Time Overrun in Pre-Construction Planning Phase of Construction Projects

Abstract—Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in preconstruction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

[1]  Fetene Nega CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .

[2]  Hans Lind,et al.  Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden , 2014 .

[3]  Bon-Gang Hwang,et al.  Construction project change management in Singapore: Status, importance and impact , 2012 .

[4]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[5]  David R. Riley,et al.  Delivering Sustainable, High-Performance Buildings: Influence of Project Delivery Methods on Integration and Project Outcomes , 2013 .

[6]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[7]  Dean Kashiwagi,et al.  Owners’ Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi Arabia☆ , 2016 .

[8]  Muhammad Aslam,et al.  Effects of Delay in construction Projects of Punjab-Pakistan: An Empirical Study , 2013 .

[9]  Aftab Hameed Memon,et al.  Solid Waste Management Issues in Hyderabad City , 2018 .

[10]  Keith R. Molenaar,et al.  Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction , 2006 .

[11]  Guru Prakash Prabhakar,et al.  Projects and Their Management: A Literature Review , 2009 .

[12]  Iosr Journals,et al.  Causes of Delay in Construction of Bridge Girders , 2015 .

[13]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[14]  Ole Jonny Klakegg,et al.  Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects☆ , 2016 .

[15]  Muhammad Akram Akhund,et al.  Time Overrun in Construction Projects of Developing Countries , 2017 .

[16]  V. Vasugi,et al.  Critical causes of time overrun in Indian construction projects and mitigation measures , 2018, International Journal of Construction Education and Research.

[17]  Zia Ud Din,et al.  Achieving Greater Project Success & Profitability through Pre-construction Planning: A Case-based Study , 2016 .

[18]  Abd Halid Abdullah,et al.  Theoretical framework of the causes of construction time and cost overruns , 2017 .