Construction automation and robotics for high-rise buildings over the past decades: A comprehensive review

Abstract Automation and robotics technology is expected to improve the productivity of the construction industry as well as to solve problems such as labor shortage and safety risks, especially for high-rise buildings. Substantial research efforts have been devoted to the field over the past decades, while the application rate at the construction sites is still limited. Although various reviews have summarized the research topics and future trends in this field, few research efforts have been made on a consideration of both academic research and practical application in the industry. Focusing on high-rise building construction, this study explores the development of both academic research and practical application of automation and robotics based on literature and market review. Scientometric and critical literature reviews were conducted to identify and analyze the development of key research areas based on academic publications from the 1980s to present. In the meantime, the development of basic technologies was summarized. The market review surveyed on existing products and developers of construction automation and robotics. By comparing the results of the literature review and market review, four development patterns of academic research and product application were identified, i.e., simultaneous development led by the same party, development at a similar pace with the two sides taking the lead in different aspects, academic research providing basic technologies for product development, and available technologies in academic research with no products found. Then three gaps in this field, i.e., the gap between academic research and products, the gap between products and application, and the gap between the construction industry and the robotics industry, were discussed with corresponding suggestions to narrow the gaps, followed by an outlook for future directions. This study contributes to the knowledge body by identifying and analyzing the key research areas and the development gaps systematically.

[1]  Francisco Herrera,et al.  Science mapping software tools: Review, analysis, and cooperative study among tools , 2011, J. Assoc. Inf. Sci. Technol..

[2]  Myo Taeg Lim,et al.  Robot-based construction automation: An application to steel beam assembly (Part II) , 2013 .

[3]  Shiu Kit Tso,et al.  Wall inspection system for safety maintenance of high-rise buildings , 2007 .

[4]  Ludo Waltman,et al.  Software survey: VOSviewer, a computer program for bibliometric mapping , 2009, Scientometrics.

[5]  Gwi-Tae Park,et al.  Robotic technologies for the automatic assemble of massive beams in high-rise building , 2007, 2007 International Conference on Control, Automation and Systems.

[6]  Moon Kyum Kim,et al.  Trend analysis of research and development on automation and robotics technology in the construction industry , 2010 .

[7]  Chang-Soo Han,et al.  The study on the integrated control system for curtain wall building façade cleaning robot , 2018, Automation in Construction.

[8]  Chang-Soo Han,et al.  Window Contamination Detection Method for the Robotic Building Maintenance System , 2011 .

[9]  Daehie Hong,et al.  Development of the Gripping Control Algorithm for Wire-Suspended Object in Steel Construction , 2007 .

[10]  Jianwei Zhang,et al.  Sky Cleaner 3: a real pneumatic climbing robot for glass-wall cleaning , 2006, IEEE Robotics & Automation Magazine.

[11]  Takashi Shiokawa,et al.  APPLICATION OF AUTOMATED BUILDING CONSTRUCTION SYSTEM FOR HIGH-RISE OFFICE BUILDING , 2000 .

[12]  Akira Nishi,et al.  Design of a robot capable of moving on a vertical wall , 1986, Adv. Robotics.

[13]  Dong In Kim,et al.  Genetic algorithm-based steel erection planning model for a construction automation system , 2012 .

[14]  Akira Nishi A biped walking robot capable of moving on a vertical wall , 1992 .

[15]  Hong Zhang,et al.  A Modular Biped Wall-Climbing Robot With High Mobility and Manipulating Function , 2013, IEEE/ASME Transactions on Mechatronics.

[16]  Soon-Wook Kwon,et al.  Basic Study of Smart Robotic Construction Lift For Increasing Resource Lifting Efficiency in High-Rise Building Construction , 2009 .

[17]  Mohan Rajesh Elara,et al.  Design of Dual Purpose Cleaning Robot , 2018 .

[18]  Mehrdad Arashpour,et al.  Analysis of citation networks in building information modeling research , 2018 .

[19]  Chang-Soo Han,et al.  Development of the curtain wall installation robot: Performance and efficiency tests at a construction site , 2007, Auton. Robots.

[20]  Shih-Chung Kang,et al.  RAS: a robotic assembly system for steel structure erection and assembly , 2017, International Journal of Intelligent Robotics and Applications.

[21]  Mohamed Al-Hussein,et al.  Building information modelling for off-site construction: Review and future directions , 2019, Automation in Construction.

