An integrated system for controlling shop loading and work flow

Effective management of loading and work flow is becoming increasingly important in manufacturing. However, research has not addressed the associated dynamic internal performance issues as effectively as possible. This paper investigates an integrated approach to input and shop floor control under conditions of controlled delivery performance. Several new mechanisms are developed, including a method of dynamically adjusting buffer sizes based on system loads. Lead time and several measures related to the level and distribution of work in the system are used to evaluate performance. Results show that performance can be improved by taking loading and work flow issues into consideration when input release, dispatching and buffer space decisions are being made.

[1]  James E. Day,et al.  Review of sequencing research , 1970 .

[2]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[3]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[4]  Wolter J. Fabrycky,et al.  An Input/Output Control System For The Dynamic Job Shop , 1987 .

[5]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[6]  Michael H. Kutner Applied Linear Statistical Models , 1974 .

[7]  C. L. Moodie,et al.  A Dispatching Methodology for Balancing Workload Assignments in a Job Shop Production Facility , 1972 .

[8]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[9]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[10]  Don T. Phillips,et al.  A comparison of order release strategies in production control systems , 1992 .

[11]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[12]  Kevin J. Dooley,et al.  Dynamic rules for due-date assignment , 1991 .

[13]  S. T. Enns,et al.  Job shop leadtime requirements under conditions of controlled delivery performance , 1994 .

[14]  Randall P. Sadowski,et al.  Introduction to Simulation Using Siman , 1990 .

[15]  Hiroshi Awane,et al.  Input scheduling and load balance control for a job shop , 1984 .

[16]  S. T. Enns,et al.  A dynamic forecasting model for job shop flowtime prediction and tardiness control , 1995 .

[17]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[18]  Samuel Eilon,et al.  Due dates in job shop scheduling , 1976 .

[19]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[20]  S. T. Enns Job shop flowtime prediction and tardiness control using queueing analysis , 1993 .

[21]  William L. Berry,et al.  Critical Ratio Scheduling with Queue Waiting Time Information: An Experimental Analysis , 1976 .