Stability analysis of long anchor cable reinforcement for stope roof in upward horizontal cut and fill stoping method
暂无分享,去创建一个
[1] Yukimasa Goto,et al. CRACKS FORMED IN CONCRETE AROUND DEFORMED TENSION BARS , 1971 .
[2] Zhao Ming-hua. Parameters Analysis of Grouted Bolts by Lagrangian Difference Method , 2006 .
[3] Chen Jun. Numerical analysis on the impact of rock bolt parameters on stability of surrounding rock , 2010 .
[4] D J Jarred,et al. TENDON/GROUT INTERFACE PERFORMANCE IN GROUTED ANCHORS , 1997 .
[5] Chen Anmin. Research on anchored effect of fully cement-imbedded anchor cable on weak country rock cavern , 2006 .
[6] Norman W. Hanson,et al. INFLUENCE OF SURFACE ROUGHNESS OF PRESTRESSING STRAND ON BOND PERFORMANCE , 1969 .
[7] Wang Zheng-hui. Design and numerical simulation of rock bolting and shotcrete for deep tunnels with high stress in Jinchuan Mine , 2007 .
[8] Bengt Stillborg,et al. Experimental investigation of steel cables for rock reinforcement in hard rock , 1984 .
[9] Gu Xin. MODEL EXPERIMENT STUDY ON THE DIFFERENT REINFORCEMENT EFFECTS OF UN-BONDED ANCHOR CABLE AND FULL-LENGTH BONDED ANCHOR CABLE IN ROCK ENGINEERING , 2005 .
[10] Zhang Lewen. Research on status quo of anchorage theory of rock and soil , 2002 .