On the cooperation of recycling operations

This paper addresses two important issues that may affect the operations efficiency in the recycling industry. First, the industry contains many small-scale and inefficient recycling firms, especially in developing countries. Second, the output from recycling a waste product often yields multiple recycled products that cannot all be sold efficiently by a single firm. To address these two issues, this paper examines how different firms can cooperate in their recycling and pricing decisions using cooperative game theory. Recycling operations under both joint and individual productions with different cost structures are considered. Decisions include the quantity of waste product to recycle and the price at which to sell each recycled product on each firm’s market. These decisions can be made jointly by multiple cooperating firms to maximize total profit. We design allocation schemes for maximized total profit to encourage cooperation among all firms. Managerial insights are provided from both environmental and economic perspectives.

[1]  Jiawei Zhang,et al.  Cost Allocation for Joint Replenishment Models , 2007, Oper. Res..

[2]  L. V. Wassenhove,et al.  Matching supply and demand to maximize profits from remanufacturing , 2003 .

[3]  Anna Nagurney,et al.  Reverse supply chain management and electronic waste recycling: a multitiered network equilibrium framework for e-cycling , 2005 .

[4]  Mahesh Nagarajan,et al.  Stable Farsighted Coalitions in Competitive Markets , 2007, Manag. Sci..

[5]  Xin Chen,et al.  A Stochastic Programming Duality Approach to Inventory Centralization Games , 2007, Oper. Res..

[6]  Anshuman Khare,et al.  European response to issues in recycling car plastics , 1999 .

[7]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[8]  Charles R. McLean,et al.  Disassembly of products , 1996 .

[9]  Moshe Haviv,et al.  Cooperation in Service Systems , 2010, Oper. Res..

[10]  Xin Chen,et al.  Inventory Centralization Games with Price-Dependent Demand and Quantity Discount , 2009, Oper. Res..

[11]  Rajesh Srivastava,et al.  Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .

[12]  Justo Puerto,et al.  Production-inventory games: A new class of totally balanced combinatorial optimization games , 2024, Games Econ. Behav..

[13]  Alain Delchambre,et al.  Disassembly for recycling of office electronic equipment , 1997 .

[14]  Dong-Ho Lee,et al.  A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..

[15]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[16]  Ruud H. Teunter,et al.  Matching Demand and Supply to Maximize Profits from Remanufacturing , 2003, Manuf. Serv. Oper. Manag..

[17]  Ndue Kanari,et al.  End-of-life vehicle recycling in the european union , 2003 .

[18]  George L. Vairaktarakis,et al.  Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs , 2009, Manuf. Serv. Oper. Manag..

[19]  Evangelos Markakis,et al.  On the core of the multicommodity flow game , 2003, EC '03.

[20]  Donald Goldfarb,et al.  An O(n3L) primal—dual potential reduction algorithm for solving convex quadratic programs , 1993, Math. Program..

[21]  Guillermo Owen,et al.  On the core of linear production games , 1975, Math. Program..

[22]  Hayriye Ayhan,et al.  Relationships Among Three Assumptions in Revenue Management , 2004, Oper. Res..

[23]  Louis Anthony Cox,et al.  Wiley encyclopedia of operations research and management science , 2011 .

[24]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[25]  Gérard P. Cachon,et al.  Game Theory in Supply Chain Analysis , 2004 .

[26]  Nicholas G. Hall,et al.  Capacity Allocation and Scheduling in Supply Chains , 2010, Oper. Res..

[27]  Aart van Harten,et al.  Business case Roteb: recovery strategies for monitors , 1999 .

[28]  Ab Stevels,et al.  Take-back of discarded consumer electronic products from the perspective of the producer , 1999 .

[29]  Xiuli Qu,et al.  An analytical model for reverse automotive production planning and pricing , 2008, Eur. J. Oper. Res..

[30]  Dong-Ho Lee,et al.  A branch and bound algorithm for disassembly scheduling with assembly product structure , 2009, J. Oper. Res. Soc..

[31]  Liang Lu,et al.  Dynamic lot sizing for multiple products with a new joint replenishment model , 2011, Eur. J. Oper. Res..

[32]  Justo Puerto,et al.  Cooperation in Markovian queueing models , 2008, Eur. J. Oper. Res..

[33]  Bert Bras,et al.  Product, process, and organizational design for remanufacture – an overview of research , 1999 .

[34]  Samir K. Srivastava,et al.  Green Supply-Chain Management: A State-of-the-Art Literature Review , 2007 .

[35]  Dong-Ho Lee,et al.  Disassembly scheduling: literature review and future research directions , 2007 .

[36]  M. Eugster,et al.  The recycling and disposal of electrical and electronic waste in China—legislative and market responses , 2005 .

[37]  R. Roy,et al.  Successful recycling through value-chain collaboration , 1992 .

[38]  Eric Forssberg,et al.  Mechanical recycling of waste electric and electronic equipment: a review. , 2003, Journal of hazardous materials.

[39]  K. Richter,et al.  An extended production/recycling model with stationary demand and return rates , 2004 .

[40]  L. V. Wassenhove,et al.  MANAGING PRODUCT RETURNS FOR REMANUFACTURING , 2001 .