Managing data and information quality in construction engineering : a system design approach

ed to a general level, it is possible from the discussion to give an overall picture of how quality dimensions should be handled in construction engineering (Figure 10). Figure 10. Handling quality dimensions in construction engineering The left side of Figure 10 displays quality dimensions, and the right side displays how these dimensions were addressed. As shown, completeness, consistency and logical coherence were dimensions directly assessed by rules. This means that rules were defined to assess data values for divergences related to these three dimensions. These three dimensions also covered the dimensions of accessibility and accuracy as understood at EUMEC; hence they were indirectly assessed by rules addressing the first three dimensions. Further, two dimensions were ensured by the rules: relevance, because the rules reflected project requirements; and timeliness, because delivery dates were captured by the rules and could be used to prioritize errors. Finally, business policies ensured access to project data only by project participants. Hence, the security dimension was covered by these policies. I believe the above discussion illustrates that even if Neely and Cook (2008) concluded that quality dimensions were an over-researched area in DQ/IQ literature, it is still necessary to investigate dimensions, their meaning and their use when approaching a new

[1]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[2]  A. M. Harrell,et al.  THE EFFECT OF INFORMATION LOAD ON DECISION MAKERS' CUE UTILIZATION LEVELS AND DECISION QUALITY IN... , 1990 .

[3]  Florence Yean Yng Ling,et al.  Strengths, Weaknesses, Opportunities, and Threats for Architectural, Engineering, and Construction Firms: Case Study of Vietnam , 2009 .

[4]  Paul Mangiameli,et al.  The Effects and Interactions of Data Quality and Problem Complexity on Classification , 2011, JDIQ.

[5]  KA Thleen,et al.  Building Theories from Case Study , 2007 .

[6]  Jay Yang,et al.  Benchmarking framework to measure extent of ICT adoption for building project management , 2010 .

[7]  Uday Kumar,et al.  Implementation and execution of industrial service strategy: A case study from the oil and gas industry , 2006 .

[8]  X. Xue,et al.  Coordination mechanisms for construction supply chain management in the Internet environment , 2007 .

[9]  Diane M. Strong,et al.  AIMQ: a methodology for information quality assessment , 2002, Inf. Manag..

[10]  C. O'Reilly Individuals and Information Overload in Organizations: Is More Necessarily Better? , 1980 .

[11]  A. Agapiou,et al.  The changing role of builders merchants in the construction supply chain , 1998 .

[12]  Mouzhi Ge,et al.  Information quality assessment: validating measurement dimensions and processes , 2011, ECIS.

[13]  Paul M. Goodrum,et al.  Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .

[14]  Irtishad Ahmad,et al.  Information systems to support decision-making in construction owner organizations: a data warehousing approach , 2005 .

[15]  Diane M. Strong,et al.  Data quality in context , 1997, CACM.

[16]  A. Koronios,et al.  A data quality framework for engineering asset management , 2008 .

[17]  Roger Miller,et al.  Understanding and Managing Risks in Large Engineering Projects , 2001 .

[18]  Carlo Batini,et al.  Methodologies for data quality assessment and improvement , 2009, CSUR.

[19]  Chelley Vician A Resource Review for Health Care Quality Execution: Business Intelligence Strategy , 2011, AMCIS.

[20]  Barbara H Wixom,et al.  A Theoretical Integration of User Satisfaction and Technology Acceptance , 2005, Inf. Syst. Res..

[21]  Jennifer E. Rowley,et al.  The wisdom hierarchy: representations of the DIKW hierarchy , 2007, J. Inf. Sci..

[22]  Peter Gärdenfors,et al.  Conceptual spaces - the geometry of thought , 2000 .

[23]  Issaka Ndekugri,et al.  Consultants’ Perceptions on Construction Delay Analysis Methodologies , 2009 .

[24]  Andy Koronios,et al.  The Deficiencies of Current Data Quality Tools in the Realm of Engineering Asset Management , 2006, AMCIS.

[25]  Thomas H. Kolbe,et al.  Spatio-semantic coherence in the integration of 3D city models , 2007 .

[26]  Gordon Brackstone,et al.  Managing data quality in a statistical agency , 2003 .

[27]  Andy Koronios,et al.  Key Data Quality Issues for Enterprise Asset Management in Engineering Organisations , 2006, Int. J. Electron. Bus. Manag..

[28]  Markus Helfert,et al.  An Approach to Monitoring Data Qualtiy - Product Oriented Approach - , 2010, AMCIS.

[29]  Thompson S. H. Teo,et al.  An empirical study of the performance impact of computerization in the retail industry , 1998 .

[30]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[31]  Kalle Lyytinen,et al.  The dynamics of IT boundary objects, information infrastructures, and organisational identities: the introduction of 3D modelling technologies into the architecture, engineering, and construction industry , 2008, Eur. J. Inf. Syst..

[32]  Andy Koronios,et al.  Developing a data quality framework for asset management in engineering organisations , 2007, Int. J. Inf. Qual..

[33]  K. T. Yeo,et al.  Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects , 2002 .

