On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times
暂无分享,去创建一个
[1] Frederick S. Hillier,et al. Finite Queues in Series with Exponential or Erlang Service Times - A Numerical Approach , 1966, Oper. Res..
[2] J. M. Hatcher,et al. The Effect of Internal Storage on the Production Rate of a Series of Stages Having Exponential Service Times , 1969 .
[3] A. D. Knott,et al. THE INEFFICIENCY OF A SERIES OF WORK STATIONS—A SIMPLE FORMULA , 1970 .
[4] Ray Wild,et al. A note on the operating characteristics of‘ balanced’ and ‘ unbalanced’ production flow lines , 1972 .
[5] Warren H. Thomas,et al. Balancing Stochastic Assembly Lines , 1973 .
[6] E. Muth. The production rate of a series of work stations with variable service times , 1973 .
[7] Ronald W. Wolff,et al. The Optimal Order of Service in Tandem Queues , 1974, Oper. Res..
[8] N. P. Rao,et al. A viable alternative to the ‘method of stages’ solution of series production systems with Erlang service times , 1976 .
[9] Nori Prakasa Rao,et al. A generalization of the ‘bowl phenomenon’ in series production systems , 1976 .
[10] P. De La Wyche,et al. The Design of Imbalanced Series Queue Flow Lines , 1977 .
[11] R. N. Basu,et al. The interstage buffer storage capacity of non-powered assembly lines A simple mathematical approach , 1977 .
[12] L. Douglas Smith,et al. Allocating inter-station inventory capacity in unpaced production lines with heteroscedastic processing times , 1977 .
[13] Michael J. Magazine,et al. Heuristics for determining output and work allocations in series flow lines , 1978 .
[14] E. Muth. The Reversibility Property of Production Lines , 1979 .