The third comprehensive survey on scheduling problems with setup times/costs

Scheduling involving setup times/costs plays an important role in today's modern manufacturing and service environments for the delivery of reliable products on time. The setup process is not a value added factor, and hence, setup times/costs need to be explicitly considered while scheduling decisions are made in order to increase productivity, eliminate waste, improve resource utilization, and meet deadlines. However, the vast majority of existing scheduling literature, more than 90 percent, ignores this fact. The interest in scheduling problems where setup times/costs are explicitly considered began in the mid-1960s and the interest has been increasing even though not at an anticipated level. The first comprehensive review paper (Allahverdi et al., 1999) on scheduling problems with setup times/costs was in 1999 covering about 200 papers, from mid-1960s to mid-1988, while the second comprehensive review paper (Allahverdi et al., 2008) covered about 300 papers which were published from mid-1998 to mid-2006. This paper is the third comprehensive survey paper which provides an extensive review of about 500 papers that have appeared since the mid-2006 to the end of 2014, including static, dynamic, deterministic, and stochastic environments. This review paper classifies scheduling problems based on shop environments as single machine, parallel machine, flowshop, job shop, or open shop. It further classifies the problems as family and non-family as well as sequence-dependent and sequence-independent setup times/costs. Given that so many papers have been published in a relatively short period of time, different researchers have addressed the same problem independently, by even using the same methodology. Throughout the survey paper, the independently addressed problems are identified, and need for comparing these results is emphasized. Moreover, based on performance measures, shop and setup times/costs environments, the less studied problems have been identified and the need to address these problems is specified. The current survey paper, along with those of Allahverdi et al. (1999, 2008), is an up to date survey of scheduling problems involving static, dynamic, deterministic, and stochastic problems for different shop environments with setup times/costs since the first research on the topic appeared in the mid-1960s.

[1]  Ji-Bo Wang,et al.  Scheduling with past-sequence-dependent setup times and learning effects on a single machine , 2010 .

[2]  Na Yin,et al.  Single Machine Group Scheduling Problem with Deteriorating Jobs and Release Dates , 2014 .

[3]  Gilles Savard,et al.  The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times , 2006, Discret. Optim..

[4]  Tamer Eren,et al.  A bicriteria parallel machine scheduling with a learning effect of setup and removal times , 2009 .

[5]  Changkyu Park,et al.  A GRASP approach to transporter scheduling and routing at a shipyard , 2012, Comput. Ind. Eng..

[6]  Mostafa Zandieh,et al.  Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search , 2012, Expert Syst. J. Knowl. Eng..

[7]  Chung-Cheng Lu,et al.  Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints , 2011 .

[8]  Vitor Nazário Coelho,et al.  AIRP: A heuristic algorithm for solving the unrelated parallel machine scheduling problem , 2014, IEEE Congress on Evolutionary Computation.

[9]  M. Zandieh,et al.  Realistic variant of just-in-time flowshop scheduling: integration of Lp-metric method in PSO-like algorithm , 2014, The International Journal of Advanced Manufacturing Technology.

[10]  蔡啟揚,et al.  Unrelated parallel-machines scheduling with constrained resources and sequence-dependent setup time , 2007 .

[11]  Javad Behnamian,et al.  A parallel competitive colonial algorithm for JIT flowshop scheduling , 2014, J. Comput. Sci..

[12]  Mostafa Zandieh,et al.  Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics , 2010, Expert Syst. Appl..

[13]  M. Zandieh,et al.  Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time , 2011 .

[14]  Ghasem Moslehi,et al.  Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time , 2011, J. Oper. Res. Soc..

[15]  Mostafa Zandieh,et al.  Hybrid solving algorithm for complex machine scheduling problem , 2011, 2011 IEEE International Conference on Industrial Engineering and Engineering Management.

[16]  Antonio Costa,et al.  A Hybrid Metaheuristic Approach for Minimizing the Total Flow Time in A Flow Shop Sequence Dependent Group Scheduling Problem , 2014, Algorithms.

[17]  Chuen-Lung Chen,et al.  Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times , 2009 .

[18]  Mostafa Zandieh,et al.  Algorithms for a realistic variant of flowshop scheduling , 2010, Comput. Oper. Res..

[19]  Abdelwaheb Rebai,et al.  A nested iterated local search algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times , 2011, 2011 4th International Conference on Logistics.

[20]  Geraldo Robson Mateus,et al.  A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times , 2010, Comput. Oper. Res..

[21]  Bala Ram,et al.  Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups , 2007 .

[22]  Kuo-Ching Ying,et al.  Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic , 2010, Expert Syst. Appl..

[23]  E. N. Ivanov,et al.  Scheduling with sequence dependent setup times in application to Magnetic Resonance Imaging scans processing , 2009, 2009 IEEE Control Applications, (CCA) & Intelligent Control, (ISIC).

[24]  Ali Allahverdi Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times , 2007 .

[25]  Marcello Braglia,et al.  Harmony search algorithm for single-machine scheduling problem with planned maintenance , 2014, Comput. Ind. Eng..

[26]  Faizul Huq,et al.  The analysis of scheduling rules in a flexible job shop with non-zero setup costs , 2009 .

[27]  M. Zandieh,et al.  Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms , 2009 .

[28]  Reza Tavakkoli-Moghaddam,et al.  Solving a bi-objective flowshop scheduling problem by a Multi-objective Immune System and comparing with SPEA2+ and SPGA , 2011, Adv. Eng. Softw..

[29]  Toru Eguchi,et al.  Job Shop Scheduling to Meet Due Dates With Consideration to Sequence Dependent Setup Times in a Dynamic Environment , 2012 .

[30]  Dehua Xu,et al.  Comments on "A bicriteria flowshop scheduling problem with setup times" , 2011, Appl. Math. Comput..

[31]  Ali Allahverdi,et al.  No-Wait Flowshops to Minimize Total Tardiness with Setup Times , 2015 .

[32]  Chinyao Low,et al.  Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated , 2009 .

[33]  Rasaratnam Logendran,et al.  Group-scheduling problems in electronics manufacturing , 2010, J. Sched..

[34]  Kurt M. Bretthauer,et al.  An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines , 2013, Math. Comput. Model..

[35]  M. Zandieh,et al.  A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling , 2010 .

[36]  Wen-Chiung Lee,et al.  Deteriorating job scheduling to minimize the number of late jobs with setup times , 2011, Comput. Ind. Eng..

[37]  Xingsheng Gu,et al.  An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times , 2014, Int. J. Syst. Sci..

[38]  André Gustavo dos Santos,et al.  An efficient ILS heuristic for total flow time minimization in a Flow Shop Sequence Dependent Group Scheduling problem , 2012, 2012 12th International Conference on Hybrid Intelligent Systems (HIS).

[39]  Mohamed Haouari,et al.  Development of lower bounds for the scheduling of setup tasks in serial production lines , 2013 .

[40]  Vinícius Amaral Armentano,et al.  Grasp with memory-based mechanisms for minimizing total tardiness in single machine scheduling with setup times , 2006, J. Heuristics.

[41]  Mohammad Mehdi Sepehri,et al.  An environment-driven, function-based approach to dynamic single-machine scheduling , 2013 .

[42]  Changkyu Park,et al.  A GRASP approach to transporter scheduling for ship assembly block operations management , 2013 .

[43]  Vincent A. Cicirello Weighted Tardiness Scheduling with Sequence-Dependent Setups: A Benchmark Problem for Soft Computing , 2009, SOCO 2009.

[44]  R. Sridharan,et al.  Development and analysis of hybrid genetic algorithms for flow shop scheduling with sequence dependent setup time , 2014 .

