A fuzzy AHP-PROMETHEE II approach for evaluation of solar power plant location alternatives in Turkey

[1]  Mariano Jiménez,et al.  PROMETHEE: an extension through fuzzy mathematical programming , 2005, J. Oper. Res. Soc..

[2]  Wen-Chieh Chou,et al.  Application of fuzzy theory and PROMETHEE technique to evaluate suitable ecotechnology method: A case study in Shihmen Reservoir Watershed, Taiwan , 2007 .

[3]  Ying-Ming Wang,et al.  Centroid defuzzification and the maximizing set and minimizing set ranking based on alpha level sets , 2009, Comput. Ind. Eng..

[4]  Pablo Aragonés-Beltrán,et al.  An ANP-based approach for the selection of photovoltaic solar power plant investment projects , 2010 .

[5]  J. Arán Carrión,et al.  Environmental decision-support systems for evaluating the carrying capacity of land areas: Optimal site selection for grid-connected photovoltaic power plants , 2008 .

[6]  Ting-Yu Chen,et al.  An interval type-2 fuzzy PROMETHEE method using a likelihood-based outranking comparison approach , 2015, Inf. Fusion.

[7]  Ying-Hsiu Chen,et al.  Strategic decisions using the fuzzy PROMETHEE for IS outsourcing , 2011, Expert Syst. Appl..

[8]  P. C. Pandey,et al.  Selection of an automated inspection system using multiattribute decision analysis , 1995 .

[9]  Chun-Yu Lin,et al.  An Integrated Decision-Making Model for the Location of a PV Solar Plant , 2015 .

[10]  Bilal Akash,et al.  Multi-criteria selection of electric power plants using analytical hierarchy process , 1999 .

[11]  Fausto Cavallaro,et al.  Multi-criteria decision aid to assess concentrated solar thermal technologies , 2009 .

[12]  Jean Pierre Brans,et al.  PROMETHEE V: MCDM problems with segmentation constraints , 1992 .

[13]  Birol Elevli,et al.  Logistics freight center locations decision by using Fuzzy-PROMETHEE , 2014 .

[14]  Rajeev Jain,et al.  A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems , 2014 .

[15]  Lotfi A. Zadeh,et al.  Fuzzy logic, neural networks, and soft computing , 1993, CACM.

[16]  Heracles Polatidis,et al.  Renewable energy projects: structuring a multi-criteria group decision-making framework , 2003 .

[17]  Funda Samanlioglu,et al.  Fuzzy ANP-based PROMETHEE II approach for evaluation of machine tool alternatives , 2016, J. Intell. Fuzzy Syst..

[18]  Bertrand Mareschal,et al.  The GDSS PROMETHEE procedure: a PROMETHEE-GAIA based procedure for group decision support , 1998 .

[19]  Shuai Geng,et al.  Multi-criteria decision making on selection of solar–wind hybrid power station location: A case of China , 2014 .

[20]  J. Brans,et al.  Geometrical representations for MCDA , 1988 .

[21]  Kevin Kam Fung Yuen,et al.  Textbook Selection Using Fuzzy PROMETHEE II Method , 2012 .

[22]  Razman Mat Tahar,et al.  Selection of renewable energy sources for sustainable development of electricity generation system using analytic hierarchy process: A case of Malaysia , 2014 .

[23]  Eric Afful-Dadzie,et al.  Selecting Start-Up Businesses in a Public Venture Capital Financing using Fuzzy PROMETHEE , 2015, KES.

[24]  Golam Kabir,et al.  Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh , 2014 .

[25]  Bertrand Mareschal,et al.  The PROMETHEE-GAIA decision support system for multicriteria investigations , 1994 .

[26]  Ediz Atmaca,et al.  Evaluation of power plants in Turkey using Analytic Network Process (ANP) , 2012 .

[27]  Ümran Şengül,et al.  Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey , 2015 .

[28]  Ehsan Noorollahi,et al.  Land Suitability Analysis for Solar Farms Exploitation Using GIS and Fuzzy Analytic Hierarchy Process (FAHP)—A Case Study of Iran , 2016 .

