Environmental analysis of a construction and demolition waste recycling plant in Portugal--Part II: Environmental sensitivity analysis.

Part I of this study deals with the primary energy consumption and CO(2)eq emissions of a 350 tonnes/h construction and demolition waste (CDW) recycling facility, taking into account incorporated, operation and transportation impacts. It concludes that the generated impacts are mostly concentrated in operation and transportation, and that the impacts prevented through material recycling can be up to one order of magnitude greater than those generated. However, the conditions considered for the plant's operation and related transportation system may, and very likely will, vary in the near future, which will affect its environmental performance. This performance is particularly affected by the plant's installed capacity, transportation fuel and input CDW mass. In spite of the variations in overall primary energy and CO(2)eq balances, the prevented impacts are always higher than the generated impacts, at least by a factor of three and maybe even as high as 16 times in particular conditions. The analysis indicates environmental performance for variations in single parameters, except for the plant's capacity, which was considered to vary simultaneously with all the others. Extreme best and worst scenarios were also generated to fit the results into extreme limits.

[1]  Ernesto Antonini,et al.  Application of life-cycle assessment (LCA) methodology for valorization of building demolition materials and products , 2001, SPIE Optics East.

[2]  Giovanni Andrea Blengini,et al.  Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy , 2009 .

[3]  S. Ishikawa,et al.  Evaluation of a biogas plant from life cycle assessment (LCA) , 2006 .

[4]  Göran Finnveden,et al.  Life cycle assessment of energy from solid waste—part 1: general methodology and results , 2005 .

[5]  Jorge de Brito,et al.  Environmental analysis of a construction and demolition waste recycling plant in Portugal--Part I: energy consumption and CO2 emissions. , 2013, Waste management.

[6]  Gian Andrea Blengini,et al.  Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix , 2010 .

[7]  Giovanni De Feo,et al.  The use of LCA in selecting the best MSW management system. , 2009, Waste management.

[8]  Jorge de Brito,et al.  Economic viability analysis of a construction and demolition waste recycling plant in Portugal – part II: economic sensitivity analysis , 2013 .

[9]  R. Bohne,et al.  Projection of Construction and Demolition Waste in Norway , 2007 .

[10]  P H Tardieu,et al.  A EUROPEAN VIEW. ENERGY EFFICIENCY IN LAND TRANSPORT. PROCEEDINGS OF A SEMINAR ORGANISED BY THE COMMISSION OF THE EUROPEAN COMMUNITIES, DIRECTORATE GENERAL FOR ENERGY, LUXEMBOURG, MAY 16-18, 1988 , 1989 .

[11]  Roger Frost,et al.  International Organization for Standardization (ISO) , 2004 .

[12]  Roberto Dones,et al.  Life Cycle Inventories of Energy Systems: Results for Current Systems in Switzerland and other UCTE Countries , 2007 .

[13]  André Coelho,et al.  Generation of construction and demolition waste in Portugal , 2011, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[14]  Jorge de Brito,et al.  Economic viability analysis of a construction and demolition waste recycling plant in Portugal – part I: location, materials, technology and economic analysis , 2013 .

[15]  O Ortiz,et al.  Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. , 2010, Waste management.

[16]  M. Wittmaier,et al.  Possibilities and limitations of life cycle assessment (LCA) in the development of waste utilization systems - Applied examples for a region in Northern Germany. , 2009, Waste management.

[17]  John N. Lester,et al.  The Life-Cycle Analysis of Small-Scale Sewage-Treatment Processes , 1995 .

[18]  Maria Laura Mastellone,et al.  THE ENVIRONMENTAL PERFORMANCE OF ALTERNATIVE SOLID WASTE MANAGEMENT OPTIONS: A LIFE CYCLE ASSESSMENT STUDY , 2003 .

[19]  P Buttol,et al.  LCA of integrated MSW management systems: case study of the Bologna District. , 2007, Waste management.