Construction automation and robotics for high-rise buildings over the past decades: A comprehensive review
暂无分享,去创建一个
Zhiliang Ma | Miroslaw J. Skibniewski | Shiyao Cai | Song Bao | M. Skibniewski | Zhiliang Ma | Shiyao Cai | Song Bao
[1] Francisco Herrera,et al. Science mapping software tools: Review, analysis, and cooperative study among tools , 2011, J. Assoc. Inf. Sci. Technol..
[2] Myo Taeg Lim,et al. Robot-based construction automation: An application to steel beam assembly (Part II) , 2013 .
[3] Shiu Kit Tso,et al. Wall inspection system for safety maintenance of high-rise buildings , 2007 .
[4] Ludo Waltman,et al. Software survey: VOSviewer, a computer program for bibliometric mapping , 2009, Scientometrics.
[5] Gwi-Tae Park,et al. Robotic technologies for the automatic assemble of massive beams in high-rise building , 2007, 2007 International Conference on Control, Automation and Systems.
[6] Moon Kyum Kim,et al. Trend analysis of research and development on automation and robotics technology in the construction industry , 2010 .
[7] Chang-Soo Han,et al. The study on the integrated control system for curtain wall building façade cleaning robot , 2018, Automation in Construction.
[8] Chang-Soo Han,et al. Window Contamination Detection Method for the Robotic Building Maintenance System , 2011 .
[9] Daehie Hong,et al. Development of the Gripping Control Algorithm for Wire-Suspended Object in Steel Construction , 2007 .
[10] Jianwei Zhang,et al. Sky Cleaner 3: a real pneumatic climbing robot for glass-wall cleaning , 2006, IEEE Robotics & Automation Magazine.
[11] Takashi Shiokawa,et al. APPLICATION OF AUTOMATED BUILDING CONSTRUCTION SYSTEM FOR HIGH-RISE OFFICE BUILDING , 2000 .
[12] Akira Nishi,et al. Design of a robot capable of moving on a vertical wall , 1986, Adv. Robotics.
[13] Dong In Kim,et al. Genetic algorithm-based steel erection planning model for a construction automation system , 2012 .
[14] Akira Nishi. A biped walking robot capable of moving on a vertical wall , 1992 .
[15] Hong Zhang,et al. A Modular Biped Wall-Climbing Robot With High Mobility and Manipulating Function , 2013, IEEE/ASME Transactions on Mechatronics.
[16] Soon-Wook Kwon,et al. Basic Study of Smart Robotic Construction Lift For Increasing Resource Lifting Efficiency in High-Rise Building Construction , 2009 .
[17] Mohan Rajesh Elara,et al. Design of Dual Purpose Cleaning Robot , 2018 .
[18] Mehrdad Arashpour,et al. Analysis of citation networks in building information modeling research , 2018 .
[19] Chang-Soo Han,et al. Development of the curtain wall installation robot: Performance and efficiency tests at a construction site , 2007, Auton. Robots.
[20] Shih-Chung Kang,et al. RAS: a robotic assembly system for steel structure erection and assembly , 2017, International Journal of Intelligent Robotics and Applications.
[21] Mohamed Al-Hussein,et al. Building information modelling for off-site construction: Review and future directions , 2019, Automation in Construction.
[22] Seung Yeol Lee,et al. A multidegree-of-freedom manipulator for curtain-wall installation , 2006, J. Field Robotics.
[23] Boyd C. Paulson,et al. Automation and robotics for construction , 1985 .
[24] Koji Hamada,et al. Present Circumstances of an Automated Construction System for High-Rise Reinforced Concrete Buildings , 2000 .
[25] Soon-Wook Kwon,et al. A development of next generation intelligent construction liftcar toolkit for vertical material movement management , 2011 .
[26] Hyun Myung,et al. Measurement of Structural Displacement Using Visually Servoded Paired Structured Light System , 2011 .
[27] Frans van Gassel,et al. A SELF-ASSEMBLING CURTAIN WALL SYSTEM , 2007 .
