Project risk evaluation by using a new fuzzy model based on Elena guideline

The complexity and dynamics of the executive projects have coped contractors with substantial hazards and losses. Project risk management is a critical tool for authority to improve its performance and secure the success of the organization. However, a number of standards and approaches have been developed to formulate the projects based on their risks. The Elena guideline is a systematic standard developed by Iran Project Management Association. This guideline provides the full cycle of the risk management process. Risk evaluation is the key part of the risk management process. On the other hand, different techniques have been developed to model a risk evaluation problem. Fuzzy inference system is one of the most popular techniques that is capable of handling all types of the uncertainty involved in projects. This paper proposes a three-stage approach based on the fuzzy inference system under the environment of the Elena guideline to cope with the risky projects. Finally, an illustrative example of the risk evaluation is presented to demonstrate the potential application of the proposed model. The results show that the proposed model evaluates the risky projects efficiently and effectively.

[1]  T. Davies Landslide Hazards, Risks, and Disasters , 2015 .

[2]  Albert P.C. Chan,et al.  Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .

[3]  Salman Nazari Shirkouhi,et al.  Identifying and Analyzing Risks and Responses for Risk Management in Information Technology Outsourcing Projects Under Fuzzy Environment , 2014, Int. J. Inf. Technol. Decis. Mak..

[4]  Chris Chapman,et al.  Project risk analysis and management - PRAM the generic process , 1997 .

[5]  Chung-Li Tseng,et al.  Managing Cost Overrun Risk in Project Funding Allocation , 2005, Ann. Oper. Res..

[6]  Sara Marcelino-Sádaba,et al.  Project risk management methodology for small firms , 2014 .

[7]  Joseph H. M. Tah,et al.  A proposal for construction project risk assessment using fuzzy logic , 2000 .

[8]  Edmundas Kazimieras Zavadskas,et al.  Risk evaluation of tunneling projects , 2012 .

[9]  Donald D. Tippett,et al.  Project Risk Management Using the Project Risk FMEA , 2004 .

[10]  Siamak Haji Yakhchali,et al.  Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment , 2013 .

[11]  Robert James Chapman The Rules of Project Risk Management: Implementation Guidelines for Major Projects , 2014 .

[12]  C B Chapman A risk engineering approach to project risk management , 1990 .

[13]  Edmundas Kazimieras Zavadskas,et al.  Modeling of Contractor Selection Taking into Account Different Risk Level , 2008 .

[14]  A. Omoregie,et al.  Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .

[15]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[16]  Ramírez Gallegos,et al.  GERENCIA DE PROYECTOS INMOBILIARIOS EN EL EDIFICIO SAN MARTÍN 640: SEGÚN GUÍA DEL PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK) , 2012 .

[17]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[18]  Ludovic-Alexandre Vidal,et al.  A systems thinking approach for project vulnerability management , 2012, Kybernetes.

[19]  Karel Skokan Technological and Economic Development of Economy , 2011 .

[20]  Peter Lessing,et al.  Landslide risk assessment , 1983 .

[21]  Dale F. Cooper Project risk management guidelines : managing risk in large projects and complex procurements , 2005 .

[22]  Prasanta Kumar Dey,et al.  Managing project risk using combined analytic hierarchy process and risk map , 2010, Appl. Soft Comput..

[23]  Prasanta Kumar Dey,et al.  Project risk management: a combined analytic hierarchy process and decision tree approach , 2002 .

[24]  Nan Liu,et al.  Risk evaluation in failure mode and effects analysis with extended VIKOR method under fuzzy environment , 2012, Expert Syst. Appl..

[25]  Sylvie Nadeau,et al.  Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation. , 2012, Accident; analysis and prevention.

[26]  Christoph H. Loch,et al.  Managing the Unknown: A New Approach to Managing High Uncertainty and Risk in Projects , 2006 .

[27]  S. Meysam Mousavi,et al.  Bootstrap Technique for Risk Analysis with Interval Numbers in Bridge Construction Projects , 2011 .

[28]  Siamak Haji Yakhchali,et al.  Developing a new fuzzy inference system for pipeline risk assessment , 2013 .

[29]  Martin Schieg Risk management in construction project management , 2006 .

[30]  Siamak Haji Yakhchali,et al.  A novel fuzzy inference system for predicting roof fall rate in underground coal mines , 2013 .

[31]  Shahid Iqbal,et al.  Risk management in construction projects , 2015 .

[32]  Chia-Wei Hsu,et al.  Risk evaluation of green components to hazardous substance using FMEA and FAHP , 2009, Expert Syst. Appl..

[33]  Edmundas Kazimieras Zavadskas,et al.  Environmental impact assessment based on group decision-making methods in mining projects , 2014 .

[34]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[35]  CeravoloPaolo,et al.  An Integrated Risk Management Framework , 2014 .

[36]  P. Zou,et al.  Managing Risks in Construction Projects: Life Cycle and Stakeholder Perspectives , 2009 .

[37]  Edmundas Kazimieras Zavadskas,et al.  A Hybrid MCDM Technique for Risk Management in Construction Projects , 2018, Symmetry.

[38]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[39]  Marly Monteiro de Carvalho,et al.  Impact of risk management on project performance: the importance of soft skills , 2015 .

[40]  Reza Ghodsi,et al.  Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study , 2014 .

[41]  Edmundas Kazimieras Zavadskas,et al.  Multi-criteria Risk Assessment of a Construction Project , 2013, ITQM.

[42]  A. Akintoye,et al.  Risk analysis and management in construction , 1997 .

[43]  Selcuk Cebi,et al.  A novel approach to risk assessment for occupational health and safety using Pythagorean fuzzy AHP & fuzzy inference system , 2018 .

[44]  Salman Nazari Shirkouhi,et al.  Managing risk in information technology outsourcing: an approach for analysing and prioritising using fuzzy analytical network process , 2013, Int. J. Bus. Inf. Syst..

[45]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[46]  M. Dulaimi,et al.  Risk management framework for construction projects in developing countries , 2004 .

[47]  Cengiz Kahraman,et al.  Project risk evaluation using a fuzzy analytic hierarchy process: An application to information technology projects , 2006, Int. J. Intell. Syst..

[48]  Yuhan Wang,et al.  Risk analysis in ultra deep scientific drilling project — A fuzzy synthetic evaluation approach , 2013 .

[49]  Prasanta Kumar Dey,et al.  Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery , 2012 .

[50]  Peide Liu,et al.  A risk evaluation method for the high-tech project investment based on uncertain linguistic variables , 2011 .

[51]  Abbas Mardani,et al.  A new hybrid fuzzy cybernetic analytic network process model to identify shared risks in PPP projects , 2016 .

[52]  J. K. Vrijling,et al.  A framework for risk evaluation , 1995 .

[53]  Ana Nieto-Morote,et al.  A fuzzy approach to construction project risk assessment , 2011 .

[54]  Salman Nazari Shirkouhi,et al.  A novel methodology for evaluating the risk of CRM projects in fuzzy environment , 2012, Neural Computing and Applications.

[55]  José M. Cardoso Teixeira,et al.  Dealing with cost and time in the Portuguese construction industry , 2007 .

[56]  Abdolreza Yazdani-Chamzini,et al.  Proposing a new methodology based on fuzzy logic for tunnelling risk assessment , 2014 .

[57]  Carlo Rafele,et al.  Managing Project Risks Using a Cross Risk Breakdown Matrix , 2006 .