[45]  Mohsen Varmazyar,et al.  Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs , 2012 .

[46]  Marc Gravel,et al.  A genetic algorithm for solving a hybrid flexible flowshop with sequence dependent setup times , 2013, 2013 IEEE Congress on Evolutionary Computation.

[47]  Jonathan F. Bard,et al.  A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs , 2008, Eur. J. Oper. Res..

[48]  Xin Chen,et al.  Two-stage hybrid batching flowshop scheduling with blocking and machine availability constraints using genetic algorithm , 2009 .

[49]  Joaquín A. Pacheco,et al.  A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times , 2011, Comput. Math. Appl..

[50]  Lars Mönch,et al.  Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times , 2011, Comput. Ind. Eng..

[51]  Ji-Bo Wang,et al.  Single-machine group scheduling with both learning effects and deteriorating jobs , 2011, Comput. Ind. Eng..

[52]  Dehua Xu,et al.  Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect , 2010 .

[53]  Chun-Hung Liu,et al.  A Novel Encoding Scheme of PSO for Two-Machine Group Scheduling , 2010, ICSI.

[54]  Odile Bellenguez-Morineau,et al.  Tabu search and lower bound for an industrial complex shop scheduling problem , 2012, Comput. Ind. Eng..

[55]  Dayong Hu,et al.  Identical Parallel Machines Scheduling with Sequence-dependent Setup Times , 2011 .

[56]  Masahiro Inuiguchi,et al.  Column generation for sequence dependent flowshop scheduling to minimize the total weighted tardiness , 2011, 2011 IEEE International Conference on Systems, Man, and Cybernetics.

[57]  Marc Gravel,et al.  Constraint based Scheduling in a Genetic Algorithm for the Single Machine Scheduling Problem with Sequence-dependent Setup Times , 2010, IJCCI.

[58]  Mohammad Mirabi,et al.  Ant colony optimization technique for the sequence-dependent flowshop scheduling problem , 2011 .

[59]  Jacques Renaud,et al.  Optimal and heuristic solution methods for a multiprocessor machine scheduling problem , 2009, Comput. Oper. Res..

[60]  Saeid Nourali,et al.  A PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR EXIBLE ASSEMBLY JOB SHOP SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES , 2014 .

[61]  T. C. Edwin Cheng,et al.  An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint , 2007, Comput. Oper. Res..

[62]  Kamran Shahanaghi,et al.  Meta-heuristics to solve single-machine scheduling problem with sequence-dependent setup time and deteriorating jobs , 2010 .

[63]  Jian-Jun Wang,et al.  Single-machine bicriterion group scheduling with deteriorating setup times and job processing times , 2014, Appl. Math. Comput..

[64]  Yu Zhang,et al.  Single-machine ready times scheduling with group technology and proportional linear deterioration , 2014 .

[65]  Zhipeng Lü,et al.  A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times , 2014, Comput. Oper. Res..

[66]  Ghaith Rabadi,et al.  A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: enhancements and experimentations , 2014, J. Intell. Manuf..

[67]  S.M.T. Fatemi Ghomi,et al.  Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates , 2014 .

[68]  Egon Balas,et al.  Job shop scheduling with setup times, deadlines and precedence constraints , 2008, J. Sched..

[69]  S. Afshin Mansouri,et al.  Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times , 2009 .

[70]  W.L. Pearn,et al.  Scheduling Integrated Circuit Assembly Operations on Die Bonder , 2007, IEEE Transactions on Electronics Packaging Manufacturing.

[71]  A. Allahverdi THREE-MACHINE FLOWSHOP SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH BOUNDED SETUP AND PROCESSING TIMES , 2008 .

[72]  Rong-Hwa Huang,et al.  No-wait two-stage multiprocessor flow shop scheduling with unit setup , 2009 .

[73]  Mostafa Zandieh,et al.  Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics , 2012 .

[74]  Qingfu Zhang,et al.  An estimation of distribution algorithm with guided mutation for a complex flow shop scheduling problem , 2007, GECCO '07.

[75]  Reza Tavakkoli-Moghaddam,et al.  A New Branch-and-Bound Algorithm for the Unrelated Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times , 2009 .

[76]  Mostafa Zandieh,et al.  Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis , 2010 .

[77]  Mostafa Zandieh,et al.  A Tabu Search Approach to Hybrid Flow Shops Scheduling with Sequence-Dependent Setup Times , 2009 .

[78]  Seyyed M. T. Fatemi Ghomi,et al.  Multi-objective fuzzy multiprocessor flowshop scheduling , 2014, Appl. Soft Comput..

[79]  Ji-Bo Wang,et al.  Single machine group scheduling with decreasing time-dependent processing times subject to release dates , 2014, Appl. Math. Comput..

[80]  Kairon Freitas Guimaraes,et al.  An Approach for Flexible Job-Shop Scheduling with Separable Sequence-Dependent Setup Time , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.

[81]  José M. Valério de Carvalho,et al.  A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times , 2007, Eur. J. Oper. Res..

[82]  Daniel Oron,et al.  Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning , 2010, RAIRO Oper. Res..

[83]  Ceyda Oguz,et al.  A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine , 2012, Comput. Oper. Res..

[84]  Ali Azadeh,et al.  An integrated neural network–simulation algorithm for performance optimisation of the bi-criteria two-stage assembly flow-shop scheduling problem with stochastic activities , 2012 .

[85]  Mansooreh Mollaghasemi,et al.  A heuristic algorithm for the just-in-time single machine scheduling problem with setups: a comparison with simulated annealing , 2007 .

[86]  Mostafa Zandieh,et al.  An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines , 2010 .

[87]  Guodong Wang,et al.  Rolling With Simplified Stream Function Velocity and Strain Rate Vector Inner Product , 2012 .

[88]  R Tavakoli Moghadam,et al.  MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS , 2008 .

[89]  Fang Zhou,et al.  An Adaptive Clonal Selection Algorithm with Stage Mutation Operation for Unrelated Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times , 2011 .

[90]  Wen-Chiung Lee,et al.  Single-machine group-scheduling problems with deteriorating setup times and job-processing times , 2008 .

[91]  Chung-Cheng Lu,et al.  Robust scheduling on a single machine to minimize total flow time , 2012, Comput. Oper. Res..

[92]  Wen-Jinn Chen,et al.  Sequencing heuristic for scheduling jobs with dependent setups in a manufacturing system , 2008 .

[93]  R. Bohn,et al.  Setup Time Reduction for Electronics Assembly: Combining Simple (SMED) and IT‐Based Methods , 2005 .

[94]  Lionel Amodeo,et al.  Metaheuristics and exact methods to solve a multiobjective parallel machines scheduling problem , 2012, J. Intell. Manuf..

[95]  V. Vinod,et al.  Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times , 2009 .

[96]  Mostafa Zandieh,et al.  Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops , 2009 .

[97]  Ali Allahverdi,et al.  A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times , 2013 .

[98]  Tamer Eren,et al.  Human and machine effects in a just-in-time scheduling problem , 2009 .

[99]  Mingyuan Chen,et al.  A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setups , 2010 .

[100]  Shih-Hsin Chen,et al.  Artificial chromosomes with genetic algorithm 2 (ACGA2) for single machine scheduling problems with sequence-dependent setup times , 2014, Appl. Soft Comput..

[101]  Dehua Xu,et al.  Erratum to “Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects” [Appl. Math. Modell. 35 (2011) 1388–1395] , 2011 .

[102]  M. Zandieh,et al.  Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers , 2012 .

[103]  King-Wah Pang,et al.  A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness , 2013 .

[104]  Marc Gravel,et al.  New Crossover Operator in a Hybrid Genetic Algorithm for the Single Machine Scheduling Problem with Sequence-dependent Setup Times , 2016, IJCCI.