[28] Jianwei Zhang,et al. Effective Pneumatic Scheme and Control Strategy of a Climbing Robot for Class Wall Cleaning on High-rise Buildings , 2006 .
[29] Wooseok Choi,et al. Design of a bolting robot for constructing steel structure , 2007, 2007 International Conference on Control, Automation and Systems.
[30] Li Jiang,et al. Climbot: A Bio-Inspired Modular Biped Climbing Robot—System Development, Climbing Gaits, and Experiments , 2016 .
[31] Wei-Min Shen,et al. Progressive image stitching algorithm for vision based automated inspection , 2016, 2016 International Conference on Machine Learning and Cybernetics (ICMLC).
[32] Shigeyuki Yamashita,et al. Direction-Controlled Lifting System , 1992 .
[33] M. Murakami,et al. Development of a semi self-contained wall climbing robot with scanning type suction cups , 1997, Proceedings of the 1997 IEEE/RSJ International Conference on Intelligent Robot and Systems. Innovative Robotics for Real-World Applications. IROS '97.
[34] Koji Hamada,et al. Development of automated construction system for high-rise reinforced concrete buildings , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).
[35] Chang-Soo Han,et al. Sensor based motion planning and estimation of highrise building façade maintenance robot , 2012 .
[36] Thomas Bock,et al. A Field-Oriented Test-Simulation of Embedded Lift Information System for High Rise Buildings , 2015 .
[37] Katy Börner,et al. Rete-netzwerk-red: analyzing and visualizing scholarly networks using the Network Workbench Tool , 2010, Scientometrics.
[38] Nazim Mir-Nasiri,et al. Portable Autonomous Window Cleaning Robot , 2018 .
[39] Jian Zhu,et al. Application of a Service Climbing Robot with Motion Planning and Visual Sensing , 2003, J. Field Robotics.
[40] J-H. Shin,et al. An optimized operation algorithm for twin or multi-cage lift systems for high-rise construction sites , 2012 .
[41] Fumihiro Inoue,et al. Automated construction system for high-rise reinforced concrete buildings , 1997 .
[42] J. Maeda. Development and Application of the SMART System , 1994 .
[43] Daehie Hong,et al. Mechanism and analysis of a robotic bolting device for steel beam assembly , 2010, ICCAS 2010.
[44] F. Tong,et al. Inspection of large tile walls for high-rise buildings based on a mechatronic mobile system , 2003, Proceedings 2003 IEEE/ASME International Conference on Advanced Intelligent Mechatronics (AIM 2003).
[45] Akira Nishi. Bipedal Walking Robot Capable of Moving on a Vertical Wall for Inspection Use , 1988 .
[46] Chang-Soo Han,et al. Multi-DOF (Degree of Freedom) Construction Robot for a Curtain Wall Installation of a Skyscraper , 2004 .
[47] Heping Chen,et al. A micro robot with the ability of fly and adhesion: Development and experiment , 2011, 2011 IEEE International Conference on Robotics and Biomimetics.
[48] Uppu Ramachandraiah,et al. Modelling and Realization of Pneumatics based Wall Climbing Robot for Inspection Applications , 2016 .
[49] JongWon Kim,et al. Parallel 2-DoF manipulator for wall-cleaning applications , 2019, Automation in Construction.
[50] Metin Sitti,et al. Series of Multilinked Caterpillar Track-type Climbing Robots , 2016, J. Field Robotics.
[51] Yanheng Liu,et al. Compliant wall-climbing robotic platform for various curvatures , 2015, 2015 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS).
[52] Mojtaba Maghrebi,et al. Mathematical model to optimally solve the lift planning problem in high-rise construction projects , 2018 .
[53] Doyama Atsuhiro,et al. Development and Application of Automated Delivery System for Finishing Building Materials , 2002 .
[54] Jianwei Zhang,et al. Effective Nonlinear Control Algorithms for a Series of Pneumatic Climbing Robots , 2006, 2006 IEEE International Conference on Robotics and Biomimetics.