[29]  Zeshui Xu,et al.  Multi-criteria decision making with intuitionistic fuzzy PROMETHEE , 2014, J. Intell. Fuzzy Syst..

[30]  G. Tonkay,et al.  Application of modified fuzzy ahp method to analyze bolting sequence of structural joints , 1995 .

[31]  Bertrand Mareschal,et al.  The PROMETHEE VI procedure: how to differentiate hard from soft multicriteria problems , 1995 .

[32]  Min Gao,et al.  Decision framework of solar thermal power plant site selection based on linguistic Choquet operator , 2014 .

[33]  Da Ruan,et al.  A fuzzy preference‐ranking model for a quality evaluation of hospital web sites , 2006, Int. J. Intell. Syst..

[34]  Thomas Spengler,et al.  Fuzzy outranking for environmental assessment. Case study: iron and steel making industry , 2000, Fuzzy Sets Syst..

[35]  Juan Miguel Sánchez-Lozano,et al.  Evaluation of suitable locations for the installation of solar thermoelectric power plants , 2015, Comput. Ind. Eng..

[36]  Edmundas Kazimieras Zavadskas,et al.  Sustainable and Renewable Energy: An Overview of the Application of Multiple Criteria Decision Making Techniques and Approaches , 2015 .

[37]  M. Ramachandran,et al.  Application of multi-criteria decision making to sustainable energy planning--A review , 2004 .

[38]  Reza Baradaran Kazemzadeh,et al.  PROMETHEE: A comprehensive literature review on methodologies and applications , 2010, Eur. J. Oper. Res..

[39]  Cengiz Kahraman,et al.  Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul , 2010 .

[40]  Stelios Rozakis,et al.  Multi-criteria decision making on the energy supply configuration of autonomous desalination units , 2015 .

[41]  Elke Hermans,et al.  Use of DEA and PROMETHEE II to Assess the Performance of Older Drivers , 2015 .

[42]  Armando Blanco,et al.  Constructing linguistic versions for the multicriteria decision support systems preference ranking organization method for enrichment evaluation I and II , 2003, Int. J. Intell. Syst..

[43]  Zeki Ayağ,et al.  A fuzzy AHP-based simulation approach to concept evaluation in a NPD environment , 2005 .

[44]  M. Goumas,et al.  An extension of the PROMETHEE method for decision making in fuzzy environment: Ranking of alternative energy exploitation projects , 2000, Eur. J. Oper. Res..

[45]  Rifat Gürcan Özdemir,et al.  A Fuzzy AHP Approach to Evaluating Machine Tool Alternatives , 2006, J. Intell. Manuf..

[46]  Majid Vafaeipour,et al.  Assessment of regions priority for implementation of solar projects in Iran: New application of a hybrid multi-criteria decision making approach , 2014 .

[47]  Zenonas Turskis,et al.  Multi-criteria analysis of electricity generation technologies in Lithuania , 2016 .

[48]  Orlando Durán,et al.  Computer-aided machine-tool selection based on a Fuzzy-AHP approach , 2008, Expert Syst. Appl..

[49]  Bertrand Mareschal,et al.  An interval version of PROMETHEE for the comparison of building products' design with ill-defined data on environmental quality , 1998, Eur. J. Oper. Res..

[50]  Pablo Aragonés-Beltrán,et al.  An AHP (Analytic Hierarchy Process)/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects , 2014 .

[51]  F. Lootsma Fuzzy Logic for Planning and Decision Making , 1997 .

[52]  Metin Dagdeviren,et al.  Decision making in equipment selection: an integrated approach with AHP and PROMETHEE , 2008, J. Intell. Manuf..

[53]  Ravi Shankar,et al.  An STEEP-fuzzy AHP-TOPSIS framework for evaluation and selection of thermal power plant location: A case study from India , 2012 .

[54]  Ali Azadeh,et al.  Location optimization of wind plants in Iran by an integrated hierarchical Data Envelopment Analysis , 2011 .