Development of the electric 600 underbench cavity subassembly build at Electrolux Cooking Plant, Adelaide, Australia
暂无分享,去创建一个
[1] E. N. Corlett,et al. BooksFitting the task to the man — An ergonomic approach (3rd Ed): E. Grandjean Taylor & Francis Ltd, London, pp 375 & ix, £14.50 (£9.50 paper) , 1980 .
[2] Ahindra Ghosh. Appendix 5.1 , 2000 .
[3] Edward J. Hay. The just-in-time breakthrough : implementing the new manufacturing basics , 1988 .
[4] R. Barnes. Motion and time study , 1950 .
[5] David Taylor,et al. Manufacturing Operations and Supply Chain Management: The LEAN Approach , 2000 .
[6] B. Niebel. Motion and Time Study , 1976 .
[7] G. Fowler,et al. Appendix 3.1 , 1962 .
[8] Ahindra Ghosh,et al. APPENDIX 2.1 , 2020, Understanding Affordability.
[9] Ahindra Ghosh,et al. Appendix 2.3 , 2000 .