[105]  Parinya Kaweegitbundit Comparison of Heuristic for Flow Shop Scheduling Problems with Sequence Dependent Setup Time , 2011 .

[106]  F. Jolai,et al.  A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem , 2014, The International Journal of Advanced Manufacturing Technology.

[107]  Dar-Li Yang,et al.  Single machine scheduling with past-sequence-dependent setup times and learning effects , 2007, Inf. Process. Lett..

[108]  Shun-Chi Yu,et al.  Elucidating multiprocessors flow shop scheduling with dependent setup times using a twin particle swarm optimization , 2014, Appl. Soft Comput..

[109]  Mohamed Kais Msakni,et al.  Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times , 2012, J. Oper. Res. Soc..

[110]  Chou-Jung Hsu,et al.  An unrelated parallel machine scheduling problem with past-sequence-dependent setup time and learning effects , 2010, The 40th International Conference on Computers & Indutrial Engineering.

[111]  Milton Soto-Ferrari,et al.  Machine scheduling with sequence-dependent setup times using a randomized search heuristic , 2009, 2009 International Conference on Computers & Industrial Engineering.

[112]  Mostafa Zandieh,et al.  Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm , 2009, Expert Syst. Appl..

[113]  Richard Y. K. Fung,et al.  A Genetic Algorithm for the Batch Scheduling with Sequence-Dependent Setup Times , 2006 .

[114]  Jatinder N. D. Gupta,et al.  Single machine group scheduling with family setups to minimize total tardiness , 2008 .

[115]  Yue Xi,et al.  Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study , 2012 .

[116]  Rasaratnam Logendran,et al.  Total flow time minimization in a flowshop sequence-dependent group scheduling problem , 2010, Comput. Oper. Res..

[117]  H. M. Soroush Bicriteria single machine scheduling with setup times and learning effects , 2012 .

[118]  Belgacem Bettayeb,et al.  An improved branch-and-bound algorithm to minimize the weighted flowtime on identical parallel machines with family setup times , 2008 .

[119]  Dayou Liu,et al.  A discrete PSO for two-stage assembly scheduling problem , 2013 .

[120]  Rasaratnam Logendran,et al.  Scheduling unrelated parallel machines with sequence-dependent setups , 2007, Comput. Oper. Res..

[121]  Tamer Eren,et al.  A bicriteria m-machine flowshop scheduling with sequence-dependent setup times , 2010 .

[122]  Wen-Chiung Lee,et al.  Scheduling with deteriorating jobs and past-sequence-dependent setup times , 2011 .

[123]  R. Tavakkoli-Moghaddam,et al.  A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem , 2011, Expert Syst. Appl..

[124]  Shih-Wei Lin,et al.  ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times , 2014, Comput. Oper. Res..

[125]  Cemal Özgüven,et al.  Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times , 2012 .

[126]  Chengbin Chu,et al.  Some dominance properties for single-machine tardiness problems with sequence-dependent setup , 2006 .

[127]  Suh-Jenq Yang,et al.  Single-machine group scheduling problems under the effects of deterioration and learning , 2010, Comput. Ind. Eng..

[128]  Hehua Zhang,et al.  Modeling job shop scheduling with batches and setup times by timed Petri nets , 2009, Math. Comput. Model..

[129]  Mostafa Zandieh,et al.  An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times , 2011, J. Intell. Manuf..

[130]  S.M.T. Fatemi Ghomi,et al.  Hybrid flowshop scheduling with machine and resource-dependent processing times , 2011 .

[131]  Ghaith Rabadi,et al.  Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times , 2006, J. Intell. Manuf..

[132]  Ramon Companys-Pascual,et al.  Programación bicriterio para máquinas en paralelo , 2009 .

[133]  Li Zheng,et al.  Dynamic parallel machine scheduling with mean weighted tardiness objective by Q-Learning , 2007 .

[134]  Jatinder N. D. Gupta,et al.  A review of scheduling research involving setup considerations , 1999 .

[135]  R. Tavakkoli-Moghaddam,et al.  Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a Pareto archive PSO combined with genetic operators and VNS , 2011 .

[136]  Mohsen Ziaee,et al.  General flowshop scheduling problem with the sequence dependent setup times: A heuristic approach , 2013, Inf. Sci..

[137]  Cheng Wu,et al.  Single machine scheduling with sequence-dependent family setups to minimize maximum lateness , 2010, J. Oper. Res. Soc..

[138]  Michael Pinedo,et al.  Production scheduling with history‐dependent setup times , 2012 .

[139]  Ali Allahverdi,et al.  The significance of reducing setup times/setup costs , 2008, Eur. J. Oper. Res..

[140]  Arash Rafiey,et al.  Coordinated scheduling of a single machine with sequence-dependent setup times and time-window constraints , 2012 .

[141]  Nyeoh Cheng Ying,et al.  Heuristic Model for Dynamic Single Machine Group Scheduling in Laser Cutting Job Shop to Minimize the Makespan , 2011 .

[142]  Sameer Sharma,et al.  Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment , 2013 .

[143]  Ching-Jong Liao,et al.  An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups , 2007, Comput. Oper. Res..

[144]  Nasser Salmasi,et al.  Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem , 2013 .

[145]  Jean-Charles Billaut,et al.  Multicriteria scheduling , 2005, Eur. J. Oper. Res..

[146]  Ji Ung Sun An Ant Colony Optimization Algorithm for the Press Shop Scheduling Problem , 2013 .

[147]  Tamer Eren,et al.  A bicriteria flowshop scheduling problem with setup times , 2006, Appl. Math. Comput..

[148]  Fariborz Jolai,et al.  A variable neighborhood search for job shop scheduling with set-up times to minimize makespan , 2009, Future Gener. Comput. Syst..

[149]  Jatinder N. D. Gupta,et al.  Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups , 2010 .

[150]  Zhenqiang Yao,et al.  Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints , 2011 .

[151]  Ertan Güner,et al.  Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs , 2010, J. Intell. Manuf..

[152]  Fariborz Jolai,et al.  Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs , 2014, Comput. Oper. Res..

[153]  Mostafa Zandieh,et al.  Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity , 2012 .

[154]  Jiazhen Huo,et al.  A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production , 2011 .

[155]  Chandrasekharan Rajendran,et al.  An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs , 2006 .

[156]  Rasoul Shafaei,et al.  No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithms , 2013, J. Exp. Theor. Artif. Intell..

[157]  L. Puigjaner,et al.  An Efficient Mixed-Integer Linear Programming Scheduling Framework for Addressing Sequence-Dependent Setup Issues in Batch Plants , 2009 .

[158]  Wojciech Bozejko,et al.  Parallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups , 2010, J. Intell. Manuf..

[159]  Arianna Alfieri,et al.  Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study , 2009 .

[160]  Rasaratnam Logendran,et al.  Non-permutation flowshop scheduling with dual resources , 2013, Expert Syst. Appl..

[161]  A. Subash Babu,et al.  Improvement of constructive heuristics using variable neighbourhood descent for scheduling a flow shop with sequence dependent setup time , 2014 .

[162]  Xue Huang,et al.  Single-machine group scheduling with general deterioration and learning effects , 2012 .

[163]  Ji-Bo Wang,et al.  Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect , 2008, Comput. Ind. Eng..

[164]  Mostafa Zandieh,et al.  Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimization , 2009, Comput. Ind. Eng..

[165]  I-Lin Wang,et al.  Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics , 2012, Flexible Services and Manufacturing Journal.

[166]  Ji-Bo Wang,et al.  Single machine group scheduling with time dependent processing times and ready times , 2014, Inf. Sci..

