51]  Wade Shaw,et al.  Project Partnering: A Medium for Private and Public Sector Collaboration , 2007, IEEE Engineering Management Review.

[52]  E. Schein Organizational Culture and Leadership , 1991 .

[53]  S. Rowlinson,et al.  Quality relationships: partnering in the construction supply chain , 2000 .

[54]  Chimay J. Anumba,et al.  Establishing and processing client requirements—a key aspect of concurrent engineering in construction , 2000 .

[55]  Angela Lee,et al.  Barriers to implementation of the Industrialised Building System (IBS) in Malaysia , 2011 .

[56]  Kitsana Manivong,et al.  The need for life-cycle integration of project processes , 1999 .

[57]  Finland,et al.  Fast or concurrent: The art of getting construction improved , 1997 .

[58]  Z. Irani,et al.  Strategic alliances: a model for establishing long-term commitment to inter-organizational relations in construction , 2004 .

[59]  Lee L. Anderson,et al.  Anatomy of a Successful Partnering Program on a Megaproject , 2006 .

[60]  Quentin W. Fleming,et al.  Integrated project development teams: another fad … or a permanent change , 1996 .

[61]  Shamil Naoum An overview into the concept of partnering , 2003 .

[62]  H. Rubin,et al.  Qualitative Interviewing: The Art of Hearing Data , 1995 .

[63]  A. Dainty,et al.  Integrated project teams’ performance in managing unexpected change events , 1999 .

[64]  Chimay J. Anumba,et al.  Construction in the UK Petrochemical Industry - Aspects of Concurrent Engineering Practice , 1997 .

[65]  A. B. Ngowi,et al.  Trust factor in construction alliances , 2005 .

[66]  Peter E.D. Love,et al.  Establishment of Critical Success Factors for Construction Partnering , 2000 .

[67]  J. Fairclough,et al.  RETHINKING CONSTRUCTION INNOVATION AND RESEARCH - A REVIEW OF THE GOVERNMENT'S R&D POLICIES AND PRACTICES , 2002 .

[68]  Bernard Kofi Baiden Framework for the integration of the project delivery team , 2006 .

[69]  Patrick T.I. Lam,et al.  Partnering for construction excellence—A reality or myth? , 2006 .

[70]  Albert P.C. Chan,et al.  Exploring Critical Success Factors for Partnering in Construction Projects , 2004 .

[71]  Guihe Wang,et al.  Web-based system for industry using information and communication technologies , 2009, Kybernetes.

[72]  Ulla Espling,et al.  Part I. A framework of partnering for infrastructure maintenance , 2004 .

[73]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[74]  Albert P.C. Chan,et al.  The definition of alliancing in construction as a Wittgenstein family-resemblance concept , 2007 .

[75]  Carolyn Prince,et al.  An Overview of Team Performance Measurement , 1997 .

[76]  A. Akintoye Design and build: a survey of construction contractors’ views , 1994 .

[77]  Johan Nyström A quasi‐experimental evaluation of partnering , 2008 .

[78]  Andrew R.J. Dainty,et al.  Looking beyond process: human factors in team integration , 2003 .

[79]  Keith R. Molenaar,et al.  Sensitivity of Construction Activities under Design Uncertainty , 2009 .

[80]  Jim Mason The views and experiences of specialist contractors on partnering in the UK , 2007 .

[81]  S. Sorrell,et al.  Making the link: climate policy and the reform of the UK construction industry , 2003 .

[82]  Sai On Cheung,et al.  Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong , 2004 .

[83]  Malik M.A. Khalfan,et al.  Innovating for supply chain integration within construction , 2006 .

[84]  Peter Fenn,et al.  Strategy: the motivation for innovation , 2006 .

[85]  Frederick D. Lazar,et al.  Project Partnering: Improving the Likelihood of Win/Win Outcomes , 2000 .

[86]  Ian Howell The Need for Interoperability in the Construction Industry , 1996 .

[87]  John A. Drexler,et al.  PARTNERING: WHY PROJECT OWNER-CONTRACTOR RELATIONSHIPS CHANGE , 2000 .

[88]  Mustafa Alshawi,et al.  BARRIERS TO INDUSTRIALIZED BUILDING SYSTEM ( IBS ) : THE CASE OF MALAYSIA , 2012 .

[89]  Vian Ahmed,et al.  The role of organizational culture in construction partnering to produce innovation , 2010 .

[90]  Ashok Jashapara,et al.  Towards positive partnering: Revealing the realities in the construction industry , 1997 .

[91]  Hong Yan,et al.  A model for evaluating the applicability of partnering in construction , 2007 .

[92]  Per Erik Eriksson,et al.  Client perceptions of barriers to partnering , 2008 .

[93]  Peter E.D. Love,et al.  Concurrent engineering: a multi‐disciplinary approach for construction , 1998 .

[94]  Keith A. Jones,et al.  Performance measurement and benchmarking of a major innovation programme , 2008 .