Shear behavior and analytical model of perfobond connectors

In steel and concrete composite girders, the load transfer between the steel beam and the concrete slab is commonly ensured by installing shear connectors. In this paper, to investigate the nonlinear behavior of perfobond connectors, a total of 60 push-out specimens were fabricated and tested with the variables for the hole diameter, the concrete strength, the thickness of concrete slab, the diameter, strength and existence of perforating rebar, the thickness, height and distance of perfobond ribs. The failure mode and the load-slip behavior of perfobond connectors were obtained. A theoretical model was put forward to express the load-slip relationship. Analytical formulas of shear capacity and peak slip were also proposed considering the interaction between the concrete dowel and the perforating rebar. The calculation results of the proposals agreed well with the experimental values.

[1]  D. Oehlers,et al.  The shear stiffness of stud shear connections in composite beams , 1986 .

[2]  R. P. Johnson,et al.  Resistance of stud shear connectors to fatigue , 2000 .

[3]  Meldi Suhatril,et al.  Experimental assessment of angle shear connectors under monotonic and fully reversed cyclic loading in high strength concrete , 2014 .

[4]  E. Oguejiofor,et al.  A parametric study of perfobond rib shear connectors , 1994 .

[5]  Jun He,et al.  Experimental and analytical study on fatigue behavior of composite truss joints , 2013 .

[6]  Aida Mazoz,et al.  Push-out tests on a new shear connector of I-shape , 2013 .

[7]  Ai Rong Chen,et al.  Finite Element Simulation and Parametric Studies of Perfobond Rib Connector , 2007 .

[8]  H.-P. Andrä,et al.  Neues, vorteilhaftes Verbundmittel für Stahlverbund‐Tragwerke mit hoher Dauerfestigkeit. , 1987 .

[9]  Tetsuya Hosaka,et al.  New technologies of steel/concrete composite bridges , 2002 .

[10]  L. F. Costa-Neves,et al.  Experimental evaluation of the structural response of Perfobond shear connectors , 2010 .

[11]  Jin Hee Ahn,et al.  Experimental study on joint of spliced steel-PSC hybrid girder, Part I: Proposed parallel-perfobond-rib-type joint , 2011 .

[12]  Jun He,et al.  Behavior of stud connectors under combined shear and tension loads , 2014 .

[13]  Sunghoon Kim,et al.  Experimental study on shear connection in unfilled composite steel grid bridge deck , 2010 .

[14]  Sung-Pil Chang,et al.  Static and fatigue behavior of large stud shear connectors for steel–concrete composite bridges , 2005 .

[15]  Jin Hee Ahn,et al.  Shear resistance of the perfobond-rib shear connector depending on concrete strength and rib arrangement , 2010 .