Integrating IVHM and Asset Design

Integrated Vehicle Health Management (IVHM) describes a set of capabilities that enable effective and efficient maintenance and operation of the target vehicle. It accounts for the collecting of data, conducting analysis, and supporting the decision-making process for sustainment and operation. The design of IVHM systems endeavours to account for all causes of failure in a disciplined, systems engineering, manner. With industry striving to reduce through-life cost, IVHM is a powerful tool to give forewarning of impending failure and hence control over the outcome. Benefits have been realised from this approach across a number of different sectors but, hindering our ability to realise further benefit from this maturing technology, is the fact that IVHM is still treated as added on to the design of the asset, rather than being a sub-system in its own right, fully integrated with the asset design. The elevation and integration of IVHM in this way will enable architectures to be chosen that accommodate health ready sub-systems from the supply chain and design trade-offs to be made, to name but two major benefits. Barriers to IVHM being integrated with the asset design are examined in this paper. The paper presents progress in overcoming them, and suggests potential solutions for those that remain. It addresses the IVHM system design from a systems engineering perspective and the integration with the asset design will be described within an industrial design process.

[1]  J.H. MacConnell,et al.  ISHM & Design: A review of the benefits of the ideal ISHM system , 2007, 2007 IEEE Aerospace Conference.

[2]  Jacek S. Stecki,et al.  The Rise and Fall of CBM (Condition Based Maintenance) , 2013 .

[3]  Peter Söderholm A system view of the No Fault Found (NFF) phenomenon , 2007, Reliab. Eng. Syst. Saf..

[4]  Brigitte Moench,et al.  Engineering Design A Systematic Approach , 2016 .

[5]  Andrew Edward Heaton A method to support the requirements trade-off of integrated vehicle health management for unmanned aerial systems , 2014 .

[6]  John C. Knight,et al.  Assurance Based Development of Critical Systems , 2007, 37th Annual IEEE/IFIP International Conference on Dependable Systems and Networks (DSN'07).

[7]  T. J. Wilmering,et al.  When good diagnostics go bad - Why maturation is still hard , 2003, 2003 IEEE Aerospace Conference Proceedings (Cat. No.03TH8652).

[8]  Don C. Price,et al.  An Integrated Health Monitoring System for an Ageless Aerospace Vehicle , 2003 .

[9]  Irem Y. Tumer,et al.  The function-failure design method , 2005 .

[10]  David D. Walden,et al.  Systems engineering handbook : a guide for system life cycle processes and activities , 2015 .

[11]  A. Tukker,et al.  New Business for Old Europe : Product-Service Development, Competitiveness and Sustainability , 2017 .

[12]  William Lidwell,et al.  Universal principles of design : 100 ways to enhance usability,influence perception, increase appeal, make better, designdecisions, and teach through design , 2003 .

[13]  Michael Pecht Economics of PHM , 2008 .

[14]  Michael E. Fagan Advances in software inspections , 1986, IEEE Transactions on Software Engineering.

[15]  Z. Williams Benefits of IVHM: an analytical approach , 2006, 2006 IEEE Aerospace Conference.

[16]  Dinesh C. Verma,et al.  Maintainability: A Key to Effective Serviceability and Maintenance Management , 1995 .

[17]  Irem Y. Tumer,et al.  Mapping function to failure mode during component development , 2003 .

[18]  Ravi Kapadia,et al.  Integrated Design of On-line Health and Prognostics Management , 2009 .

[19]  Chris Wilkinson,et al.  A maintenance planning and business case development model for the application of prognostics and health management (PHM) to electronic systems , 2007, Microelectron. Reliab..

[20]  Abhinav Saxena,et al.  Developing IVHM Requirements for Aerospace Systems , 2013 .

[21]  Peter Struss,et al.  Model-Based Tools for the Integration of Design and Diagnosis into a Common Process - A Project Report , 2002 .

[22]  Austen Rainer,et al.  A quantitative and qualitative analysis of factors affecting software processes , 2003, J. Syst. Softw..

[23]  D. Bartz,et al.  Bringing focus to IVHM solution development , 2008, 2008 IEEE AUTOTESTCON.

[24]  M. G. Walker,et al.  Next generation prognostics and health management for unmanned aircraft , 2010, 2010 IEEE Aerospace Conference.

[25]  Tim Felke,et al.  Health Ready Components-Unlocking the Potential of IVHM , 2016 .

[26]  Octavian Niculita,et al.  The Integrated Vehicle Health Management Development Process: Verification and Validation of Simulation Models , 2013 .

[27]  P.A. Scandura Integrated Vehicle Health Management as a system engineering discipline , 2005, 24th Digital Avionics Systems Conference.

[28]  A. Hess,et al.  Challenges, Issues, and Lessons Learned Chasing the “ Big P”: Real Predictive Prognostics Part 2 , 2006, 2006 IEEE Aerospace Conference.

