Development of the cable control system for industrial robots

In this study developed in this study occurred when the industrial robot spot welding spatter was produced by a structure capable of withstanding. In addition, the industrial robot 24 hours repeating the axis of rotation, if any power lines or hoses are not cutting structure was constructed. Decided to replace the existing three months to solve the problem was to develop a product.