[167]  Dehua Xu,et al.  Comments on “A bicriteria m-machine flowshop scheduling with sequence-dependent setup times” , 2011 .

[168]  Fariborz Jolai,et al.  A novel hybrid meta-heuristic algorithm for a no-wait flexible flow shop scheduling problem with sequence dependent setup times , 2012 .

[169]  Reza Tavakkoli-Moghaddam,et al.  A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm , 2007 .

[170]  Vahit Kaplanoglu,et al.  Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance , 2014, Appl. Soft Comput..

[171]  Wen Lea Pearn,et al.  Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time , 2009, J. Oper. Res. Soc..

[172]  Parviz Fattahi,et al.  An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times , 2012, The International Journal of Advanced Manufacturing Technology.

[173]  Tatsushi Nishi,et al.  Lagrangian relaxation and cut generation for sequence-dependent setup time flowshop scheduling problems to minimise the total weighted tardiness , 2013 .

[174]  George Q. Huang,et al.  A Simulation Approach to Hybrid Flowshop Scheduling Using Dispatching Rules , 2009, DET.

[175]  Jairo R. Montoya-Torres,et al.  PRODUCTION SCHEDULING WITH SEQUENCE-DEPENDENT SETUPS AND JOB RELEASE TIMES , 2010 .

[176]  F. Fred Choobineh,et al.  A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times , 2006, Eur. J. Oper. Res..

[177]  H. M. Soroush On the scheduling with past-sequence-dependent setup times and learning effects on a single machine , 2013 .

[178]  Wen-Chiung Lee,et al.  Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs , 2012, Appl. Math. Comput..

[179]  Pedro Gómez-Gasquet,et al.  An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan , 2012, Expert Syst. Appl..

[180]  Payman Jula,et al.  Continuous-time algorithms for scheduling a single machine with sequence-dependent setup times and time window constraints in coordinated chains , 2013 .

[181]  Cai-Min Wei,et al.  Single machine quadratic penalty function scheduling with deteriorating jobs and group technology , 2010 .

[182]  André Gustavo dos Santos,et al.  Metaheuristic for parallel machines scheduling with resource-assignable sequence dependent setup times , 2011, GECCO '11.

[183]  M. Mathirajan,et al.  Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flowtime in automobile gear manufacturing , 2011, The International Journal of Advanced Manufacturing Technology.

[184]  Yih-Long Chang,et al.  Multi-criteria sequence-dependent job shop scheduling using genetic algorithms , 2009, Comput. Ind. Eng..

[185]  Erdal Erel,et al.  Customer order scheduling problem: a comparative metaheuristics study , 2008 .

[186]  Ji-Bo Wang,et al.  Group scheduling with independent setup times, ready times, and deteriorating job processing times , 2011, The International Journal of Advanced Manufacturing Technology.

[187]  Bassem Jarboui,et al.  A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times , 2011, Comput. Oper. Res..

[188]  Dionysis Bochtis,et al.  A flow-shop problem formulation of biomass handling operations scheduling , 2013 .

[189]  Nasser Salmasi,et al.  Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems , 2014 .

[190]  Camino R. Vela,et al.  A competent memetic algorithm for complex scheduling , 2012, Natural Computing.

[191]  Marcelo Seido Nagano,et al.  A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times , 2015 .

[192]  Rasaratnam Logendran,et al.  Developing Tight Lower Bounds for Hybrid Flow Shop Scheduling Problems , 2014 .

[193]  Mohammad Mirabi,et al.  A novel hybrid genetic algorithm to solve the sequence-dependent permutation flow-shop scheduling problem , 2013, The International Journal of Advanced Manufacturing Technology.

[194]  Wen-Chiung Lee,et al.  A note on single-machine scheduling with general learning effect and past-sequence-dependent setup time , 2011, Comput. Math. Appl..

[195]  Bernardo Almada-Lobo,et al.  Integrated pulp and paper mill planning and scheduling , 2012, Comput. Ind. Eng..

[196]  Qingjin Peng,et al.  Robust Metaheuristics for Scheduling Cellular Flowshop with Family Sequence-Dependent Setup Times☆ , 2014 .

[197]  Rasaratnam Logendran,et al.  A tight lower bound for makespan minimization sequence dependent flowshop group scheduling problems , 2009, 2009 International Conference on Computers & Industrial Engineering.

[198]  Lars Mönch,et al.  An integrated scheduling and material-handling approach for complex job shops: a computational study , 2012 .

[199]  Rajesh Vanchipura,et al.  Impact of varying levels of setup time on the performance of algorithms for scheduling a flow shop with sequence dependent setup time , 2013 .

[200]  Ali Allahverdi,et al.  Total completion time with makespan constraint in no-wait flowshops with setup times , 2014, Eur. J. Oper. Res..

[201]  Rene Driessel,et al.  Scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times using variable neighborhood search , 2009, 2009 International Conference on Computers & Industrial Engineering.

[202]  Andrei Tchernykh,et al.  Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers , 2009, Comput. Ind. Eng..

[203]  Yin-Yann Chen,et al.  A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—A case study for solar cell industry , 2013 .

[204]  Yih-Long Chang,et al.  A scatter search approach to sequence-dependent setup times job shop scheduling , 2009 .

[205]  Appa Iyer Sivakumar,et al.  Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups , 2009, Comput. Ind. Eng..

[206]  Mostafa Zandieh,et al.  A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic , 2009, Expert Syst. Appl..

[207]  Rajesh Vanchipura,et al.  Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times , 2013 .

[208]  M. K. Omar,et al.  Scheduling incompatible job families on a single machine: A two-level heuristic approach , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[209]  Liji Shen A tabu search algorithm for the job shop problem with sequence dependent setup times , 2014, Comput. Ind. Eng..

[210]  Mostafa Zandieh,et al.  Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: water flow-like algorithm approach , 2012 .

[211]  Bassem Jarboui,et al.  A GRASP based on DE to solve single machine scheduling problem with SDST , 2012, Comput. Optim. Appl..

[212]  Wen-Chiung Lee,et al.  Single-machine scheduling with past-sequence-dependent setup times and general effects of deterioration and learning , 2014, Optim. Lett..

[213]  Mehmet Fatih Tasgetiren,et al.  A discrete differential evolution algorithm for single machine total weighted tardiness problem with sequence dependent setup times , 2008, 2008 IEEE Congress on Evolutionary Computation (IEEE World Congress on Computational Intelligence).

[214]  R. Shafaei,et al.  An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines , 2014 .

[215]  F. Jabbarizadeh,et al.  Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints , 2009, Comput. Ind. Eng..

[216]  Reza Tavakkoli-Moghaddam,et al.  A multi-objective identical parallel machine scheduling with setup and removal times with deteriorating and learning effects , 2011, 2011 IEEE International Conference on Industrial Engineering and Engineering Management.

[217]  Pierre Lopez,et al.  Parallel machine scheduling with precedence constraints and setup times , 2010, Comput. Oper. Res..

[218]  Wen-Chiung Lee,et al.  A note on optimal policies for two group scheduling problems with deteriorating setup and processing times , 2010, Comput. Ind. Eng..

[219]  Rasaratnam Logendran,et al.  A single machine carryover sequence-dependent group scheduling in PCB manufacturing , 2013, Comput. Oper. Res..

[220]  Jean-François Cordeau,et al.  A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times , 2008, Comput. Oper. Res..

[221]  Jie Zhang,et al.  Hybrid Ant Colony Algorithm for Job Shop Schedule with Unrelated Parallel Machines , 2012 .

[222]  Jatinder N. D. Gupta,et al.  Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times , 2009 .

