Robustness of single machine scheduling problems to earliness and tardiness penalty errors
暂无分享,去创建一个
[1] Thomas K. Keyser,et al. A heuristic solution of the E/T problem with waiting costs and non-zero release times , 1991 .
[2] T. S. Abdul-Razaq,et al. Dynamic Programming State-Space Relaxation for Single-Machine Scheduling , 1988 .
[3] Srimathy Gopalakrishnan,et al. A Decision Support System for Scheduling Personnel in a Newspaper Publishing Environment , 1993 .
[4] Marc E. Posner,et al. Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date , 1991, Oper. Res..
[5] M. A. Carravilla,et al. Hierarchical production planning in a make-to-order company: A case study , 1995 .
[6] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .
[7] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[8] Robert E. Tarjan,et al. One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties , 1988, Math. Oper. Res..
[9] L. Krajewski,et al. Operations Management , 1994 .
[10] Kenneth R. Baker,et al. An experimental comparison of solution algorithms for the single‐machine tardiness problem , 1974 .
[11] Yih-Long Chang,et al. MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE. , 1986 .
[12] J. Blackstone,et al. Minimizing Weighted Absolute Deviation in Single Machine Scheduling , 1987 .
[13] Jonathan F. Bard,et al. Facility-Wide Planning and Scheduling of Printed Wiring Board Assembly , 1995, Oper. Res..
[14] James B. Dilworth,et al. Operations Management : Design, Planning, and Control for Manufacturing and Services , 1992 .
[15] H Tsubone,et al. A production scheduling system for a hybrid flow shop--a case study , 1993 .
[16] Candace Arai Yano,et al. Algorithms for a class of single-machine weighted tardiness and earliness problems , 1991 .
[17] Thomas E. Morton,et al. The single machine early/tardy problem , 1989 .
[18] G. Leong,et al. Single machine scheduling: A comparison of two solution procedures , 1987 .
[19] Jae Young Choi,et al. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights , 1995, Comput. Oper. Res..
[20] J. J. Kanet. Minimizing the average deviation of job completion times about a common due date , 1981 .
[21] Eric R. Zieyel. Operations research : applications and algorithms , 1988 .
[22] W. Szwarc. Single-machine scheduling to minimize absolute deviation of completion times from a common due date , 1989 .