Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: Case study on the diversion tunnel groups of the Jinping II Hydropower Station
暂无分享,去创建一个
Xueping Li | Yunan Li | Yunan Li | Xueping Li
[1] Ravendra Singh,et al. Study of Mine Water Inrush from Floor Strata through Faults , 2001 .
[2] Shi Shaoshuai,et al. CONSTRUCTION LICENSE MECHANISM AND ITS APPLICATION BASED ON KARST WATER INRUSH RISK EVALUATION , 2011 .
[3] Cnpc Key,et al. Distribution and Controlling Factors of Ordovician Karst Reservoirs in Dagang Region , 2001 .
[4] Michael H. de Freitas,et al. Geospatial analysis in identifying karst cavity distribution: The SMART Tunnel, Malaysia , 2013, Carbonates and Evaporites.
[5] Chen Lu. Water/Rock Interaction Mechanism in Deep-buried Tunnels in Karst Area , 2004 .
[6] Liu Bin. Comprehensive geological prediction based on risk evaluation during tunneling in karst area , 2010 .
[7] T. L. Saaty. A Scaling Method for Priorities in Hierarchical Structures , 1977 .
[8] Jiang Liang-wen,et al. Preliminary study on risk assessment of water and mud inrush in karst tunnel , 2010 .
[9] Wang Ji-feng,et al. Evaluation of Water-inrush Risks of Karst Tunnel with Analytic Hierarchy Process , 2010 .
[10] Wang Ge,et al. UNDERGROUND WATER AND ITS TREATMENT STRATEGY IN AUXILIARY TUNNELS OF JINPING HYDROPOWER PROJECT , 2007 .
[11] Qiang Wu,et al. GIS and ANN coupling model: an innovative approach to evaluate vulnerability of karst water inrush in coalmines of north China , 2008 .