[223]  R. John Milne,et al.  A production scheduling problem with sequence-dependent changeover costs , 2014 .

[224]  Lionel Amodeo,et al.  Fuzzy Logic Controller Based Multiobjective Metaheuristics to Solve a Parallel Machines Scheduling Problem , 2012, J. Multiple Valued Log. Soft Comput..

[225]  Camino R. Vela,et al.  Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times , 2010, J. Heuristics.

[226]  Amir Sadrzadeh,et al.  Development of Both the AIS and PSO for Solving the Flexible Job Shop Scheduling Problem , 2013, Arabian Journal for Science and Engineering.

[227]  Rasaratnam Logendran,et al.  Bi-criteria group scheduling with sequence-dependent setup time in a flow shop , 2013, J. Oper. Res. Soc..

[228]  Jeffrey E. Schaller,et al.  An evaluation of heuristics for scheduling a non-delay permutation flow shop with family setups to minimize total earliness and tardiness , 2013, J. Oper. Res. Soc..

[229]  Yeong-Dae Kim,et al.  Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times , 2014, Comput. Oper. Res..

[230]  M. Mousakhani,et al.  Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness , 2013 .

[231]  Divya Prakash,et al.  Bi-criteria Scheduling Problems on Parallel Machines , 1995 .

[232]  Chung-Cheng Lu,et al.  Minimizing worst-case regret of makespan on a single machine with uncertain processing and setup times , 2014, Appl. Soft Comput..

[233]  Ji-Bo Wang,et al.  Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times , 2010 .

[234]  Mehdi Serairi,et al.  The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies , 2013, Eur. J. Oper. Res..

[235]  Lin Huang,et al.  Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production , 2007 .

[236]  Shunji Tanaka,et al.  An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times , 2013, Comput. Oper. Res..

[237]  Marc Gravel,et al.  Algorithms for a Hybrid Flexible Flowshop Problem with Sequence-dependent Setup Times , 2014, IJCCI.

[238]  S. Agrawal,et al.  A Flow Shop Scheduling Problem with Transportation Time and Separated Setup Time of Jobs , 2012 .

[239]  Zhenqiang Yao,et al.  Genetic algorithms for parallel machine scheduling with setup times , 2010, The 2nd International Conference on Information Science and Engineering.

[240]  Jae-Min Yu,et al.  A tabu search algorithm for unrelated parallel machine scheduling with sequence- and machine-dependent setups: minimizing total tardiness , 2013 .

[241]  Byung Soo Kim,et al.  Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms , 2012 .

[242]  Iraj Mahdavi,et al.  A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates , 2012, Appl. Soft Comput..

[243]  Jean-François Cordeau,et al.  A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine , 2009, J. Sched..

[244]  Mostafa Zandieh,et al.  An efficient bi-objective heuristic for scheduling of hybrid flow shops , 2011 .

[245]  C. T. Ng,et al.  Group scheduling and due date assignment on a single machine , 2011 .

[246]  F. Jolai,et al.  Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times , 2013 .

[247]  Javad Rezaeian,et al.  Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictions , 2014, Comput. Ind. Eng..

[248]  Shih-Wei Lin,et al.  Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times , 2012 .

[249]  Rubén Ruiz,et al.  Local Search in Complex Scheduling Problems , 2007, SLS.

[250]  Marcelo Seido Nagano,et al.  An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times , 2014, Expert Syst. Appl..

[251]  Andrea Rossi,et al.  Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships , 2014 .

[252]  Yun-fang Peng Job Shop Scheduling with Sequence-Dependent Setup Times Based on Constraint Programming Approach , 2013 .

[253]  Wu Jingjing,et al.  Modeling and Application for Multiobjective Flow-shop Scheduling Using Hybrid Genetic Algorithms , 2007 .

[254]  Bala Ram,et al.  Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups , 2006 .

[255]  J. Schaller Scheduling a permutation flow shop with family setups to minimise total tardiness , 2012 .

[256]  T. C. Edwin Cheng,et al.  Iterated Local Search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness , 2014, J. Sched..

[257]  Rubén Ruiz,et al.  A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times , 2011, Eur. J. Oper. Res..

[258]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[259]  Mostafa Zandieh,et al.  Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach , 2010, Expert Syst. Appl..

[260]  M. Zandieh,et al.  Scheduling sequence-dependent setup time job shops with preventive maintenance , 2009 .

[261]  Chengbin Chu,et al.  A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness , 2007, Eur. J. Oper. Res..

[262]  Xianpeng Wang,et al.  A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times , 2010, Comput. Oper. Res..

[263]  Jorge M. S. Valente,et al.  Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups , 2008, Comput. Oper. Res..

[264]  Suh-Jenq Yang,et al.  Parallel-machine scheduling with setup and removal times under consideration of the learning effect , 2010 .

[265]  Moacir Godinho Filho,et al.  Scheduling in flow shop with sequence-dependent setup times: literature review and analysis , 2013 .

[266]  Reza Tavakkoli-Moghaddam,et al.  Fuzzy bi-objective formulation for a parallel machine scheduling problem with machine eligibility restrictions and sequence-dependent setup times , 2014 .

[267]  Chiuh-Cheng Chyu,et al.  A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems , 2010 .

[268]  Dan Wang,et al.  Single-machine group scheduling with deteriorating jobs and allotted resource , 2014, Optim. Lett..

[269]  M. Zandieh,et al.  Due windows group scheduling using an effective hybrid optimization approach , 2010 .

[270]  Mohammad Saidi-Mehrabad,et al.  Flexible job shop scheduling with tabu search algorithms , 2007 .

[271]  Suresh Chand,et al.  Learning and forgetting effects on a group scheduling problem , 2008, Eur. J. Oper. Res..

[272]  Erdal Caniyilmaz,et al.  An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date , 2015 .

[273]  Mostafa Zandieh,et al.  A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling , 2009, J. Intell. Manuf..

[274]  Fariborz Jolai,et al.  AN ENHANCED INVASIVE WEED OPTIMIZATION FOR MAKESPAN MINIMIZATION IN A EXIBLE OWSHOP SCHEDULING PROBLEM , 2014 .

[275]  Ming Yang Sun,et al.  A Hybrid Iterated Greedy Algorithm for No-Wait Flowshop with Sequence Dependent Setup Times to Minimize Makespan , 2014 .

[276]  Ming-Zheng Wang,et al.  Single machine scheduling with a general exponential learning effect , 2012 .

[277]  Taïcir Loukil,et al.  Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints , 2013, J. Math. Model. Algorithms.

[278]  Yong He,et al.  Single-Machine Group Scheduling Problems with Deterioration to Minimize the Sum of Completion Times , 2012 .

[279]  Marc Gravel,et al.  A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times , 2012, Comput. Oper. Res..

[280]  J. Christopher Beck,et al.  A Logic-Based Benders Approach to Scheduling with Alternative Resources and Setup Times , 2011 .

[281]  Chinyao Low,et al.  Single machine group scheduling with learning effects and past-sequence-dependent setup times , 2012, Int. J. Syst. Sci..

[282]  S. F. Fatemi Ghomi,et al.  Scheduling job shop problems with sequence-dependent setup times , 2009 .

[283]  M. Zandieh,et al.  Bi-criteria flexible job-shop scheduling with sequence-dependent setup times—Variable neighborhood search approach , 2011 .

[284]  Shih-Wei Lin,et al.  Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics , 2007 .

[285]  Ji-Bo Wang,et al.  Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times , 2009, Comput. Math. Appl..

[286]  Reza Tavakkoli-Moghaddam,et al.  A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations , 2014 .

[287]  Nasser Salmasi,et al.  A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem , 2011 .

