The Accuracy Enhancement of Architectural Walls Quantity Takeoff for Schematic BIM Models
暂无分享,去创建一个
[1] Brad Hardin,et al. BIM and Construction Management: Proven Tools, Methods, and Workflows , 2009 .
[2] Milad Rajabi,et al. Optimization of the Quantity Take-off (QTO) Process for Mechanical, Electrical and Plumbing (MEP) Trades in Tender Estimation Phase of the Construction Projects , 2015 .
[3] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[4] Sangyoon Chin,et al. Automated Building Information Modeling System for Building Interior to Improve Productivity of BIM-based Quantity Take-Off , 2009 .
[5] Jaeyoul Chun,et al. Cost Estimating Methods for RC Structures by Quantity Takeoff and Quantity Prediction in the Design Development Stage , 2015 .
[6] Pete Smith,et al. BIM & the 5D Project Cost Manager , 2014 .
[7] Robert Bouška. Evaluation of Maturity of BIM Tools across Different Software Platforms , 2016 .
[8] Inhan Kim,et al. Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage , 2015, J. Comput. Des. Eng..
[9] Fredrik Svalestuen,et al. Use of LoD Decision Plan in BIM-projects , 2017 .
[10] João Pedro Poças Martins,et al. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design , 2013 .
[11] Young-Jin Park,et al. BIM-assisted labor productivity measurement method for structural formwork , 2017 .
[12] J. Mark Taylor,et al. Quantity Take-Off Using Building Information Modeling (BIM), and Its Limiting Factors , 2017 .