[34]  Kathleen V. Diegert,et al.  A Hierarchical Approach to Improving Data Quality , 1998, Data Qual..

[35]  Min Chen,et al.  Data, Information, and Knowledge in Visualization , 2009, IEEE Computer Graphics and Applications.

[36]  Suzanne D. Pawlowski,et al.  The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..

[37]  Trevor Wood-Harper,et al.  A critical perspective on action research as a method for information systems research , 1996, J. Inf. Technol..

[38]  Morgan Ericsson,et al.  A Metrics-Based Approach to Technical Documentation Quality , 2010, 2010 Seventh International Conference on the Quality of Information and Communications Technology.

[39]  Richard Baskerville,et al.  Investigating Information Systems with Action Research , 1999, Commun. Assoc. Inf. Syst..

[40]  Mike Cushman Action research in the UK construction industry - the B-hive project , 2001 .

[41]  Irtishad Ahmad,et al.  Action Research as a Proactive Research Method for Construction Engineering and Management , 2010 .

[42]  Yang W. Lee,et al.  Crafting Rules: Context-Reflective Data Quality Problem Solving , 2003, J. Manag. Inf. Syst..

[43]  Mysore Ramaswamy,et al.  ON THE PHENOMENON OF INFORMATION DILUTION , 2006 .

[44]  Shirley Gregor,et al.  The Anatomy of a Design Theory , 2007, J. Assoc. Inf. Syst..

[45]  Richard T. Watson,et al.  Analyzing the Past to Prepare for the Future: Writing a Literature Review , 2002, MIS Q..

[46]  Anany Levitin,et al.  Quality dimensions of a conceptual view , 1995 .

[47]  Boris Otto,et al.  Identification of Business Oriented Data Quality Metrics , 2009, ICIQ.

[48]  Giri Kumar Tayi,et al.  Examining data quality , 1998, CACM.

[49]  Lars Mathiassen,et al.  How a professionally qualified doctoral student bridged the practice-research gap: a confessional account of Collaborative Practice Research , 2013, Eur. J. Inf. Syst..

[50]  Sandeep Purao,et al.  Action Design Research , 2011, MIS Q..

[51]  Mike Chiasson,et al.  Style Composition in Action Research Publication , 2012, MIS Q..

[52]  Stuart E. Madnick,et al.  Overview and Framework for Data and Information Quality Research , 2009, JDIQ.

[53]  Diane M. Strong,et al.  Beyond Accuracy: What Data Quality Means to Data Consumers , 1996, J. Manag. Inf. Syst..

[54]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[55]  Richard Y. Wang,et al.  Manage Your Information as a Product , 1998 .

[56]  Richard Y. Wang,et al.  Anchoring data quality dimensions in ontological foundations , 1996, CACM.

[57]  Irtishad Ahmad,et al.  Challenges of integration and ICT's potentials in the globalized construction industry , 2010, PICMET 2010 TECHNOLOGY MANAGEMENT FOR GLOBAL ECONOMIC GROWTH.

[58]  Jeffrey S. Russell,et al.  Information technology (IT) and integration in the construction industry , 1995 .

[59]  Soffi Westin Data and Information Quality Research in Engineering Construction Projects: A Review of Literature , 2012, ISD.

[60]  Larry P. English Improving Data Warehouse and Business Information Quality: Methods for Reducing Costs and Increasing Profits , 1999 .

[61]  Andy Koronios,et al.  A data quality framework for engineering asset management , 2008, WCE 2008.

[62]  Peralta Costabel,et al.  Data quality evaluation in data integration systems , 2006 .

[63]  Panos Vassiliadis,et al.  Towards Quality-oriented Data Warehouse Usage and Evolution , 2000, Inf. Syst..

[64]  Rafael Sacks,et al.  An Empirical Study of Information Flows in Multidisciplinary Civil Engineering Design Teams using Lean Measures , 2011 .

[65]  Kristin Braa,et al.  Interpretation, intervention, and reduction in the organizational laboratory: a framework for in-context information system research , 1999 .

[66]  Yacine Rezgui,et al.  Exploring virtual team-working effectiveness in the construction sector , 2007, Interact. Comput..

[67]  Keisuke Arai Design Team Revolution: How to Cut Lead Times in Half and Double Your Productivity , 1994 .

[68]  Richard Y. Wang,et al.  Information Products for Remanufacturing: Tracing the Repair of an Aircrfat Fuel-Pump , 2001, IQ.

[69]  Jonathan Rosenhead,et al.  Project review and learning in the construction industry: Embedding a problem structuring method within a partnership context , 2004, Eur. J. Oper. Res..

[70]  関根 憲一,et al.  Design team revolution : how to cut lead times in half and double your productivity , 1994 .

[71]  Jieh-Haur Chen,et al.  Contractor Costs of Factoring Account Receivables for a Construction Project , 2012 .

[72]  François de Corbière Data Quality and Interorganizational Information Systems: The Role of Electronic Catalogues , 2009, AMCIS.

