Process monitoring and diagnosis by multiblock PLS methods

Schemes for monitoring the operating performance of large continuous processes using multivariate statistical projection methods such as principal component analysis (PCA ) and projection to latent structures (PLS) are extended to situations where the processes can be naturally blocked into subsections. The multiblock projection methods allow one to establish monitoring charts for the individual process subsections as well as for the entire process. When a special event or fault occurs in a subsection of the process, these multiblock methods can generally detect the event earlier and reveal the subsection within which the event has occurred. More detailed diagnostic methods based on interrogating the underlying PCA /PLS models are also developed. These methods show those process variables which are the main contributors to any deviations that have occurred, thereby allowing one to diagnose the cause of the event more easily. These ideas are demonstrated using detailed simulation studies on a multisection tubular reactor for the production of lowdensity polyethylene.

[1]  L. E. Wangen,et al.  A multiblock partial least squares algorithm for investigating complex chemical systems , 1989 .

[2]  J. Macgregor,et al.  Mathematical Modeling, Optimization, and Quality Control of High-Pressure Ethylene Polymerization Reactors , 1993 .

[3]  John F. MacGregor,et al.  Multivariate SPC charts for monitoring batch processes , 1995 .

[4]  Thomas E. Marlin,et al.  Multivariate statistical monitoring of process operating performance , 1991 .

[5]  J. E. Jackson A User's Guide to Principal Components , 1991 .

[6]  John F. MacGregor,et al.  MULTIVARIATE STATISTICAL PROCESS CONTROL AND PROPERTY INFERENCE APPLIED TO LOW DENSITY POLYETHYLENE REACTORS , 1992 .

[7]  S. Wold,et al.  The Collinearity Problem in Linear Regression. The Partial Least Squares (PLS) Approach to Generalized Inverses , 1984 .

[8]  George E. P. Box,et al.  Statistical process monitoring and feedback adjustment: a discussion , 1992 .

[9]  B. Skagerberg,et al.  Multivariate data analysis applied to low-density polyethylene reactors , 1992 .

[10]  Herman Wold,et al.  Soft modelling: The Basic Design and Some Extensions , 1982 .

[11]  S. Wold Cross-Validatory Estimation of the Number of Components in Factor and Principal Components Models , 1978 .

[12]  A. Höskuldsson PLS regression methods , 1988 .

[13]  K. A. Kosanovich,et al.  Monitoring Process Performance in Real-Time , 1992, 1992 American Control Conference.

[14]  B. Kowalski,et al.  Partial least-squares regression: a tutorial , 1986 .