Engineering Project Real-time Objective Monitor Based on Grid Management and Buffer Analysis

Engineering projects often face a great number of uncertainties which will lead projects to deviate from the anticipated objective. This paper carried out a detailed study on real-time monitoring of objective deviation in engineering projects, and it will help project managers monitor the state of engineering project better. A Grid Management (GM) method was used to set up a monitor structure, and the real-time monitor grid structure was constructed in level, milestone and objective dimensions. The buffer analysis method was designed to measure the level of objective deviation. The objective deviation level is based on the result of the grid cell buffer analysis. The principal part construction of Shenyang Olympic Tennis court was selected as the example to illustrate the real-time monitor process in detail. The results indicated that the proposed real-time objective monitor method makes it possible for project manager to real-time monitor all the main objectives in one model and carry out management, and decision-making in a more macro perspective.

[1]  Heimo Malinen Project management by results , 1984 .

[2]  John J. Marciniak Encyclopedia of software engineering (vol. 1 A-N) , 1994 .

[3]  T. Busch Attitudes towards management by objectives: An empirical investigation of self-efficacy and goal commitment , 1998 .

[4]  Ian T. Foster,et al.  The data grid: Towards an architecture for the distributed management and analysis of large scientific datasets , 2000, J. Netw. Comput. Appl..

[5]  Ami Marowka,et al.  The GRID: Blueprint for a New Computing Infrastructure , 2000, Parallel Distributed Comput. Pract..

[6]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[7]  Wang Huan-cheng A Survey of Grid and Grid Management , 2005 .

[8]  Amit Sharma,et al.  Scalable enterprise level workflow and infrastructure management in a grid computing environment , 2005, CCGrid 2005. IEEE International Symposium on Cluster Computing and the Grid, 2005..

[9]  Patricia D. Galloway,et al.  Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects , 2006 .

[10]  K. T. Yeo,et al.  Managing uncertainty in major equipment procurement in engineering projects , 2006, Eur. J. Oper. Res..

[11]  C. Ping An Analysis on Digital Urban Management Model , 2006 .

[12]  Neil Genzlinger A. and Q , 2006 .

[13]  Ario Ohsato,et al.  Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .

[14]  Gerhard Girmscheid Construction production theory - Planning and control of the construction production process , 2008 .

[15]  Siamak Noori,et al.  An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[16]  San Cristobal,et al.  Time, Cost, and Quality in a Road Building Project , 2009 .

[17]  Zakaria Harun,et al.  Literature mapping: A bird s eye view on classification of factors influencing project success , 2010 .

[18]  Klaus Bergner,et al.  Using Project Procedure Diagrams for Milestone Planning , 2010, ICSP.

[19]  Sou-Sen Leu,et al.  Metaheuristics for project and construction management – A state-of-the-art review , 2011 .

[20]  Nuno Gil,et al.  The Effects of Schedule-driven Project Management in Multi-project Environments. , 2012 .

[21]  Hirotaka Takahashi,et al.  Critical Chain Project Management Based on a Max-Plus Linear Representation for Determining Time Buffers in Multiple Projects , 2012 .

[22]  Bon-Gang Hwang,et al.  Critical Success Factors for Key Project Players and Objectives: Case Study of Singapore , 2013 .

[23]  Maurizio Bevilacqua,et al.  Critical chain and theory of constraints applied to yachting shipbuilding: a case study , 2014 .

[24]  Mohammad Reza Nikoo,et al.  A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects , 2015, Expert Syst. Appl..

[25]  Mario Vanhoucke,et al.  A comparison of the performance of various project control methods using earned value management systems , 2015, Expert Syst. Appl..

[26]  Chang Qing,et al.  Research on Optimization of Earned Value Management Method inEngineering Budget Management , 2015 .

[27]  Jie Zhao,et al.  Construction System Reliability Analysis Based on Improved Firefly Algorithm , 2016 .

[28]  Erik Demeulemeester,et al.  Incorporation of activity sensitivity measures into buffer management to manage project schedule risk , 2016, Eur. J. Oper. Res..

[29]  Mojtaba Parsaee,et al.  Interactive architectural approach (interactive architecture): An effective and adaptive process for architectural design , 2016 .