[73]  Les Gasser,et al.  A Design Theory for Systems That Support Emergent Knowledge Processes , 2002, MIS Q..

[74]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[75]  Ismail Abdul Rahman,et al.  Preliminary Study on Causative Factors Leading to Construction Cost Overrun , 2011 .

[76]  Dorothy E. Leidner,et al.  Review: Knowledge Management and Knowledge Management Systems: Conceptual Foundations and Research Issues , 2001, MIS Q..

[77]  Richard Y. Wang,et al.  Data quality assessment , 2002, CACM.

[78]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[79]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[80]  M. Pollitt,et al.  The Welfare Implications of Oil Privatization: A Cost-Benefit Analysis of Norway's Statoil , 2009 .

[81]  Soffi Westin,et al.  Data and Information Quality Dimensions in Engineering Construction Projects , 2012, AMCIS.

[82]  Thomas Olofsson,et al.  An evaluation model for ICT investments in construction projects , 2008, J. Inf. Technol. Constr..

[83]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[84]  Min Liu,et al.  Causes of Variation in Construction Project Task Starting Times and Duration , 2011 .

[85]  Judy McKay,et al.  The dual imperatives of action research , 2001, Inf. Technol. People.

[86]  Richard Y. Wang,et al.  IP-MAP: Representing the Manufacture of an Information Product , 2000, IQ.

[87]  Izak Benbasat,et al.  The Case Research Strategy in Studies of Information Systems , 1987, MIS Q..

[88]  Insu Park,et al.  Information Sharing: A Study of Information Attributes and their Relative Significance During Catastrophic Events , 2009 .

[89]  Roy C. Schmidt,et al.  MANAGING DELPHI SURVEYS USING NONPARAMETRIC STATISTICAL TECHNIQUES , 1997 .

[90]  Qinli Dyrhaug,et al.  A generalized Critical Success Factor Process Model for Managing Offshore Development Projects in Norway , 2002 .

[91]  Ashraf Elazouni,et al.  Progress monitoring of construction projects using pattern recognition techniques , 2011 .

[92]  Christoph Merschbrock,et al.  A Research Review on Building Information Modeling in Construction - An Area Ripe for IS Research , 2012, Commun. Assoc. Inf. Syst..

[93]  Baba Piprani,et al.  A Model for Data Quality Assessment , 2008, OTM Workshops.

[94]  Glen D. Murphy,et al.  Improving the quality of manually acquired data: Applying the theory of planned behaviour to data quality , 2009, Reliab. Eng. Syst. Saf..

[95]  Richard Baskerville,et al.  Special issue on action research in information systems: making is research relevant to practice--foreword , 2004 .

[96]  Geoff Walsham,et al.  Doing interpretive research , 2006, Eur. J. Inf. Syst..

[97]  Albert B. Cherns,et al.  Studying the client's role in construction management , 1984 .

[98]  M. J. Mawdesley,et al.  Management errors in construction , 1999 .

[99]  C. S Lim,et al.  An exploratory study into recurring construction problems , 2000 .

[100]  Laure Berti-Équille,et al.  Data quality awareness: a case study for cost optimal association rule mining , 2007, Knowledge and Information Systems.

[101]  Chitu Okoli,et al.  A Guide to Conducting a Systematic Literature Review of Information Systems Research , 2010 .

[102]  Heikki Lempinen,et al.  Constructing a Design Framework for Performance Dashboards , 2012, SCIS.

[103]  Richard Y. Wang,et al.  Modeling Information Manufacturing Systems to Determine Information Product Quality Management Scien , 1998 .

[104]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[105]  Luis F. Alarcón,et al.  Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company , 2011 .

[106]  Soffi Westin,et al.  Information quality in large engineering and construction projects: a delphi case study , 2011, ECIS.

[107]  R. Ackoff From Data to Wisdom , 2014 .

[108]  Erik Duval,et al.  Automatic evaluation of metadata quality in digital repositories , 2009, International Journal on Digital Libraries.

[109]  Leo Pipino,et al.  Applying IT to Healthcare: Humans, Errors, and a Data Quality Perspective , 2007, AMCIS.

[110]  Frank Lauterwald,et al.  Supporting the Production of High-Quality Data in Concurrent Plant Engineering Using a MetaDataRepository , 2010, AMCIS.

[111]  M. Pamela Neely,et al.  Data Quality Tools for Data Warehousing: A Small Sample Survey , 1998, IQ.

[112]  Geoff Walsham,et al.  The Emergence of Interpretivism in IS Research , 1995, Inf. Syst. Res..

[113]  Martin Bichler,et al.  Design science in information systems research , 2006, Wirtschaftsinf..

[114]  Carlo Batini,et al.  Data Quality: Concepts, Methodologies and Techniques (Data-Centric Systems and Applications) , 2006 .

[115]  Lars Mathiassen,et al.  Collaborative Practice Research , 2000, Scand. J. Inf. Syst..

[116]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[117]  Stephen O. Ogunlana,et al.  Desman: A dynamic model for managing civil engineering design projects , 1998 .