Integration of Optimal Dynamic Control and Neural Network for Groundwater Quality Management

This study integrates an artificial neural network (ANN) and constrained differential dynamic programming (CDDP) to search for optimal solutions to a nonlinear time-varying groundwater remediation-planning problem. The proposed model (ANN-CDDP) determines optimal dynamic pumping schemes to minimize operating costs and meet water quality requirements. The model uses two embedded ANNs, including groundwater flow and contaminant transport models, as transition functions to predict groundwater levels and contaminant concentrations under time-varying pumping. Results demonstrate that ANN-CDDP is a simplified management model that requires considerably less computation time to solve a fine mesh problem. For example, the ANN-CDDP computing time for a case involving 364 nodes is 1/26.5 that of the conventional optimization model.

[1]  L. Jones,et al.  Optimal control of nonlinear groundwater hydraulics using differential dynamic programming , 1987 .

[2]  B. Pijanowski,et al.  Using neural networks and GIS to forecast land use changes: a Land Transformation Model , 2002 .

[3]  Mehmet Irfan Yesilnacar,et al.  Neural network prediction of nitrate in groundwater of Harran Plain, Turkey , 2008 .

[4]  Bhoop Singh,et al.  Artificial neural network model as a potential alternative for groundwater salinity forecasting , 2011 .

[5]  C. Shoemaker,et al.  Optimal time-varying pumping rates for groundwater remediation: Application of a constrained optimal control algorithm , 1992 .

[6]  Shaozhong Kang,et al.  Neural Networks to Simulate Regional Ground Water Levels Affected by Human Activities , 2008, Ground water.

[7]  C. Zheng,et al.  GROUND WATER MANAGEMENT OPTIMIZATION USING GENETIC ALGORITHMS AND SIMULATED ANNEALING: FORMULATION AND COMPARISON 1 , 1998 .

[8]  William W.-G. Yeh,et al.  Systems Analysis in Ground-Water Planning and Management , 1992 .

[9]  Ali Akbar Safavi,et al.  A simple neural network model for the determination of aquifer parameters , 2007 .

[10]  Liang-Cheng Chang,et al.  Optimizing Remediation of an Unconfined Aquifer Using a Hybrid Algorithm , 2005, Ground water.

[11]  Paulin Coulibaly,et al.  Groundwater level forecasting using artificial neural networks , 2005 .

[12]  Michael Negnevitsky,et al.  Artificial Intelligence: A Guide to Intelligent Systems , 2001 .

[13]  Liang-Cheng Chang,et al.  Optimal Remediation Design in Groundwater Systems by Intelligent Techniques , 2005, KES.

[14]  Yannis Dimopoulos,et al.  Use of some sensitivity criteria for choosing networks with good generalization ability , 1995, Neural Processing Letters.

[15]  Kumar,et al.  Neural Networks a Classroom Approach , 2004 .

[16]  Liang-Cheng Chang,et al.  Optimal planning of a dynamic pump-treat-inject groundwater remediation system , 2007 .

[17]  L. Liao,et al.  Convergence in unconstrained discrete-time differential dynamic programming , 1991 .

[18]  Liang-Cheng Chang,et al.  Optimal control algorithm and neural network for dynamic groundwater management , 2009 .

[19]  Liang-Cheng Chang,et al.  Optimizing system capacity expansion schedules for groundwater supply , 2009 .

[20]  Ching-Piao Tsai,et al.  BACK-PROPAGATION NEURAL NETWORK IN TIDAL-LEVEL FORECASTING , 2001 .

[21]  Yan Zhang,et al.  Reducing Long‐Term Remedial Costs by Transport Modeling Optimization , 2006, Ground water.

[22]  Emery Albert Coppola Optimal pumping policy for a public supply wellfield using computational neural network with decision-making methodology , 2000 .

[23]  John Duder Coastal and Ocean Engineering: The 10th Australasian Conference , 1992 .

[24]  L. L. Rogers,et al.  Optimal field-scale groundwater remediation using neural networks and the genetic algorithm. , 1995, Environmental science & technology.

[25]  Ferenc Szidarovszky,et al.  Application of Artificial Neural Networks to Complex Groundwater Management Problems , 2003 .

[26]  Barbara S. Minsker,et al.  ONE-WAY SPATIAL MULTISCALE METHOD FOR OPTIMAL BIOREMEDIATION DESIGN , 2001 .

[27]  D. McKinney,et al.  Genetic algorithm solution of groundwater management models , 1994 .

[28]  Philip E. Gill,et al.  Practical optimization , 1981 .

[29]  Hakan Başaǧaoǧlu,et al.  Joint Management of Surface and Ground Water Supplies , 1999 .

[30]  Peter K. Kitanidis,et al.  Optimal conjunctive‐use operations and plans , 1998 .

[31]  Yong Liu,et al.  Efficient Multiscale Methods for Optimal In Situ Bioremediation Design , 2002 .

[32]  P. Gill,et al.  Aquifer Reclamation Design: The Use of Contaminant Transport Simulation Combined With Nonlinear Programing , 1984 .

[33]  Liang-Cheng Chang,et al.  Optimizing Capacity-Expansion Planning of Groundwater Supply System between Cost and Subsidence , 2010 .

[34]  D. Nagesh Kumar,et al.  Application of Artificial Neural Networks and Particle Swarm Optimization for the Management of Groundwater Resources , 2013, Water Resources Management.

[35]  C. Shoemaker,et al.  Dynamic optimal control for groundwater remediation with flexible management periods , 1992 .

[36]  L. L. Rogers,et al.  Optimization of groundwater remediation using artificial neural networks with parallel solute transport modeling , 1994 .

[37]  François Bousquet,et al.  SINUSE: a multi-agent model to negotiate water demand management on a free access water table , 2003, Environ. Model. Softw..

[38]  S. Yakowitz,et al.  Constrained differential dynamic programming and its application to multireservoir control , 1979 .

[39]  Liang-Cheng Chang,et al.  Dynamic optimal ground water remediation including fixed and operation costs. , 2002, Ground water.

[40]  David P. Ahlfeld,et al.  PRESENCE OF NONCONVEXITY IN GROUNDWATER CONCENTRATION RESPONSE FUNCTIONS , 1998 .

[41]  Ferenc Szidarovszky,et al.  Artificial Neural Network Approach for Predicting Transient Water Levels in a Multilayered Groundwater System under Variable State, Pumping, and Climate Conditions , 2003 .

[42]  Liang-Cheng Chang,et al.  Application of Optimal Control and Fuzzy Theory for Dynamic Groundwater Remediation Design , 2009 .

[43]  Liang-Cheng Chang,et al.  Dynamic Optimal Groundwater Management with Inclusion of Fixed Costs , 2002 .

[44]  Christine A. Shoemaker,et al.  Utilizing Sparsity in Time-Varying Optimal Control of Aquifer Cleanup , 1998 .

[45]  W. Pitts,et al.  A Logical Calculus of the Ideas Immanent in Nervous Activity (1943) , 2021, Ideas That Created the Future.

[46]  S. Murty Bhallamudi,et al.  Planning Groundwater Development in Coastal Deltas with Paleo Channels , 2005 .

[47]  S. N. Rao,et al.  Planning groundwater development in coastal aquifers / Planification du développement de la ressource en eau souterraine des aquifères côtiers , 2004 .

[48]  Ferenc Szidarovszky,et al.  Multiobjective Analysis of a Public Wellfield Using Artificial Neural Networks , 2007, Ground water.

[49]  John M. Mulvey,et al.  Contaminated groundwater remediation design using simulation, optimization, and sensitivity theory: 1. Model development , 1988 .