Improved Critical Chain Project Management Framework for Scheduling Construction Projects
暂无分享,去创建一个
Nan Li | Lingyun Gu | Aimin Wang | Qi Ai | Guofeng Ma | Qing Ai | Nan Li | Aimin Wang | Guofeng Ma | Lingyun Gu
[1] Khaled A El-Rayes,et al. Multiobjective optimization of resource leveling and allocation during construction scheduling , 2011 .
[2] Yongyi Shou,et al. Estimation of project buffers in critical chain project management , 2000, Proceedings of the 2000 IEEE International Conference on Management of Innovation and Technology. ICMIT 2000. 'Management in the 21st Century' (Cat. No.00EX457).
[3] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[4] RAINER KOLISCH,et al. Local search for nonpreemptive multi-mode resource-constrained project scheduling , 1997 .
[5] Chu Chun-chao. Buffer sizing and critical chain project management , 2008 .
[6] M. Usábel,et al. Applications to risk theory of a Montecarlo multiple integration method , 1998 .
[7] Jian Zuo,et al. Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty , 2010 .
[8] Ario Ohsato,et al. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .
[9] Jaeho Son,et al. Binary Resource Leveling Model: Activity Splitting Allowed , 2004 .
[10] Tarek Y. ElMekkawy,et al. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm , 2011 .
[11] Robert C. Newbold,et al. Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .
[12] Po-Han Chen,et al. Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints , 2009 .
[13] Kleanthis Sirakoulis,et al. The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem , 2009 .
[14] C. William Ibbs,et al. Network Resource Allocation with Support of a Fuzzy Expert System , 1990 .
[15] Vinod Kumar,et al. Entropic measures of manufacturing flexibility , 1987 .
[16] Walter O. Rom,et al. An investigation of buffer sizing techniques in critical chain scheduling , 2006, Eur. J. Oper. Res..
[17] Avraham Shtub,et al. Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives , 2004 .
[18] Kenneth R. Baker,et al. PERT 21: Fitting PERT/CPM for use in the 21st century , 2012 .
[19] Frederik Ahlemann,et al. A process framework for theoretically grounded prescriptive research in the project management field , 2013 .
[20] L. Pozzi,et al. The coefficient of relative risk aversion: a Monte Carlo study investigating small sample estimator problems , 2003 .
[21] Nicholas G. Hall. Project management: Recent developments and research opportunities , 2012 .
[22] W. L. Peng,et al. The Scheduling Problem of Active Critical Chain Method , 2012 .
[23] Keith C. Crandall. Resource Allocation with Project Manager Control , 1985 .
[24] Ahmed Senouci,et al. Use of Genetic Algorithms in Resource Scheduling of Construction Projects , 2004 .
[25] Willy Herroelen,et al. On the merits and pitfalls of critical chain scheduling , 2000 .
[26] Herbert Süße,et al. The Method of Normalization to Determine Invariants , 1996, IEEE Trans. Pattern Anal. Mach. Intell..
[27] Maurizio Bevilacqua,et al. Critical chain and risk analysis applied to high-risk industry maintenance: A case study , 2009 .
[28] Yin Hong,et al. The Risk Study of E-Governance Based on PEST Analysis Model , 2010, 2010 International Conference on E-Business and E-Government.
[29] Xiaoming Zhang,et al. Buffer sizing approach with dependence assumption between activities in critical chain scheduling , 2012 .
[30] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[31] Mohamed Haouari,et al. Robust scheduling and robustness measures for the discrete time/cost trade-off problem , 2010, Eur. J. Oper. Res..
[32] Graham K. Rand. Critical chain: the theory of constraints applied to project management , 2000 .
[33] David Arditi,et al. Multiresource Leveling in Line-of-Balance Scheduling , 2013 .
[34] M Schuhmacher,et al. The use of Monte-Carlo simulation techniques for risk assessment: study of a municipal waste incinerator. , 2001, Chemosphere.
[35] Sou-Sen Leu,et al. A fuzzy optimal model for construction resource leveling scheduling , 1999 .