Potential of Poka-Yoke Devices to Reduce Variability in Construction
暂无分享,去创建一个
[1] Paul. Olomolaiye,et al. Problems influencing craftsmen's productivity in Nigeria , 1987 .
[2] Nikkan Kogyo Shimbun. Poka-Yoke : Improving Product Quality by Preventing Defects , 1989 .
[3] Michael Ball,et al. Rebuilding Construction (Routledge Revivals): Economic Change in the British Construction Industry , 1988 .
[4] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[5] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[6] Mark A Vonderembse,et al. Operations Management: Concepts, Methods, and Strategies , 1988 .
[7] 新郷 重夫,et al. Non-stock production : the Shingo system for continuous improvement , 1988 .
[8] Michael Ball,et al. Rebuilding Construction: Economic Change and the British Construction Industry , 1988 .
[9] P. L. Bakke,et al. A discussion on building technology in the 1980s - Productivity in the building industry , 1972, Philosophical Transactions of the Royal Society of London. Series A, Mathematical and Physical Sciences.
[10] Harrington Emerson,et al. Motion study : a method for increasing the efficiency of the workman; And, Efficiency as a basis for operation and wages , 1911 .
[11] E. R. Skoyles,et al. Waste prevention on site , 1987 .
[12] Aguinaldo dos Santos. Método de intervenção em obras de edificações enfocando o sistema de movimentação e armazenamento de materiais : um estudo de caso , 1995 .
[13] R. Yin. Case Study Research: Design and Methods , 1984 .
[14] Frederick Winslow Taylor,et al. 科学管理原理=The principles of scientific management , 2014 .
[15] Glenn Ballard,et al. What Kind of Production Is Construction , 1998 .