A scheduling algorithm for reducing FlexRay message response time using empty minislots in dynamic segment
暂无分享,去创建一个
[1] E.G. Schmidt,et al. Message scheduling for the static segment of the FlexRay protocol , 2008, 2008 IEEE 16th Signal Processing, Communication and Applications Conference.
[2] Ece Guran Schmidt,et al. Message Scheduling for the FlexRay Protocol: The Static Segment , 2009, IEEE Transactions on Vehicular Technology.
[3] Petru Eles,et al. Timing Analysis of the FlexRay Communication Protocol , 2006, ECRTS.
[4] Kiejin Park,et al. Probabilistic delay model of dynamic message frame in flexray protocol , 2009, IEEE Transactions on Consumer Electronics.
[5] Roman Obermaisser,et al. Event-Triggered and Time-Triggered Control Paradigms , 2004, Real-Time Systems Series.
[6] Yeqiong Song,et al. Trends in Automotive Communication Systems , 2005, Proc. IEEE.
[7] Hans-Peter Schwefel,et al. Markov Chain-based Performance Evaluation of FlexRay Dynamic Segment , 2007 .
[8] Ece Guran Schmidt,et al. Message Scheduling for the FlexRay Protocol: The Dynamic Segment , 2009, IEEE Transactions on Vehicular Technology.