[288]  T. C. Edwin Cheng,et al.  Heuristics for two-machine flowshop scheduling with setup times and an availability constraint , 2007, Comput. Oper. Res..

[289]  Marcelo Seido Nagano,et al.  New heuristics for the no-wait flowshop with sequence-dependent setup times problem , 2015 .

[290]  Dehua Xu,et al.  Comments on A bicriteria parallel machine scheduling with a learning effect of setup and removal times , 2011 .

[291]  Shih-Wei Lin,et al.  Makespan minimization for scheduling unrelated parallel machines with setup times , 2010, Journal of Intelligent Manufacturing.

[292]  Douglas J. Morrice,et al.  Dell Uses a New Production-Scheduling Algorithm to Accommodate Increased Product Variety , 2007, Interfaces.

[293]  Pei-Chann Chang,et al.  Single-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysis , 2011, Int. J. Syst. Sci..

[294]  Behnam Vahdani,et al.  A mixed-integer linear programming model along with an electromagnetism-like algorithm for scheduling job shop production system with sequence-dependent set-up times , 2010 .

[295]  Ali Allahverdi,et al.  Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan , 2015 .

[296]  Ping Li,et al.  Modeling and Scheduling Optimization for Bulk Ore Blending Process , 2012 .

[297]  Vinícius Amaral Armentano,et al.  Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach , 2007, Eur. J. Oper. Res..

[298]  W. J. Chen Scheduling with dependent setups and maintenance in a textile company , 2009, Comput. Ind. Eng..

[299]  D.-H. Lee,et al.  Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times , 2009, J. Oper. Res. Soc..

[300]  H Hendizadeh,et al.  META- HEURISTICS FOR SCHEDULING A FLOW SHOP MANUFACTURING CELL WITH SEQUENCE DEPENDENT FAMILY SETUP TIMES , 2008 .

[301]  Xiuping Guo,et al.  Parallel Machine Scheduling with Resources Constraint and Sequence Dependent Setup Times , 2013 .

[302]  Shih-Wei Lin,et al.  A hybrid approach for single-machine tardiness problems with sequence-dependent setup times , 2008, J. Oper. Res. Soc..

[303]  Mohsen Varmazyar,et al.  Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem , 2011 .

[304]  Qingxin Guo,et al.  A new scater search approach for the singe machine total weighted tardiness scheduling problem with sequence-dependent setup times , 2011, The Fourth International Workshop on Advanced Computational Intelligence.

[305]  Hyerim Bae,et al.  Parallel Servers Scheduling with Dynamic Sequence-Dependent Setup Time , 2012 .

[306]  Manop Reodecha,et al.  A memetic algorithm-based heuristic for a scheduling problem in printed circuit board assembly , 2009, Comput. Ind. Eng..

[307]  T. C. Edwin Cheng,et al.  Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness , 2011, Comput. Oper. Res..

[308]  J. Behnamian Scheduling and worker assignment problems on hybrid flowshop with cost-related objective function , 2014 .

[309]  André Gustavo dos Santos,et al.  Iterated Local Search with Path Relinking for Solving Parallel Machines Scheduling Problem with Resource-Assignable Sequence Dependent Setup Times , 2010, EvoCOP.

[310]  Yi-Chih Hsieh,et al.  A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem , 2013, Int. J. Syst. Sci..

[311]  Rasaratnam Logendran,et al.  Bi-criteria group scheduling in hybrid flowshops , 2013 .

[312]  Shih-Hsin Chen,et al.  Bi-variate artificial chromosomes with genetic algorithm for single machine scheduling problems with sequence-dependent setup times , 2011, 2011 IEEE Congress of Evolutionary Computation (CEC).

[313]  Mostafa Zandieh,et al.  Earliness and Tardiness Minimizing on a Realistic Hybrid Flowshop Scheduling with Learning Effect by Advanced Metaheuristic , 2012, Arabian Journal for Science and Engineering.

[314]  Emre Cevikcan,et al.  Integrating parts design characteristics and scheduling on parallel machines , 2011, Expert Syst. Appl..

[315]  S. Afshin Mansouri,et al.  Bicriteria two-machine flowshop scheduling using metaheuristics , 2007, GECCO '07.

[316]  Fuh-Der Chou,et al.  Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups , 2008 .

[317]  H. M. Soroush,et al.  Stochastic bicriteria single machine scheduling with sequence-dependent job attributes and job-dependent learning effects , 2014 .

[318]  Hai-ming Liu,et al.  A new filter and fan algorithm with kick strategy for single-machine tardiness scheduling with sequence-dependent setups , 2009, 2009 IEEE International Conference on Intelligent Computing and Intelligent Systems.

[319]  Ali Allahverdi,et al.  Increasing the profitability and competitiveness in a production environment with random and bounded setup times , 2013 .

[320]  Gang Li,et al.  Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times , 2013, Optim. Lett..

[321]  Joaquín A. Pacheco,et al.  A multi-start tabu search method for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times , 2013, J. Sched..

[322]  Reza Tavakkoli-Moghaddam,et al.  Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times , 2010 .

[323]  Ching-Jong Liao,et al.  Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups , 2012, Theor. Comput. Sci..

[324]  José Elias Claudio Arroyo,et al.  Iterative Local Search Heuristic for the Single Machine Scheduling Problem with Sequence Dependent Setup Times and Due Dates , 2009, 2009 Ninth International Conference on Hybrid Intelligent Systems.

[325]  Marcone J. F. Souza,et al.  Multi-objective algorithms for the single machine scheduling problems with setup time dependent on the sequence and the job family , 2012, 2012 XXXVIII Conferencia Latinoamericana En Informatica (CLEI).

[326]  Ching-Jong Liao,et al.  Scheduling with multi-attribute setup times on two identical parallel machines , 2014 .

[327]  Mostafa Zandieh,et al.  Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times , 2012 .

[328]  João Pedro Pedroso,et al.  A tabu search for the permutation flow shop problem with sequence dependent setup times , 2014, Int. J. Data Anal. Tech. Strateg..

[329]  Jorge Puente,et al.  Combining metaheuristics for the job shop scheduling problem with sequence dependent setup times , 2006, ICSOFT.

[330]  Derya Eren Akyol,et al.  Multi-machine earliness and tardiness scheduling problem: an interconnected neural network approach , 2008 .

[331]  Marcone J. F. Souza,et al.  An Adaptive Genetic Algorithm for solving the Single Machine Scheduling Problem with Earliness , 2009, SMC.

[332]  Rong-Ho Lin,et al.  Meta-heuristic algorithms for wafer sorting scheduling problems , 2011, J. Oper. Res. Soc..

[333]  Tarek Y. ElMekkawy,et al.  Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times , 2007 .

[334]  Panos M. Pardalos,et al.  Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times , 2008, Comput. Oper. Res..

[335]  Zhao Chuan-li Single machine group scheduling problem with setup times , 2008 .

[336]  Jaime A Giraldo,et al.  Programación de Máquinas Paralelas no Relacionadas con Tiempos de Montaje dependientes de la Secuencia y Entrada Dinámica usando Algoritmos Genéticos , 2019 .

[337]  Yan Chen,et al.  Scheduling jobs on parallel machines with setup times and ready times , 2008, Comput. Ind. Eng..

[338]  Shih-Wei Lin,et al.  Scheduling jobs on dynamic parallel machines with sequence-dependent setup times , 2010 .

[339]  Christos Koulamas,et al.  Single-machine scheduling problems with past-sequence-dependent setup times , 2008, Eur. J. Oper. Res..

[340]  Jiazhen Huo,et al.  Hybrid flowshop scheduling with setup times for cold treating process in Baoshan Iron & Steel Complex , 2010, 2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM).