[22]  Seung Yeol Lee,et al.  A multidegree-of-freedom manipulator for curtain-wall installation , 2006, J. Field Robotics.

[23]  Boyd C. Paulson,et al.  Automation and robotics for construction , 1985 .

[24]  Koji Hamada,et al.  Present Circumstances of an Automated Construction System for High-Rise Reinforced Concrete Buildings , 2000 .

[25]  Soon-Wook Kwon,et al.  A development of next generation intelligent construction liftcar toolkit for vertical material movement management , 2011 .

[26]  Hyun Myung,et al.  Measurement of Structural Displacement Using Visually Servoded Paired Structured Light System , 2011 .

[27]  Frans van Gassel,et al.  A SELF-ASSEMBLING CURTAIN WALL SYSTEM , 2007 .

[28]  Jianwei Zhang,et al.  Effective Pneumatic Scheme and Control Strategy of a Climbing Robot for Class Wall Cleaning on High-rise Buildings , 2006 .

[29]  Wooseok Choi,et al.  Design of a bolting robot for constructing steel structure , 2007, 2007 International Conference on Control, Automation and Systems.

[30]  Li Jiang,et al.  Climbot: A Bio-Inspired Modular Biped Climbing Robot—System Development, Climbing Gaits, and Experiments , 2016 .

[31]  Wei-Min Shen,et al.  Progressive image stitching algorithm for vision based automated inspection , 2016, 2016 International Conference on Machine Learning and Cybernetics (ICMLC).

[32]  Shigeyuki Yamashita,et al.  Direction-Controlled Lifting System , 1992 .

[33]  M. Murakami,et al.  Development of a semi self-contained wall climbing robot with scanning type suction cups , 1997, Proceedings of the 1997 IEEE/RSJ International Conference on Intelligent Robot and Systems. Innovative Robotics for Real-World Applications. IROS '97.

[34]  Koji Hamada,et al.  Development of automated construction system for high-rise reinforced concrete buildings , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).

[35]  Chang-Soo Han,et al.  Sensor based motion planning and estimation of highrise building façade maintenance robot , 2012 .

[36]  Thomas Bock,et al.  A Field-Oriented Test-Simulation of Embedded Lift Information System for High Rise Buildings , 2015 .

[37]  Katy Börner,et al.  Rete-netzwerk-red: analyzing and visualizing scholarly networks using the Network Workbench Tool , 2010, Scientometrics.

[38]  Nazim Mir-Nasiri,et al.  Portable Autonomous Window Cleaning Robot , 2018 .

[39]  Jian Zhu,et al.  Application of a Service Climbing Robot with Motion Planning and Visual Sensing , 2003, J. Field Robotics.

[40]  J-H. Shin,et al.  An optimized operation algorithm for twin or multi-cage lift systems for high-rise construction sites , 2012 .

[41]  Fumihiro Inoue,et al.  Automated construction system for high-rise reinforced concrete buildings , 1997 .

[42]  J. Maeda Development and Application of the SMART System , 1994 .

[43]  Daehie Hong,et al.  Mechanism and analysis of a robotic bolting device for steel beam assembly , 2010, ICCAS 2010.

[44]  F. Tong,et al.  Inspection of large tile walls for high-rise buildings based on a mechatronic mobile system , 2003, Proceedings 2003 IEEE/ASME International Conference on Advanced Intelligent Mechatronics (AIM 2003).

[45]  Akira Nishi Bipedal Walking Robot Capable of Moving on a Vertical Wall for Inspection Use , 1988 .

[46]  Chang-Soo Han,et al.  Multi-DOF (Degree of Freedom) Construction Robot for a Curtain Wall Installation of a Skyscraper , 2004 .

[47]  Heping Chen,et al.  A micro robot with the ability of fly and adhesion: Development and experiment , 2011, 2011 IEEE International Conference on Robotics and Biomimetics.

[48]  Uppu Ramachandraiah,et al.  Modelling and Realization of Pneumatics based Wall Climbing Robot for Inspection Applications , 2016 .

[49]  JongWon Kim,et al.  Parallel 2-DoF manipulator for wall-cleaning applications , 2019, Automation in Construction.

[50]  Metin Sitti,et al.  Series of Multilinked Caterpillar Track-type Climbing Robots , 2016, J. Field Robotics.

[51]  Yanheng Liu,et al.  Compliant wall-climbing robotic platform for various curvatures , 2015, 2015 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS).

