Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes

In companies, overlapping is commonly regarded as a promising strategy to accelerate project execution. Overlapping consists in executing in parallel two sequential activities by allowing a downstream activity to start before the end of an upstream activity based on preliminary information. However, overlapping can entail reworks in downstream activity, caused by information updates until finalised information is available, and additional coordination and communication, which both require additional time and costs. In this paper, we present a model for the resource-constrained project scheduling problem with feasible overlapping modes. The makespan minimisation and the gain maximisation problems are formulated as linear integer programmes. Time-cost tradeoffs between project duration and overlapping costs are also discussed. An example of a 30-activity project is provided to illustrate the utility and efficiency of the model. Our results highlight the closed interaction between resource constraints and overlapping modes and suggest the relevance of jointly considering them.

[1]  Erik Jan Hultink,et al.  4 Product development performance: strategy, organization and management in the world auto industry☆ , 1994 .

[2]  Yanjun Qian,et al.  Production , Manufacturing and Logistics Overlapping and communication policies in product development , 2009 .

[3]  Ren-Jye Dzeng Identifying a design management package to support concurrent design in building wafer fabrication facilities , 2006 .

[4]  Steven D. Eppinger,et al.  A simulation-based process model for managing complex design projects , 2005, IEEE Transactions on Engineering Management.

[5]  Huang Yi-lei Construction Engineering and Management Programs in USA , 2013 .

[6]  Yoke San Wong,et al.  Optimal overlapping and functional interaction in product development , 2009, Eur. J. Oper. Res..

[7]  Preston G. Smith,et al.  Developing products in half the time , 1995 .

[8]  Christoph H. Loch,et al.  Communication and Uncertainty in Concurrent Engineering , 1998 .

[9]  Sönke Hartmann,et al.  A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[10]  Raad Yahya Qassim,et al.  Project Acceleration via Activity Crashing, Overlapping, and Substitution , 2008, IEEE Transactions on Engineering Management.

[11]  Reza H. Ahmadi,et al.  Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..

[12]  Tyson R. Browning,et al.  Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.

[13]  Christoph H. Loch,et al.  Measuring the Effectiveness of Overlapping Development Activities , 1999 .

[14]  Juite Wang,et al.  An overlapping process model to assess schedule risk for new product development , 2009, Comput. Ind. Eng..

[15]  Rainer Kolisch,et al.  PSPLIB - a project scheduling problem library , 1996 .

[16]  Reza H. Ahmadi,et al.  Time-Cost Trade-Offs in Overlapped Product Development , 2000, Oper. Res..

[17]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[18]  Feniosky Peña-Mora,et al.  DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .

[19]  Sönke Hartmann,et al.  Project Scheduling under Limited Resources , 1999 .

[20]  Joseph D. Blackburn,et al.  Concurrent software engineering: prospects and pitfalls , 1996 .

[21]  Tyson R. Browning,et al.  Modeling impacts of process architecture on cost and schedule risk in product development , 2002, IEEE Trans. Engineering Management.