[341]  Saeid Nourali A Mathematical Model for Integrated Process Planning and Scheduling in Flexible Assembly Job Shop Environment with Sequence Dependent Setup Times , 2012 .

[342]  Shijin Wang ACO-based method for single machine scheduling with sequence-dependent setup time and limited capacity warehouse , 2014 .

[343]  Ji-Bo Wang,et al.  Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects , 2011 .

[344]  Mostafa Zandieh,et al.  Hybrid Electromagnetism-Like Algorithm for the Flowshop Scheduling with Sequence-Dependent Setup Times , 2008 .

[345]  Kuo-Ching Ying,et al.  Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristic , 2012 .

[346]  Yazhi Li,et al.  Hybrid harmony search for the flowline manufacturing cell scheduling problem , 2014, Proceedings of the 2014 IEEE 18th International Conference on Computer Supported Cooperative Work in Design (CSCWD).

[347]  M.-C. Wang,et al.  A niche genetic algorithm for two-machine flowshop scheduling with family sequence-dependent setup times and a common due window , 2010, 2010 IEEE International Conference on Industrial Engineering and Engineering Management.

[348]  Jie Zhang,et al.  ACO Algorithm for Scheduling Complex Unrelated Parallel Machine , 2011 .

[349]  Mostafa Zandieh,et al.  A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times , 2011, J. Intell. Manuf..

[350]  Yanqi Wang,et al.  Iterated Local Search Algorithms for the Sequence-Dependent Setup Times Flow Shop Scheduling Problem Minimizing Makespan , 2014 .

[351]  Ming Cheng Lo,et al.  Two-Machine Flexible Flow-Shop Scheduling with Setup Times , 2008 .

[352]  Mostafa Zandieh,et al.  Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness , 2009 .

[353]  Sharif H. Melouk,et al.  Parallel-machine scheduling to minimize overtime and waste costs , 2014 .

[354]  Nasser Salmasi,et al.  Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem , 2013, Comput. Ind. Eng..

[355]  T.C.E. Cheng,et al.  Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times , 2011 .

[356]  Kaibing Yang,et al.  A Bi-criteria Optimization Model and Algorithm for Scheduling in a Real-World Flow Shop with Setup Times , 2008, 2008 International Conference on Intelligent Computation Technology and Automation (ICICTA).

[357]  Yang-Kuei Lin,et al.  Unrelated parallel machine scheduling with setup times and ready times , 2014 .

[358]  Liu Zheng-gang Single machine scheduling problem with family setup times , 2009 .

[359]  Wen Lea Pearn,et al.  Solution strategies for multi-stage wafer probing scheduling problem with reentry , 2008, J. Oper. Res. Soc..

[360]  G. Wang,et al.  Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning , 2009 .

[361]  Ching-Jong Liao,et al.  Scheduling with multi-attribute setup times , 2012, Comput. Ind. Eng..

[362]  J. U. Sun,et al.  A genetic algorithm for a re-entrant job-shop scheduling problem with sequence-dependent setup times , 2009 .

[363]  Feng Chu,et al.  A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness , 2006, Appl. Math. Comput..

[364]  Reza Tavakkoli-Moghaddam,et al.  Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints , 2009, Comput. Oper. Res..

[365]  Camino R. Vela,et al.  Genetic Algorithm Combined with Tabu Search for the Job Shop Scheduling Problem with Setup Times , 2009, IWINAC.

[366]  Dario Pacciarelli,et al.  A tabu search algorithm for scheduling pharmaceutical packaging operations , 2010, Eur. J. Oper. Res..

[367]  Chuanli Zhao,et al.  Single machine scheduling with past-sequence-dependent setup times and deteriorating jobs , 2010, Comput. Ind. Eng..

[368]  Massimo Paolucci,et al.  A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times , 2009, Eur. J. Oper. Res..

[369]  Quan Ouyang,et al.  Genetic Algorithm for Single Machine Scheduling Problem with Setup Times , 2013 .

[370]  Subrata Mitra,et al.  Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times , 2014, Comput. Ind. Eng..

[371]  Rong Hu,et al.  Hybrid Differential Evolution Optimization for No-Wait Flow-Shop Scheduling with Sequence-Dependent Setup Times and Release Dates , 2011, ICIC.

[372]  V. Vinod,et al.  Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis , 2008 .

[373]  Abdelwaheb Rebai,et al.  Hybrid estimation of distribution algorithm for permutation flowshop scheduling problem with sequence dependent family setup times , 2009, 2009 International Conference on Computers & Industrial Engineering.

[374]  H. M. Soroush,et al.  Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects , 2012 .

[375]  Dong-Ho Lee,et al.  Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times , 2006, ICCSA.

[376]  Shi-Chung Chang,et al.  Scheduling flexible flow shops with sequence-dependent setup effects , 2000, IEEE Trans. Robotics Autom..

[377]  Shijin Wang Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning , 2013 .

[378]  Mostafa Zandieh,et al.  A Novel Simulated Annealing Algorithm to Hybrid Flow Shops Scheduling with Sequence-Dependent Setup Times , 2009 .

[379]  Mostafa Zandieh,et al.  A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems , 2010, J. Intell. Manuf..

[380]  Seyyed M. T. Fatemi Ghomi,et al.  A high performing metaheuristic for job shop scheduling with sequence-dependent setup times , 2010, Appl. Soft Comput..

[381]  Jatinder N. D. Gupta,et al.  Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times , 2011 .

[382]  Marcelo Seido Nagano,et al.  A new evolutionary clustering search for a no-wait flow shop problem with set-up times , 2012, Eng. Appl. Artif. Intell..

[383]  Shih-Wei Lin,et al.  Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times , 2009, Comput. Oper. Res..

[384]  Joaquín A. Pacheco,et al.  A single machine scheduling problem with availability constraints and sequence-dependent setup costs , 2011 .

[385]  Suh-Jenq Yang,et al.  Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine , 2011 .

[386]  Mohammad Bagher Fakhrzad,et al.  A NEW MULTI-OBJECTIVE JOB SHOP SCHEDULING WITH SETUP TIMES USING A HYBRID GENETIC ALGORITHM , 2013 .

[387]  T.C.E. Cheng,et al.  Scheduling problems with deteriorating jobs and learning effects including proportional setup times , 2010, Comput. Ind. Eng..

[388]  George Q. Huang,et al.  Hybrid flowshop scheduling with family setup time and inconsistent family formation , 2012 .

[389]  Vahid Majazi Dalfard,et al.  Hibridni genetski algoritam za planiranje poslova montaže na tekućoj traci s vremenima za montiranje i transport ovisnima o redoslijedu odvijanja poslova , 2011 .

[390]  André Gustavo dos Santos,et al.  Reactive GRASP with path relinking for solving parallel machines scheduling problem with resource-assignable sequence dependent setup times , 2009, 2009 World Congress on Nature & Biologically Inspired Computing (NaBIC).

[391]  Andrea Rossi,et al.  Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method , 2007 .

[392]  Jairo R. Montoya-Torres,et al.  Combining LR and 2-opt for scheduling a single machine subject to job ready times and sequence dependent setup times , 2014 .

[393]  Jianguo Yang,et al.  Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm , 2006 .

[394]  Pei-Chann Chang,et al.  A Genetic Algorithm Enhanced by Dominance Properties for Single Machine Scheduling Problems with Setup costs , 2011 .

[395]  Rubén Ruiz,et al.  Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times , 2011 .

[396]  Ali Allahverdi,et al.  Two-stage assembly scheduling problem for minimizing total tardiness with setup times , 2016 .

[397]  Fei Qiao,et al.  ACO-based scheduling for a single Batch Processing Machine in semiconductor manufacturing , 2008, 2008 IEEE International Conference on Automation Science and Engineering.