[29]  Lawrence D. Pohlmann,et al.  Customer‐Centered Products – Creating Successful Products through Smart Requirements Management , 2001 .

[30]  Antonios Tsourdos,et al.  Software Framework for Prototyping Embedded Integrated Vehicle Health Management Applications , 2014, J. Aerosp. Inf. Syst..

[31]  Austen Rainer,et al.  Key success factors for implementing software process improvement: a maturity-based analysis , 2002, J. Syst. Softw..

[32]  Wei Lin,et al.  Towards Requirements in Systems Engineering for Aerospace IVHM Design , 2013 .

[33]  K. Keller,et al.  Systematic Improvement of Fleet Operations by Integrating Enterprise Health and Maintenance Data , 2008, 2008 IEEE Aerospace Conference.

[34]  M. Pecht,et al.  Prognostics and Health Monitoring of Electronics , 2006, 2007 International Conference on Thermal, Mechanical and Multi-Physics Simulation Experiments in Microelectronics and Micro-Systems. EuroSime 2007.

[35]  Matthew Daigle,et al.  A Model-Based Prognostics Approach Applied to Pneumatic Valves , 2011 .

[36]  Bernd Berthold,et al.  Knowledge-Based Support of System Analysis for Failure Mode andE ects Analysis , 1996 .

[37]  Ian K. Jennions,et al.  A review of Integrated Vehicle Health Management tools for legacy platforms: Challenges and opportunities , 2013 .

[38]  T.J. Wilmering,et al.  Towards a Generalized Framework for Health Management Application Integration , 2006, 2006 IEEE Autotestcon.

[39]  Joachim Karlsson,et al.  A Cost-Value Approach for Prioritizing Requirements , 1997, IEEE Softw..

[40]  V. Narayan,et al.  Effective Maintenance Management , 2004 .

[41]  Tonci Grubic,et al.  Servitization and remote monitoring technology: A literature review and research agenda , 2014 .

[42]  P. Walley Statistical Reasoning with Imprecise Probabilities , 1990 .

[43]  O. Niculita,et al.  Design for diagnostics and prognostics: A physical-functional approach , 2013, 2013 IEEE Aerospace Conference.

[44]  Bernd Bertsche,et al.  Maintenance and Reliability , 2008 .

[45]  S. Vandermerwe,et al.  Servitization of business : Adding value by adding services , 1988 .

[46]  S. Ofsthun,et al.  Health Management Engineering Environment and Open Integration Platform , 2007, 2007 IEEE Aerospace Conference.

[47]  William B. Rouse,et al.  Review and Evaluation of Empirical Research in Troubleshooting , 1985 .

[48]  A. Hess,et al.  Challenges, issues, and lessons learned chasing the "Big P". Real predictive prognostics. Part 1 , 2005, 2005 IEEE Aerospace Conference.

[49]  T.J. Wilmering,et al.  Assessing the impact of health management approaches on system total cost of ownership , 2005, 2005 IEEE Aerospace Conference.

[50]  A Harding Reliability, Maintenance and Logistic Support: A Life Cycle Approach , 2002, J. Oper. Res. Soc..

[51]  K. Keller,et al.  Establishing an approach to systematically improve the effectiveness of fleet support , 2008, 2008 IEEE AUTOTESTCON.

[52]  Irem Y. Tumer,et al.  Linking product functionality to historic failures to improve failure analysis in design , 2005 .

[53]  Burton H. Lee Using FMEA models and ontologies to build diagnostic models , 2001, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[54]  K. Datta,et al.  A methodology to quantify some IVHM requirements during RLV conceptual design , 2004, Annual Symposium Reliability and Maintainability, 2004 - RAMS.

[55]  Nesrin Sarigul-Klijn,et al.  A review of uncertainty in flight vehicle structural damage monitoring, diagnosis and control: Challenges and opportunities , 2010 .

[56]  P.A. Scandura,et al.  A unified system to provide crew alerting, electronic checklists and maintenance using IVHM , 2004, The 23rd Digital Avionics Systems Conference (IEEE Cat. No.04CH37576).

[57]  T.J. Wilmering A practical examination of model reuse in support of health management application integration , 2008, 2008 IEEE AUTOTESTCON.

[58]  T.J. Wilmering,et al.  Recent advances in IEEE standards for diagnosis and diagnostic maturation , 2006, 2006 IEEE Aerospace Conference.

[59]  Stephen B. Johnson,et al.  Conceptual Framework for a Fault Management Design Methodology , 2010 .

[60]  S. Ofsthun Integrated vehicle health management for aerospace platforms , 2002, IEEE Instrumentation & Measurement Magazine.

[61]  William R Simpson,et al.  Predictors of Organizational-Level Testability Attributes , 1987 .