Robustness of single machine scheduling problems to earliness and tardiness penalty errors

The Early/Tardy Machine Scheduling Problem is often proposed as a model of the situation faced by just-in-time manufacturers, whereby the objective is to minimize the weighted sum of early and tardy penalties for each job, and each penalty is proportional to the amount of time the job is early or tardy. Relatively little attention has been given in the literature to either the determination of these penalties or the effect that errors in estimating these penalties have on the final schedule. In this paper, we examine the sensitivity of the final schedule to errors in estimating these penalties. Results indicate that for some classes of problems, very large estimation errors can be sustained without compromising solution quality, whereas other problem classes require more careful evaluation of these penalties. Fortunately, the different classes of problem situations are relatively easy to identify.

[1]  Thomas K. Keyser,et al.  A heuristic solution of the E/T problem with waiting costs and non-zero release times , 1991 .

[2]  T. S. Abdul-Razaq,et al.  Dynamic Programming State-Space Relaxation for Single-Machine Scheduling , 1988 .

[3]  Srimathy Gopalakrishnan,et al.  A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment , 1993 .

[4]  Marc E. Posner,et al.  Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date , 1991, Oper. Res..

[5]  M. A. Carravilla,et al.  Hierarchical production planning in a make-to-order company: A case study , 1995 .

[6]  Kenneth N. McKay,et al.  Job-Shop Scheduling Theory: What Is Relevant? , 1988 .

[7]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[8]  Robert E. Tarjan,et al.  One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties , 1988, Math. Oper. Res..

[9]  L. Krajewski,et al.  Operations Management , 1994 .

[10]  Kenneth R. Baker,et al.  An experimental comparison of solution algorithms for the single‐machine tardiness problem , 1974 .

[11]  Yih-Long Chang,et al.  MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE. , 1986 .

[12]  J. Blackstone,et al.  Minimizing Weighted Absolute Deviation in Single Machine Scheduling , 1987 .

[13]  Jonathan F. Bard,et al.  Facility-Wide Planning and Scheduling of Printed Wiring Board Assembly , 1995, Oper. Res..

[14]  James B. Dilworth,et al.  Operations Management : Design, Planning, and Control for Manufacturing and Services , 1992 .

[15]  H Tsubone,et al.  A production scheduling system for a hybrid flow shop--a case study , 1993 .

[16]  Candace Arai Yano,et al.  Algorithms for a class of single-machine weighted tardiness and earliness problems , 1991 .

[17]  Thomas E. Morton,et al.  The single machine early/tardy problem , 1989 .

[18]  G. Leong,et al.  Single machine scheduling: A comparison of two solution procedures , 1987 .

[19]  Jae Young Choi,et al.  A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights , 1995, Comput. Oper. Res..

[20]  J. J. Kanet Minimizing the average deviation of job completion times about a common due date , 1981 .

[21]  Eric R. Zieyel Operations research : applications and algorithms , 1988 .

[22]  W. Szwarc Single-machine scheduling to minimize absolute deviation of completion times from a common due date , 1989 .