[398]  M. Zandieh,et al.  Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics , 2013 .

[399]  Chengbin Chu,et al.  Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period , 2008, Eur. J. Oper. Res..

[400]  Jeffrey E. Schaller,et al.  Minimizing total tardiness for scheduling identical parallel machines with family setups , 2014, Comput. Ind. Eng..

[401]  Nasser Salmasi,et al.  Permutation flowshops in group scheduling with sequence-dependent setup times , 2012 .

[402]  Frank Werner,et al.  A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria , 2009, Comput. Oper. Res..

[403]  Mostafa Zandieh,et al.  A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties , 2011, Expert Syst. Appl..

[404]  Wen-Jinn Chen Single-machine scheduling with family setup times in a manufacturing system , 2008 .

[405]  Reza Tavakkoli-Moghaddam,et al.  A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates , 2007 .

[406]  Chin-Chia Wu,et al.  Single-machine group scheduling with a general learning effect , 2013 .

[407]  Rasaratnam Logendran,et al.  Sequence-dependent group scheduling problem on unrelated-parallel machines , 2012, Expert Syst. Appl..

[408]  Xiangtong Qi,et al.  Vehicle scheduling with combinable delivery and pickup operations , 2009, Oper. Res. Lett..

[409]  Fawaz S. Al-Anzi,et al.  The two-stage assembly scheduling problem to minimize total completion time with setup times , 2009, Comput. Oper. Res..

[410]  Hyun Joon Shin,et al.  A scheduling algorithm for the reentrant shop: an application in semiconductor manufacture , 2007 .

[411]  Chris N. Potts,et al.  An Iterated Local Search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times , 2014 .

[412]  Mohsen Varmazyar,et al.  Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem , 2015, Ann. Oper. Res..

[413]  Chang Ouk Kim,et al.  Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times , 2012 .

[414]  Mohamed Kais Msakni,et al.  Heuristic algorithms for minimizing total completion time in a two-machine flowshop with sequence-independent setup times , 2009, 2009 International Conference on Computers & Industrial Engineering.

[415]  H. M. Soroush,et al.  Scheduling in bicriteria single machine systems with past-sequence-dependent setup times and learning effects , 2014, J. Oper. Res. Soc..

[416]  Babak Abbasi,et al.  An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems , 2012 .

[417]  Ghaith Rabadi,et al.  A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times , 2010, J. Intell. Manuf..

[418]  Fan Baoqiang A Column Generation for a Parallel Machine Scheduling with Sequence-Dependent Setup Times , 2006 .

[419]  Xiao-Yuan Wang,et al.  Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning , 2013 .

[420]  Ji-Bo Wang,et al.  Single-machine group scheduling problems with deteriorating jobs , 2008 .

[421]  Camino R. Vela,et al.  An efficient hybrid evolutionary algorithm for scheduling with setup times and weighted tardiness minimization , 2012, Soft Computing.

[422]  Camino R. Vela,et al.  Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times , 2012, Journal of Intelligent Manufacturing.

[423]  Pei-Chann Chang,et al.  Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup times , 2011, Appl. Soft Comput..

[424]  Dehua Xu,et al.  A generalisation model of learning and deteriorating effects on a single-machine scheduling with past-sequence-dependent setup times , 2012, Int. J. Comput. Integr. Manuf..

[425]  R. Logendran,et al.  Makespan minimization of a flowshop sequence-dependent group scheduling problem , 2011 .

[426]  Ji-Bo Wang,et al.  Comments on “Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times” , 2011 .

[427]  Chou-Jung Hsu,et al.  Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects , 2011 .

[428]  Mostafa Zandieh,et al.  Group scheduling in flexible flow shops: a hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism , 2011 .

[429]  Camino R. Vela,et al.  A Tabu Search Algorithm to Minimize Lateness in Scheduling Problems with Setup Times , 2009, CAEPIA.

[430]  Cheng Wu,et al.  A simulated annealing algorithm for single machine scheduling problems with family setups , 2009, Comput. Oper. Res..

[431]  Jeng-Fung Chen,et al.  Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints , 2009 .

[432]  M. Gholami,et al.  Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns , 2009 .

[433]  T. Eren A multicriteria flowshop scheduling problem with setup times , 2007 .

[434]  Dehua Xu,et al.  Notes on “Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning” , 2011 .

[435]  Reinaldo J. Moraga,et al.  A Meta-RaPS for the early/tardy single machine scheduling problem , 2009 .

[436]  Dirk Biskup,et al.  Single-machine scheduling against due dates with past-sequence-dependent setup times , 2008, Eur. J. Oper. Res..

[437]  邵惠鹤,et al.  Scheduling a three-machine no-wait flowshop with separated setup time , 2006 .

[438]  R. Shafaei,et al.  Modeling a bi-criteria two stage assembly flow shop scheduling problem with sequence dependent setup times , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.

[439]  Mostafa Zandieh,et al.  Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min–max technique , 2011, Soft Comput..

[440]  Pankaj Sharma,et al.  Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times , 2014, Frontiers of Mechanical Engineering.

[441]  Bradley E. Anderson Note on the sequence dependent setup scheduling problem (SDSSP) with earliness and tardiness penalties , 2014, Comput. Ind. Eng..

[442]  Mostafa Zandieh,et al.  An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns , 2009 .

[443]  Li-Yan Wang,et al.  Single machine group scheduling with general linear deterioration to minimize the makespan , 2009 .

[444]  Chung-Cheng Lu,et al.  Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups , 2012 .

[445]  Ghaith Rabadi,et al.  A Tabu Search Algorithm to Minimize the Makespan for the Unrelated Parallel Machines Scheduling Problem with Setup Times , 2006 .

[446]  Muh-Cherng Wu,et al.  A GA methodology for the scheduling of yarn-dyed textile production , 2009, Expert Syst. Appl..

[447]  Reza Bashirzadeh,et al.  Concurrent scheduling of manufacturing cells considering sequence-dependent family setup times and intercellular transportation times , 2015 .

[448]  Navid Sahebjamnia,et al.  A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem , 2013, Appl. Soft Comput..

[449]  Xiaoping Li,et al.  Adaptive Hybrid Algorithms for the Sequence-Dependent Setup Time Permutation Flow Shop Scheduling Problem , 2012, IEEE Transactions on Automation Science and Engineering.

[450]  Oliver Avalos-Rosales,et al.  Efficient metaheuristic algorithm and re-formulations for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times , 2015 .

[451]  M. Zandieh,et al.  Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times , 2010 .

[452]  Pei-Chann Chang,et al.  A Genetic Algorithm with Dominance Properties for Single Machine Scheduling Problems , 2007, 2007 IEEE Symposium on Computational Intelligence in Scheduling.

[453]  Wu Cheng,et al.  Dominance property based tabu search for single machine scheduling problems with family setups , 2012 .

[454]  Hyun Joon Shin,et al.  An adaptive scheduling algorithm for a parallel machine problem with rework processes , 2010 .

[455]  Rasaratnam Logendran,et al.  Carryover sequence-dependent group scheduling with the integration of internal and external setup times , 2013, Eur. J. Oper. Res..

[456]  Bahman Naderi,et al.  A bi-objective imperialist competitive algorithm for no-wait flexible flow lines with sequence dependent setup times , 2015 .

[457]  Rasaratnam Logendran,et al.  Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times , 2012 .

[458]  Hehua Zhang,et al.  A deadlock-free scheduling with sequence-dependent setup times , 2009 .

[459]  Shiegheun Koh,et al.  Heuristics for Non-Identical Parallel Machine Scheduling with Sequence Dependent Setup Times , 2014 .