Industry experience with special protection schemes

Special protection schemes are those designed to detect one or more predetermined system conditions that have a high probability of causing unusual stress on the power system, and for which preplanned remedial action is considered necessary. The failure of these schemes to accurately detect the defined conditions, or their failure to carry out the required preplanned remedial action, can lead to very serious and costly power system disturbances. It is natural, therefore, that a concern for the reliability of these schemes has been expressed. This paper reports on a joint IEEE-CIGRE survey to determine the experience with special protection schemes, and to question the designers and operators of these schemes regarding the reliability of performance. Questions were also directed to the design process itself, the reliability criteria used for the design, and the analytical methods used to assure reliability in the design.

[1]  William M. Goble High availability systems for safety and performance—the “coverage” factor , 1991 .

[2]  F. Redmill Designing for safety-some questions , 1994 .

[3]  K. Esch,et al.  The Space Shuttle: a case of subjective engineering , 1989, IEEE Spectrum.

[4]  F. J. Redmill Dependability of Critical Computer Systems 1 , 1988 .

[5]  P. M. Anderson,et al.  An improved model for protective-system reliability , 1992 .

[6]  James H. Christensen,et al.  Programmable Controller Software Architectures for Advanced Machine Diagnostics , 1985, IEEE Transactions on Industry Applications.

[7]  D. Lubkeman,et al.  The Application of Dynamic Programming in a Discrete Supplementary Control for Transient Stability Enhancement of Multimachine Power Systems , 1985, IEEE Transactions on Power Apparatus and Systems.

[8]  M. R. Bhuiyan,et al.  Designing the hardware and software of the Pacific HVDC Intertie Remedial Action Scheme using a programmable controller , 1991, Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference.

[9]  S. Takeda,et al.  Development of a generator tripping system for transient stability augmentation based on the energy function method , 1986, IEEE Power Engineering Review.

[10]  Paul Gruhn,et al.  Design considerations for high-risk safety systems , 1991 .

[11]  J. H. Doudna Application and implementation of fast valving and generator tripping schemes at Gerald Gentlemen Station , 1988 .

[12]  M. J. Beshir,et al.  Contingency Arming System Implementation for the Intermountain Power Project HVDC Transmission System , 1989, IEEE Power Engineering Review.