Prioritized Rehabilitation of Water Distribution Networks Using Dissipated Power Concept to Reduce Non-Revenue Water
暂无分享,去创建一个
[1] G. V. Loganathan,et al. Threshold Break Rate for Pipeline Replacement in Water Distribution Systems , 2002 .
[2] Larry W. Mays,et al. Optimal Rehabilitation Model for Water‐Distribution Systems , 1993 .
[3] Bryan W. Karney,et al. Energy and Costs of Leaky Pipes: Toward Comprehensive Picture , 2002 .
[4] Barry J. Adams,et al. Water Distribution Network Renewal Planning , 2001 .
[5] Ezio Todini,et al. Looped water distribution networks design using a resilience index based heuristic approach , 2000 .
[6] B. Kingdom,et al. The challenge of reducing non-revenue water (NRW) in developing countries - how the private sector can help : a look at performance-based service contracting , 2006 .
[7] James H. Lambert,et al. Capacity Reliability of Water Distribution Networks and Optimum Rehabilitation Decision Making , 1996 .
[8] Diego Araque,et al. Water Distribution Network Operational Optimization by Maximizing the Pressure Uniformity at Service Nodes , 2005 .