[52]  Mojtaba Maghrebi,et al.  Mathematical model to optimally solve the lift planning problem in high-rise construction projects , 2018 .

[53]  Doyama Atsuhiro,et al.  Development and Application of Automated Delivery System for Finishing Building Materials , 2002 .

[54]  Jianwei Zhang,et al.  Effective Nonlinear Control Algorithms for a Series of Pneumatic Climbing Robots , 2006, 2006 IEEE International Conference on Robotics and Biomimetics.

[55]  Ed C. M. Noyons,et al.  A unified approach to mapping and clustering of bibliometric networks , 2010, J. Informetrics.

[56]  Shinsuk Park,et al.  An implementation of a teleoperation system for robotic beam assembly in construction , 2013 .

[57]  Eko Setijadi,et al.  Trajectory Tracking of a Wheeled Wall Climbing Robot Using PID Controller , 2015, 2015 International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation (ICAMIMIA).

[58]  Donghyun Kim,et al.  A Study on Vertical Zoning Algorithm of Real-Time Construction Lift Control for High-Rise Building , 2014 .

[59]  Roman Kamnik,et al.  Closed-loop control of hydraulic telescopic handler , 2010 .

[60]  Gwi-Tae Park,et al.  Development of Robotic-Crane Based Automatic Construction System for Steel Structures of High-Rise Buildings , 2011 .

[61]  Zhenmin Tang,et al.  A bat-like switched flying and adhesive robot , 2012, 2012 IEEE International Conference on Cyber Technology in Automation, Control, and Intelligent Systems (CYBER).

[62]  Norbert Elkmann,et al.  Innovative service robot systems for facade cleaning of difficult-to-access areas , 2002, IEEE/RSJ International Conference on Intelligent Robots and Systems.

[63]  Nakju Lett Doh,et al.  Development of conceptual model of construction factory for automated construction , 2009 .

[64]  Sang-Heon Lee,et al.  The application of the human-robot cooperative system for construction robot manipulating and installing heavy materials , 2006, 2006 SICE-ICASE International Joint Conference.

[65]  Soon-Wook Kwon,et al.  A Conceptualization for the Automation of a Lift Car Operation in High Rise Building Construction , 2011 .

[66]  CEng. Mice Mhkie Mhkosha Rso Tommy Y. Lo Dip. MEng,et al.  An Autonomous Robotic Cladding Inspector for High-rise Buildings in Hong Kong , 1996 .

[67]  Tatsuya Wakisaka,et al.  Automated construction system for high-rise reinforced concrete buildings , 1997 .

[68]  Sung-Hoon An,et al.  Benefit/cost analysis of a robot-based construction automation system , 2010, ICCAS 2010.

[69]  Norbert Elkmann,et al.  Kinematics, sensors and control of the fully automated façade-cleaning robot SIRIUSc for the Fraunhofer headquarters building, Munich , 2008, Ind. Robot.

[70]  Shiu Kit Tso,et al.  Robot Assisted Wall Inspection for Improved Maintenance of High-Rise Buildings , 2003 .

[71]  Jianwei Zhang,et al.  Realization of a Service Climbing Robot for Glass-wall Cleaning , 2004, 2004 IEEE International Conference on Robotics and Biomimetics.

[72]  弘守 宮城 推進力による壁面移動ロボットの研究 : 第1報, 弱風時に使用されるロボットの機構と制御 , 1991 .

[73]  S. Kantawong High Rise Building Mirror Cleaning Robot based on Image Detection and Compression Analysis with Fuzzy Ladder Control System , 2008, 2008 International Conference on Smart Manufacturing Application.

[74]  TaeWon Seo,et al.  Tank-Like Module-Based Climbing Robot Using Passive Compliant Joints , 2013, IEEE/ASME Transactions on Mechatronics.

[75]  Sung-Hoon An,et al.  Evaluating work space environment in a construction factory for automated construction , 2007, 2007 International Conference on Control, Automation and Systems.

[76]  Junichiro Maeda,et al.  Improvement of a Computer Integrated and Automated Construction System for High-Rise Building and its Application for RC (Rail City) Yokohama Building , 1997 .

[77]  Myo-Taeg Lim,et al.  Robotic automation system for steel beam assembly in building construction , 2000, 2009 4th International Conference on Autonomous Robots and Agents.

[78]  Dong-Hyung Kim,et al.  Proposal of built-in-guide-rail type building façade cleaning robot and its motion planning algorithm , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).

