Hydropower scheduling and financial risk management
暂无分享,去创建一个
[1] M. Pereira. Optimal stochastic operations scheduling of large hydroelectric systems , 1989 .
[2] A. Gjelsvik,et al. Stochastic dual dynamic programming for seasonal scheduling in the Norwegian power system , 1992 .
[3] A. Gjelsvik,et al. Generation scheduling in a deregulated system. The Norwegian case , 1999 .
[4] Birger Mo,et al. Integrated risk management of hydro power scheduling and contract management , 2001 .
[5] A. Gjelsvik,et al. Optimisation of hydropower operation in a liberalised market with focus on price modelling , 2001, 2001 IEEE Porto Power Tech Proceedings (Cat. No.01EX502).
[6] A. Gjelsvik,et al. SIMULTANEOUS OPTIMISATION OF WITHDRAWAL FROM A FLEXIBLE CONTRACT AND FINANCIAL HEDGING , 2002 .
[7] W. Ziemba,et al. Hedging electricity portfolios via stochastic programming , 2002 .
[8] T. Kristiansen. TESTING OF LARGE SCALE SYSTEMS WITH A NEW TOOL FOR INTEGRATED RISK MANAGEMENT , 2002 .
[9] T. Kristiansen. Congestion management, transmission pricing and area price hedging in the Nordic region , 2004 .