An optimization methodology for multi model walking-worker assembly systems: an application from busbar energy distribution systems
暂无分享,去创建一个
[1] F. Bause,et al. Truncation point estimation using multiple replications in parallel , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[2] Karthik S. Gurumoorthy,et al. Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back , 2009, Oper. Res. Lett..
[3] Jinlin Li,et al. Balancing manual mixed-model assembly lines using overtime work in a demand variation environment , 2014 .
[4] Syed H. Masood. Line balancing and simulation of an automated production transfer line , 2006 .
[5] Stefan Ernst,et al. Tool for Improving Operating Points in Multi Model Assembly Lines , 2015 .
[6] Qian Wang,et al. Analysis of Production Loss on a Linear Walking Worker Line , 2010 .
[7] Armin Scholl,et al. Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing , 2013, Eur. J. Oper. Res..
[8] G M Buxey,et al. Production Flow Line System Design–A Review , 1973 .
[9] Qian Wang,et al. Determining numbers of workstations and operators for a linear walking-worker assembly line , 2007, Int. J. Comput. Integr. Manuf..
[10] Antony R Mileham,et al. Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches , 2009 .
[11] Armin Scholl,et al. Simple assembly line balancing—Heuristic approaches , 1997, J. Heuristics.
[12] Ye Li,et al. From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study , 2010 .
[13] Armin Scholl,et al. SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing , 1997, INFORMS J. Comput..
[14] Ihsan Sabuncuoglu,et al. Analysis of the behavior of the transient period in non-terminating simulations , 2006, Eur. J. Oper. Res..
[15] Carlos Andrés,et al. Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion , 2002, J. Oper. Res. Soc..
[16] Antony R Mileham,et al. A study of in-process waiting time on a linear walking worker assembly line , 2007 .
[17] Donald D. Eisenstein,et al. Using Bucket Brigades to Migrate from Craft Manufacturing to Assembly Lines , 2005, Manuf. Serv. Oper. Manag..
[18] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[19] Emre Cevikcan,et al. A team-oriented design methodology for mixed model assembly systems , 2009, Comput. Ind. Eng..
[20] Subhash C. Sarin,et al. Allocation of work to the stations of an assembly line with buffers between stations and three general learning patterns , 2008, Int. J. Intell. Syst. Technol. Appl..
[21] Kürşad Ağpak,et al. An approach to find task sequence for re‐balancing of assembly lines , 2010 .
[22] Afshin Amini Malaki. A Study of the Effects of Operational Time Variability in Assembly Lines with Linear Walking Workers , 2012 .
[23] Ton G. de Kok,et al. The mixed and multi model line balancing problem: a comparison , 1997, Eur. J. Oper. Res..
[24] Ke Xing,et al. An Integrated Design Support Methodology for Walking Worker Assembly Lines , 2010 .
[25] Leonid A. Bunimovich,et al. Dynamics of Two- and Three-Worker "Bucket Brigade" Production Lines , 1999, Oper. Res..
[26] Michael E. Kuhl,et al. A novel work-sharing protocol for U-shaped assembly lines , 2014, Proceedings of the Winter Simulation Conference 2014.
[27] Ke Xing,et al. Mathematical modelling for process design of walking worker assembly line in productivity and ergonomics perspectives , 2013 .
[28] Alexandre Dolgui,et al. A survey of the self-balancing production lines (“bucket brigades”) , 2005, J. Intell. Manuf..
[29] Fatma Kalaoglu,et al. Assembly Line Balancing in a Clothing Company , 2008 .
[30] Ke Xing,et al. Prediction and analysis impact of operational design of a manual assembly system with walking workers on performance , 2013, Int. J. Comput. Integr. Manuf..
[31] Qian Wang,et al. Integration of Lean Approaches to Manage a Manual Assembly System , 2014 .
[32] Emre Cevikcan,et al. A mathematical programming approach for walking-worker assembly systems , 2014 .
[33] Li-Man Liao. Construction and comparison of multi-model and mixed-model assembly lines balancing problems with bi-objective , 2014 .
[34] Pingyu Jiang,et al. RFID-based wireless manufacturing for walking-worker assembly islands with fixed-position layouts , 2007 .
[35] Ali Emrouznejad,et al. A mathematical model for assembly line balancing model to consider disordering sequence of workstations , 2009 .
[36] Zuhua Jiang,et al. A memetic algorithm approach for batch-model assembly line balancing problem of sub-block in shipbuilding , 2014 .
[37] Yuval Cohen,et al. Optimizing the number of stations in assembly lines under learning for limited production , 1998 .
[38] Ke Xing,et al. The Role of Randomness of a Manual Assembly Line with Walking Workers on Model Validation , 2012 .
[39] Mustafa Yilmaz,et al. Multi-manned assembly line balancing problem with balanced load density , 2015 .
[40] Nils Boysen,et al. Assembly line balancing: Which model to use when? , 2006 .
[41] Alexandre Dolgui,et al. Some new results on the analysis and simulation of bucket brigades (self-balancing production lines) , 2009 .
[42] Naveen Kumar,et al. Assembly Line Balancing: A Review of Developments and Trends in Approach to Industrial Application , 2013 .
[43] Ezey M. Dar-El,et al. Optimal planning and scheduling of assembly lines , 1988 .
[44] Mario T. Tabucanon,et al. Batch-model assembly line balancing: A multiattribute decision making approach , 1995 .
[45] P. Sivasankaran,et al. Literature review of assembly line balancing problems , 2014 .
[46] Sawsan S. Al-zubaidy,et al. Multi-model Production and Assembly Line Balancing (Caravans Production Workshop) , 2013 .
[47] John B. Kidd,et al. Toyota Production System , 1993 .
[48] Alf Kimms,et al. Minimal investment budgets for flow line configuration , 1998 .
[49] Mohammad Kamal Uddin,et al. An integrated approach to mixed‐model assembly line balancing and sequencing , 2010 .
[50] A. Chakravarty,et al. Balancing Mixed Model Lines with In-Process Inventories , 1985 .
[51] Wei Shi,et al. A genetic algorithm for Multi-Model Assembly Line Balancing Problem , 2013, 2013 IEEE International Symposium on Assembly and Manufacturing (ISAM).
[52] Atiya Al-Zuheri,et al. Developing a multi-objective genetic optimisation approach for an operational design of a manual mixed-model assembly line with walking workers , 2016, J. Intell. Manuf..