[79]  Daehie Hong,et al.  Force Control of Cleaning Tool System for Building Wall Maintenance Robot on Built-in Guide Rail , 2014 .

[80]  Myo-Taeg Lim,et al.  Development of Automation System for Steel Construction Based on Robotic Crane , 2008, 2008 International Conference on Smart Manufacturing Application.

[81]  Zeashan Hameed Khan,et al.  LizBOT design and prototyping of a wireless controlled wall climbing surveillance robot , 2017, 2017 International Conference on Communication Technologies (ComTech).

[82]  Thomas Bock,et al.  Development of a Fast and Effective Solution for On-Site Building Envelope Installation , 2016 .

[83]  Suyoun Lee,et al.  Human Robot Cooperative Control and Task Planning for a Glass Ceiling Installation Robot , 2008 .

[84]  Alexej Bulgakov,et al.  Control of Hovering Altitude of a Quadrotor with Shifted Centre of Gravity for Inspection of High-rise Structures , 2014 .

[85]  Xiangyu Wang,et al.  Automation and Robotics in Construction and Civil Engineering , 2015, J. Intell. Robotic Syst..

[86]  Yoshio Tajima,et al.  Fundamental Study on a Wall-Climbing Robot , 1988 .

[87]  van Fjm Frans Gassel,et al.  Assembling Wall Panels with Robotic Technologies , 2006 .

[88]  Myo-Taeg Lim,et al.  An End-Effector Design for H-beam Alignment in High-Rise Building Construction , 2008, 2008 International Conference on Smart Manufacturing Application.

[89]  Seokwon Lee,et al.  A new type of bolting robot for steel-frame structure constructions , 2008, 2008 International Conference on Control, Automation and Systems.

[90]  Yuichi Ikeda,et al.  Application of the Automated Building Construction System Using the Conventional Construction Method Together , 2006 .

[91]  Hun Hee Cho,et al.  A laser-technology-based lifting-path tracking system for a robotic tower crane , 2009 .

[92]  T. Kim,et al.  Adaptive impedance control of a cleaning unit for a novel wall-climbing mobile robotic platform (ROPE RIDE) , 2014, 2014 IEEE/ASME International Conference on Advanced Intelligent Mechatronics.

[93]  Shrinath Deshpande,et al.  Wall-climbing robot with mechanically synchronized gait , 2015, 2015 International Conference on Industrial Instrumentation and Control (ICIC).

[94]  Myo-Taeg Lim,et al.  Pre-acting manipulator for shock isolation in steel construction , 2007, 2007 International Conference on Control, Automation and Systems.

[95]  Jianwei Zhang,et al.  A series of pneumatic glass-wall cleaning robots for high-rise buildings , 2007, Ind. Robot.

[96]  Jun Zou,et al.  A gecko inspired fluid driven climbing robot , 2011, 2011 IEEE International Conference on Robotics and Automation.

[97]  Thomas Bock,et al.  The future of construction automation: Technological disruption and the upcoming ubiquity of robotics , 2015 .

[98]  Young-Bog Ham,et al.  Basic Experiment for a Fastening Device for the Vertical Outer Walls of High-Rise Buildings , 2011 .

[99]  Jian Zhu,et al.  A visual sensing application to a climbing cleaning robot on the glass surface , 2004 .

[100]  Zhiliang Ma,et al.  Application of Automation and Robotics Technology in High-Rise Building Construction: An Overview , 2018, Proceedings of the 35th International Symposium on Automation and Robotics in Construction (ISARC).

[101]  Bing Lam Luk,et al.  Application of service robots for building NDT inspection tasks , 2011, Ind. Robot.

[102]  Myo Taeg Lim,et al.  Development of 3D camera-based robust bolt-hole detection system for bolting cabin , 2014 .

[103]  S. Sakamoto,et al.  Totally Mechanized Construction System for High-Rise Buildings (T-UP System) , 1994 .

[104]  Pei-Chun Lee,et al.  Mapping knowledge structure by keyword co-occurrence: a first look at journal papers in Technology Foresight , 2010, Scientometrics.

[105]  Shigeru Sakamoto,et al.  Research and Development of Totally Mechanized Construction System for High-Rise Buildings , 1991 .

[106]  Frans van Gassel,et al.  The Development of a Concept for a Dutch Construction System for High-Rise Buildings , 2005 .