Some elements of the Ro‐Ro terminals
暂无分享,去创建一个
Abstract Although sea freight accounts for the major part in ro‐ro freight transportation schedule, due and timely processing of cargo and preparation for shipment are to a particular extent affecting the ro‐ro freight duration. It is therefore essential to minimize the freight processing time at the ro‐ro terminal. Otherwise ship schedule might be interfered and even the operation of a terminal itself and port traffic is affected. Another problem to be encountered quite often is that ro‐ro terminal is not in the position to physically accept and process the arriving freight. This is mainly pre‐conditioned by an insufficient number of terminal gateways, the shortage of customs and border control units, and inadequate parking/storage capacity and arrangement at the terminal. The presented paper provides a solution to the said problem by giving due emphasis to the proper calculation of the capacities of terminal gateways, customs and border control facilities. Thus an attempt is made to optimize the termina...
[1] Hong K. Lo,et al. A Cell-Based Traffic Control Formulation: Strategies and Benefits of Dynamic Timing Plans , 2001, Transp. Sci..
[2] Jonas Butkevičius. Modelling of the dependence of travel frequency on the length and duration of a journey. Improvement of city passenger transport systems , 2002 .
[3] Chandra Lalwani,et al. MODELLING PORT/FERRY CHOICE IN RORO FREIGHT TRANSPORTATION , 2002 .