Bid or no-bid decision factors of indigenous contractors in Nigeria

Purpose The decision to bid or not to bid for new projects determines contractors’ propensity for business success or failure. The purpose of this paper is to investigate the factors that affect the decision of indigenous construction contractors to bid or not to bid in Nigeria. Design/methodology/approach Analysis was conducted on data from questionnaires received from 64 engineering management employees of leading construction companies which are members of Nigeria’s Federation of Construction Industry. The study identified 41 significant decision factors often considered by Nigerian indigenous contractors before the bid. Mean item scores were obtained for each of the factors. Principal component analysis was used to point out the most significant decision factors. Findings Results revealed significant orthogonal relationships between the factors. Only 11 of the 41 factors are statistically significant to influence contractors’ decision to bid or not to bid. Most of the significant items were amongst the least rated items by the participants. The post hoc decision factors include consultant’s interpretation of project specifications, previous relationship between the intending bidder and client, availability of other projects at the time of bidding, technological complexity of the project under consideration and prequalification requirements. Others include the propensity for resource price fluctuation, business capacity of partners, amount of own work vs subcontracted work, required rate of return on investment and difficulty in obtaining finance. Originality/value The practical implication of these findings are as follows: the orthogonal relationship between the decision factors implies non-linear relationship between the factors and actual decision to bid or not to bid, and that bid success is often not predictable by bid behaviour; many of the bid decision factors rated highest by indigenous contractors seldom impact the contractors’ actual bid decisions; local and international players can adopt the significant decision factors elicited in this study for managing their structures for inter-organizational partnerships.

[1]  George Ofori,et al.  Construction in Developing Countries , 2007 .

[2]  Peter Samuel Jensen The Use of Building Information Modeling in Generating Hard Bid Estimates , 2010 .

[3]  Mohammad S. El-Mashaleh,et al.  Empirical Framework for Making the Bid/No-Bid Decision , 2013 .

[4]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[5]  P. G. Ioannou Bidding Models — Symmetry and State of Information , 1988 .

[6]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[7]  Mustafa Alshawi,et al.  Augmented process model for e-tendering: Towards integrating object models with document management systems , 2010 .

[8]  Huan Ma,et al.  Factors affecting the bid/ no bid decision making process of small to medium size contractors in Auckland , 2011 .

[9]  Mehdi Ravanshadnia,et al.  A COMPREHENSIVE BID/NO-BID DECISION MAKING FRAMEWORK FOR CONSTRUCTION COMPANIES , 2011 .

[10]  Akintola Akintoye,et al.  A Conceptual Model of Construction Contractors' Pricing Strategies , 1990 .

[11]  Oluwole Alfred Olatunji,et al.  Modelling organizations' structural adjustment to BIM adoption: a pilot study on estimating organizations , 2011, J. Inf. Technol. Constr..

[12]  M. Gates Bidding Strategies and Probabilities , 1967 .

[13]  Ali A. Shash,et al.  SUBCONTRACTORS' BIDDING DECISIONS , 1998 .

[14]  Oluwole Alfred Olatunji,et al.  Modelling the costs of corporate implementation of building information modelling , 2011 .

[15]  David Arditi,et al.  ALTERNATE PRICING STRATEGIES IN CONSTRUCTION , 2004 .

[16]  Akintola Akintoye,et al.  Pricing approaches in the construction industry , 1992 .

[17]  A. Bageis,et al.  Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors , 2009 .

[18]  Anthony N. Pettitt,et al.  Gates' bidding model , 2007 .

[19]  Martin Skitmore,et al.  Developments in contract price forecasting and bidding techniques , 1990 .

[20]  Abdulaziz M. Jarkas,et al.  Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar , 2014 .

[21]  Jacky K.H. Chung,et al.  A framework for identification and representation of client requirements in the briefing process , 2004 .

[22]  Chris Fortune,et al.  BID/ NO-BID DECISION MODELLING FOR CONSTRUCTION PROJECTS , 2006 .

[23]  Jorge Lopes,et al.  The construction industry and macroeconomy in Sub-Saharan Africa post 1970 , 1998 .

[24]  Ziad Al-Basir To bid or not to bid: A framework for contractor decision making , 2015 .

[25]  Mohammed Wanous,et al.  A neural network bid/no bid model: the case for contractors in Syria , 2003 .

[26]  Peter E.D. Love,et al.  Understanding the Landscape of Overruns in Transport Infrastructure Projects , 2015 .

[27]  P. Olomolaiye,et al.  An evaluation of clients' needs and responsibilities in the construction process , 1995 .

[28]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[29]  Ronald M. Harstad,et al.  Modeling Competitive Bidding: A Critical Essay , 1994 .

[30]  Ching-Torng Lin,et al.  Bid/no-bid decision-making – a fuzzy linguistic approach , 2004 .

[31]  Chimay J. Anumba,et al.  Establishing and processing client requirements—a key aspect of concurrent engineering in construction , 2000 .

[32]  A. Kaka,et al.  Review of Unbalanced Bidding Models in Construction , 2007 .

[33]  Xiangyu Wang,et al.  A theoretical framework of a BIM-based multi-disciplinary collaboration platform , 2011 .

[34]  Martin Skitmore,et al.  Bid Spread: an analysis of Hong Kong data , 2000 .

[35]  Weng Tat Chan,et al.  Case-based reasoning approach in bid decision making , 2001 .

[36]  Isaac Olaniyi Aje The impact of contractors' prequalification on construction project delivery in Nigeria , 2012 .

[37]  David Lowe,et al.  A logistic regression approach to modelling the contractor's decision to bid , 2004 .

[38]  Oluwole Alfred Olatunji,et al.  The impact of oil price regimes on construction cost in Nigeria , 2010 .