[55] Ed C. M. Noyons,et al. A unified approach to mapping and clustering of bibliometric networks , 2010, J. Informetrics.
[56] Shinsuk Park,et al. An implementation of a teleoperation system for robotic beam assembly in construction , 2013 .
[57] Eko Setijadi,et al. Trajectory Tracking of a Wheeled Wall Climbing Robot Using PID Controller , 2015, 2015 International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation (ICAMIMIA).
[58] Donghyun Kim,et al. A Study on Vertical Zoning Algorithm of Real-Time Construction Lift Control for High-Rise Building , 2014 .
[59] Roman Kamnik,et al. Closed-loop control of hydraulic telescopic handler , 2010 .
[60] Gwi-Tae Park,et al. Development of Robotic-Crane Based Automatic Construction System for Steel Structures of High-Rise Buildings , 2011 .
[61] Zhenmin Tang,et al. A bat-like switched flying and adhesive robot , 2012, 2012 IEEE International Conference on Cyber Technology in Automation, Control, and Intelligent Systems (CYBER).
[62] Norbert Elkmann,et al. Innovative service robot systems for facade cleaning of difficult-to-access areas , 2002, IEEE/RSJ International Conference on Intelligent Robots and Systems.
[63] Nakju Lett Doh,et al. Development of conceptual model of construction factory for automated construction , 2009 .
[64] Sang-Heon Lee,et al. The application of the human-robot cooperative system for construction robot manipulating and installing heavy materials , 2006, 2006 SICE-ICASE International Joint Conference.
[65] Soon-Wook Kwon,et al. A Conceptualization for the Automation of a Lift Car Operation in High Rise Building Construction , 2011 .
[66] CEng. Mice Mhkie Mhkosha Rso Tommy Y. Lo Dip. MEng,et al. An Autonomous Robotic Cladding Inspector for High-rise Buildings in Hong Kong , 1996 .
[67] Tatsuya Wakisaka,et al. Automated construction system for high-rise reinforced concrete buildings , 1997 .
[68] Sung-Hoon An,et al. Benefit/cost analysis of a robot-based construction automation system , 2010, ICCAS 2010.
[69] Norbert Elkmann,et al. Kinematics, sensors and control of the fully automated façade-cleaning robot SIRIUSc for the Fraunhofer headquarters building, Munich , 2008, Ind. Robot.
[70] Shiu Kit Tso,et al. Robot Assisted Wall Inspection for Improved Maintenance of High-Rise Buildings , 2003 .
[71] Jianwei Zhang,et al. Realization of a Service Climbing Robot for Glass-wall Cleaning , 2004, 2004 IEEE International Conference on Robotics and Biomimetics.
[72] 弘守 宮城. 推進力による壁面移動ロボットの研究 : 第1報, 弱風時に使用されるロボットの機構と制御 , 1991 .
[73] S. Kantawong. High Rise Building Mirror Cleaning Robot based on Image Detection and Compression Analysis with Fuzzy Ladder Control System , 2008, 2008 International Conference on Smart Manufacturing Application.
[74] TaeWon Seo,et al. Tank-Like Module-Based Climbing Robot Using Passive Compliant Joints , 2013, IEEE/ASME Transactions on Mechatronics.
[75] Sung-Hoon An,et al. Evaluating work space environment in a construction factory for automated construction , 2007, 2007 International Conference on Control, Automation and Systems.
[76] Junichiro Maeda,et al. Improvement of a Computer Integrated and Automated Construction System for High-Rise Building and its Application for RC (Rail City) Yokohama Building , 1997 .
[77] Myo-Taeg Lim,et al. Robotic automation system for steel beam assembly in building construction , 2000, 2009 4th International Conference on Autonomous Robots and Agents.
[78] Dong-Hyung Kim,et al. Proposal of built-in-guide-rail type building façade cleaning robot and its motion planning algorithm , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).
[79] Daehie Hong,et al. Force Control of Cleaning Tool System for Building Wall Maintenance Robot on Built-in Guide Rail , 2014 .
