A remedial alternative prioritization method

This study develops and tests a technique for evaluating and prioritizing alternative remedial actions for hazardous waste sites. The method is based on criteria involving risk, benefit and cost, and identifies the most cost-effective solution to a given remedial problem. Four sites on the Department of Energy's Oak Ridge National Laboratory (ORNL) property in Oak Ridge, Tennessee, were used in a case study to develop and test the method. Results of the case study indicate that even if the cap providing in situ containment must be replaced every 10 years, it is a superior alternative to total excavation of the waste sites.