[80] Myo-Taeg Lim,et al. Development of Automation System for Steel Construction Based on Robotic Crane , 2008, 2008 International Conference on Smart Manufacturing Application.
[81] Zeashan Hameed Khan,et al. LizBOT design and prototyping of a wireless controlled wall climbing surveillance robot , 2017, 2017 International Conference on Communication Technologies (ComTech).
[82] Thomas Bock,et al. Development of a Fast and Effective Solution for On-Site Building Envelope Installation , 2016 .
[83] Suyoun Lee,et al. Human Robot Cooperative Control and Task Planning for a Glass Ceiling Installation Robot , 2008 .
[84] Alexej Bulgakov,et al. Control of Hovering Altitude of a Quadrotor with Shifted Centre of Gravity for Inspection of High-rise Structures , 2014 .
[85] Xiangyu Wang,et al. Automation and Robotics in Construction and Civil Engineering , 2015, J. Intell. Robotic Syst..
[86] Yoshio Tajima,et al. Fundamental Study on a Wall-Climbing Robot , 1988 .
[87] van Fjm Frans Gassel,et al. Assembling Wall Panels with Robotic Technologies , 2006 .
[88] Myo-Taeg Lim,et al. An End-Effector Design for H-beam Alignment in High-Rise Building Construction , 2008, 2008 International Conference on Smart Manufacturing Application.
[89] Seokwon Lee,et al. A new type of bolting robot for steel-frame structure constructions , 2008, 2008 International Conference on Control, Automation and Systems.
[90] Yuichi Ikeda,et al. Application of the Automated Building Construction System Using the Conventional Construction Method Together , 2006 .
[91] Hun Hee Cho,et al. A laser-technology-based lifting-path tracking system for a robotic tower crane , 2009 .
[92] T. Kim,et al. Adaptive impedance control of a cleaning unit for a novel wall-climbing mobile robotic platform (ROPE RIDE) , 2014, 2014 IEEE/ASME International Conference on Advanced Intelligent Mechatronics.
[93] Shrinath Deshpande,et al. Wall-climbing robot with mechanically synchronized gait , 2015, 2015 International Conference on Industrial Instrumentation and Control (ICIC).
[94] Myo-Taeg Lim,et al. Pre-acting manipulator for shock isolation in steel construction , 2007, 2007 International Conference on Control, Automation and Systems.
[95] Jianwei Zhang,et al. A series of pneumatic glass-wall cleaning robots for high-rise buildings , 2007, Ind. Robot.
[96] Jun Zou,et al. A gecko inspired fluid driven climbing robot , 2011, 2011 IEEE International Conference on Robotics and Automation.
[97] Thomas Bock,et al. The future of construction automation: Technological disruption and the upcoming ubiquity of robotics , 2015 .
[98] Young-Bog Ham,et al. Basic Experiment for a Fastening Device for the Vertical Outer Walls of High-Rise Buildings , 2011 .
[99] Jian Zhu,et al. A visual sensing application to a climbing cleaning robot on the glass surface , 2004 .
[100] Zhiliang Ma,et al. Application of Automation and Robotics Technology in High-Rise Building Construction: An Overview , 2018, Proceedings of the 35th International Symposium on Automation and Robotics in Construction (ISARC).
[101] Bing Lam Luk,et al. Application of service robots for building NDT inspection tasks , 2011, Ind. Robot.
[102] Myo Taeg Lim,et al. Development of 3D camera-based robust bolt-hole detection system for bolting cabin , 2014 .
[103] S. Sakamoto,et al. Totally Mechanized Construction System for High-Rise Buildings (T-UP System) , 1994 .
[104] Pei-Chun Lee,et al. Mapping knowledge structure by keyword co-occurrence: a first look at journal papers in Technology Foresight , 2010, Scientometrics.
[105] Shigeru Sakamoto,et al. Research and Development of Totally Mechanized Construction System for High-Rise Buildings , 1991 .
[106] Frans van Gassel,et al. The Development of a Concept for a Dutch Construction System for High-Rise Buildings , 2005 .